Residential / Group Housing · 1 building · 79 unitsRERA P52100027329

Arunya A Wing

Its promised completion date, May 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 82% of its units are booked.

Malinagar, Pune 412109 · Promoter: GM Buildcon

Delivery5 mo past duePromised May 2026 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales82% booked65 of 79 units · as the promoter reported to MahaRERA
Arunya A Wing project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Its promised completion date, May 2026, has passed and MahaRERA does not show it completed

  • This projectRegistered 2 Dec 2020, completion promised 31 May 2026, and still not shown completed today.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100027329
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000273292 Dec 202031 May 202631 May 2026GM BuildconProject page
Documents206

2 documents held by Deedo, 204 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPAN Card GM Buildcon.pdf · uploaded 26 Nov 2020Source

Legal

  • Legal Title reportLegal Report_compressed-compressed.pdf · uploaded 26 Nov 2020Source
  • Declaration Form BForm B.pdf · uploaded 26 Nov 2020Source
  • Declaration Form BDeclaration in FORM B.pdf · uploaded 24 Feb 2023Source
  • Declaration Form BForm B.pdf · uploaded 24 Aug 2023Source
  • Declaration Form BForm B Merge compressed.pdf · uploaded 2 Oct 2023Source
Show all 206 documentsShow fewer documents

Legal

  • Declaration Form BFORM B_compressed.pdf · uploaded 4 Dec 2023Source
  • Declaration Form BSearch report 05-06-2026.pdf · uploaded 25 Jun 2026Source
  • Declaration Form BSatbara.pdf · uploaded 25 Jun 2026Source

Migrated

  • 1 PAN CardPAN Card GM Buildcon.pdf · uploaded 26 Nov 2020Source
  • 1 Copy of the legal title reportLegal Report_compressed-compressed.pdf · uploaded 26 Nov 2020Source
  • 1 Details of encumbrancesEncumbrances.pdf · uploaded 26 Nov 2020Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 26 Nov 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentLayout.pdf · uploaded 26 Nov 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate -10-08-2020-compressed (1).pdf · uploaded 26 Nov 2020Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 26 Nov 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Architech - A WING ART.pdf · uploaded 26 Nov 2020Source
  • 1 Proforma of Allotment letterAllotment Letter_compressed.pdf · uploaded 26 Nov 2020Source
  • 2 Proforma of Allotment letterARUNYA AGREEMENT DRAFT.pdf · uploaded 26 Nov 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 28 Nov 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Arunya wing A- Form 5 2020-2021.pdf · uploaded 27 Apr 2022Source
  • 3 Proforma of Allotment letterAGREEMENT- Arunya RERA Final.pdf · uploaded 1 Sep 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameArunya A wing Bank Details.pdf · uploaded 11 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)GMB Arunya A Wing Form 5.PDF · uploaded 18 Oct 2022Source
  • 2 Details of encumbrancesEncumbrance_-1.pdf · uploaded 24 Feb 2023Source
  • 3 a Details of encumbrances concerned to Financeencumbrance Legal_-2.pdf · uploaded 24 Feb 2023Source
  • 1 b Details of encumbrances concerned to Legalencumbrance Legal_-2.pdf · uploaded 24 Feb 2023Source
  • 2 Copy of Layout Approval (in case of layout)1_Copy_of_Layout_Approval__in_case_of_layout_.pdf · uploaded 24 Feb 2023Source
  • 2 Building Plan Approval / NA Order for plotted development1_Building_Plan_Approval___NA_Order_for_plotted_development.pdf · uploaded 24 Feb 2023Source
  • 2 Commencement Certificates / NA Order for plotted development1_Commencement_Certificates___NA_Order_for_plotted_development.pdf · uploaded 24 Feb 2023Source
  • 2 Declaration in FORM BDeclaration in FORM B.pdf · uploaded 24 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect_Certificate.pdf · uploaded 24 Feb 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer_Certificate.pdf · uploaded 24 Feb 2023Source
  • 1 Disclosure of sold/ booked inventorySold_Unsold_inventory.pdf · uploaded 24 Feb 2023Source
  • 4 Proforma of Allotment letterProforma of Allotment letter.pdf · uploaded 24 Feb 2023Source
  • 1 Proforma of Agreement for saleAgreement for sale.pdf · uploaded 24 Feb 2023Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameCollection Ac-253790902153.pdf · uploaded 24 Feb 2023Source
  • 1 Deviation Report with respect to Allotment letterdeviation_allotment_.pdf · uploaded 24 Feb 2023Source
  • 1 Deviation Report with respect to model copy of Agreementdeviation_allotment_.pdf · uploaded 24 Feb 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 20 Jul 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 20 Jul 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 22 Jul 2023Source
  • 3 Building Plan Approval / NA Order for plotted development2,4,6,8 Floor Plan.pdf · uploaded 27 Jul 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentClub House Plan.pdf · uploaded 27 Jul 2023Source
  • 4 Details of encumbrancesEncumbrances.pdf · uploaded 24 Aug 2023Source
  • 3 Declaration in FORM BForm B.pdf · uploaded 24 Aug 2023Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Inventory.PDF · uploaded 24 Aug 2023Source
  • 2 Deviation Report with respect to model copy of AgreementLetter of Undertaking.pdf · uploaded 24 Aug 2023Source
  • 3 Commencement Certificates / NA Order for plotted developmentCommencement certificate-9 floor (22) (1).pdf · uploaded 25 Aug 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.PDF · uploaded 15 Sep 2023Source
  • 3 Copy of Layout Approval (in case of layout)Layout plan.pdf · uploaded 21 Sep 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate uploaded on 21-09-2023-compressed-compressed.pdf · uploaded 22 Sep 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate uploaded on 21-09-2023-compressed.pdf · uploaded 22 Sep 2023Source
  • 4 Declaration in FORM BForm B Merge compressed.pdf · uploaded 2 Oct 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 10 Oct 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 10 Oct 2023Source
  • 5 Declaration in FORM BFORM B_compressed.pdf · uploaded 4 Dec 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 12 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate Shubham Chavan.pdf · uploaded 12 Jan 2024Source
  • 3 Disclosure of sold/ booked inventorysold - unsold.pdf · uploaded 12 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FOEM 5 ARUNYA A (signed).pdf · uploaded 2 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 signed_compressed.pdf · uploaded 6 Feb 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentAPPROVED PLAN.pdf · uploaded 3 May 2024Source
  • 4 Commencement Certificates / NA Order for plotted developmentCert_RB_368275_462KHvT2Sign (3).pdf · uploaded 3 May 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 16 May 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 16 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality assurance certificate.pdf · uploaded 16 May 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA_compressed.pdf · uploaded 16 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Arunya A Gm Buildcon.pdf · uploaded 18 Oct 2024Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)From 4.pdf · uploaded 20 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q1 Fy 24-25 Form 3 Gm Buildcon (2).pdf · uploaded 26 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q2 Fu 24-25 Form 3 Gm Buildcon.pdf · uploaded 26 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate q3.pdf · uploaded 1 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate q3.pdf · uploaded 1 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Foem 3 Signed_compressed.pdf · uploaded 15 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 18 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4 Fy 24-25.pdf · uploaded 19 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4 Fy 24-25.pdf · uploaded 19 May 2025Source
  • Form 1Form 1 Q4 Fy 24-25.pdf · uploaded 20 Jun 2025Source
  • Form 2Form 2 Q4 Fy 24-25.pdf · uploaded 20 Jun 2025Source
  • Form 3Form 3 Q4 Fy 24-25.pdf · uploaded 20 Jun 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 20 Jun 2025Source
  • Form 1Architect Certificate q3.pdf · uploaded 20 Jun 2025Source
  • Form 2Engineer Certificate q3.pdf · uploaded 20 Jun 2025Source
  • Form 3Foem 3 Signed_compressed.pdf · uploaded 20 Jun 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory-Rera upload.pdf · uploaded 20 Jun 2025Source
  • Form 1Form 1 Q1.pdf · uploaded 21 Jun 2025Source
  • Form 2Form 2 Q1.pdf · uploaded 21 Jun 2025Source
  • Form 3Form 3 Q1 Fy 24-25.pdf · uploaded 21 Jun 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q1.pdf · uploaded 21 Jun 2025Source
  • Form 5 (FY 2020-2021)Form 5 Fy 20-21.pdf · uploaded 23 Jul 2025Source
  • Form 5 (FY 2021-2022)FY 21-22.pdf · uploaded 23 Jul 2025Source
  • Form 5 (FY 2022-2023)FY 22-23.pdf · uploaded 23 Jul 2025Source
  • Form 5 (FY 2023-2024)Form 5 Fy 23-24.pdf · uploaded 23 Jul 2025Source
  • Form 1Form 1 Q3 20-21.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q3 20-21.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 Q3 Fy 20-21.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q3 20-21.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q4 20-21.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q4 20-21.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 Q4 Fy 20-21.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q4 20-21.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q1 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q1 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 FY 21-22 Q1.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q1 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q2 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q2 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 FY 21-22 Q2.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q2 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q3 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q3 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 3FY21-22 FORM-3 Q3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q3 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q4 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 3FY21-22 FORM-3 Q4.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q4 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q4 21-22.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q1 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q1 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 Q1 Fy 22-23.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q1 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q2 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q2 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 Q2 Fy 22-23.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q2 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q3 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q3 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 Q3 Fy 22-23.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q3 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q4 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q4 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 Q4 Fy 22-23.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q4 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q1 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q1 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 FY 23-24 Q 1.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q1 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q2 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q2 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 3FORM-3 FY23-24 Q2.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q2 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q3 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q3 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 FY 23-24 Q3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q3 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q4 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 2Form 2 Q4 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 3FORM-3 FY23-24 Q4.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q4 23-24.pdf · uploaded 25 Jul 2025Source
  • Form 1Form 1 Q2 24-25.pdf · uploaded 25 Jul 2025Source
  • Form 2engineer certificate.pdf · uploaded 25 Jul 2025Source
  • Form 3Form 3 Q2.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Q2 24-25.pdf · uploaded 25 Jul 2025Source
  • Form 2A (FY 2020-2021)2A 2021.pdf · uploaded 25 Jul 2025Source
  • Form 2A (FY 2021-2022)2A 2122 (2).pdf · uploaded 25 Jul 2025Source
  • Form 2A (FY 2022-2023)FY 22-23.pdf · uploaded 25 Jul 2025Source
  • Form 2A (FY 2023-2024)Form 2A April 2024 (2).pdf · uploaded 25 Jul 2025Source
  • Form 2A (FY 2024-2025)form 2A Fy 24-25.pdf · uploaded 25 Jul 2025Source
  • Form 5 (FY 2024-2025)Form - 5.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 1Form 1_Sep 25.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 2Form 2 Sep 25.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 3Form 3_Sep 25.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 1Form 1_Sep 25.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 2Engineer Certificate_Dec 25.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 3CA Certificate 25.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 1Architect Certificate Dec 25.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Engineer Certificate_Dec 25.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3CA Certificate 25.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Architect Certificate Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Engineer Certificate Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3CA Certificate 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Architect Certificate Dec 25.pdf · uploaded 5 Aug 2026Source
  • Withdrawal Update Form 2Engineer Certificate Dec 25.pdf · uploaded 5 Aug 2026Source
  • Withdrawal Update Form 3CA Certificate 25.pdf · uploaded 5 Aug 2026Source
  • Form 2A (FY 2025-2026)Form - 2A GM.pdf · uploaded 5 Aug 2026Source
  • Form 2A (FY 2026-2027)Form - 2A GM.pdf · uploaded 5 Aug 2026Source
  • Form 5 (FY 2025-2026)GM Form 5.pdf · uploaded 5 Aug 2026Source
  • Occupational CertificateGM BUILDCON A WING.pdf · uploaded 5 Aug 2026Source

Technical

  • DocumentLayout.pdf · uploaded 26 Nov 2020Source
  • DocumentLayout.pdf · uploaded 26 Nov 2020Source
  • Document1_Copy_of_Layout_Approval__in_case_of_layout_.pdf · uploaded 24 Feb 2023Source
  • Document1_Building_Plan_Approval___NA_Order_for_plotted_development.pdf · uploaded 24 Feb 2023Source
  • Document2,4,6,8 Floor Plan.pdf · uploaded 27 Jul 2023Source
  • DocumentClub House Plan.pdf · uploaded 27 Jul 2023Source
  • DocumentLayout plan.pdf · uploaded 21 Sep 2023Source
  • DocumentAPPROVED PLAN.pdf · uploaded 3 May 2024Source
  • DocumentPoint 7 Revised.pdf · uploaded 22 Jul 2025Source
  • DocumentLayout Approval Plan.pdf · uploaded 5 Feb 2026Source
  • DocumentBuilding Approval Plan 1.pdf · uploaded 5 Feb 2026Source
  • DocumentBuilding Approval Plan 2.pdf · uploaded 5 Feb 2026Source
  • DocumentBuilding Approval Plan 3.pdf · uploaded 5 Feb 2026Source
  • DocumentBuilding Approval Plan 4.pdf · uploaded 5 Feb 2026Source
  • DocumentBuilding Approval Plan 5.pdf · uploaded 5 Feb 2026Source
  • DocumentBuilding Approval Plan 6.pdf · uploaded 5 Feb 2026Source
  • DocumentBuilding Approval Plan 7.pdf · uploaded 5 Feb 2026Source
  • DocumentBuilding Approval Plan 8.pdf · uploaded 5 Feb 2026Source
  • DocumentBuilding Approval Plan 9.pdf · uploaded 5 Feb 2026Source

Technical (Architect)

  • DocumentArchitect Certificate q3.pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1 Q4 Fy 24-25.pdf · uploaded 19 May 2025Source
  • DocumentArchitect Certificate Dec 25.pdf · uploaded 5 Aug 2026Source

Technical (Engineer)

  • DocumentEngineer Certificate q3.pdf · uploaded 1 Feb 2025Source
  • DocumentForm 2 Q4 Fy 24-25.pdf · uploaded 19 May 2025Source
  • DocumentEngineer Certificate Dec 25.pdf · uploaded 24 Jun 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsGAT NO. 126 HISSA NO.2

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK79 units in all
Address
Gat No. 126 Hissa No.2, Malinagar, DehugaonPIN 412109
Village
Malinagar, Haveli taluka
Designated bank account
88
Developed in phases
No

Survey, CTS, gat or plot numbers

GAT NO. 126 HISSA NO.2

Boundaries

North
Sr No 126 P
South
Sr No 124
East
Sr No 65
West
15 M Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking79 units

65 of 79 units booked (82%), as the promoter reported to MahaRERA

1BHK · 47 units2BHK · 32 units
BuildingTypeCarpet areaUnitsBooked
A Building1BHK29.73 sq m · 320 sq ft33
A Building1BHK30 sq m · 323 sq ft44
A Building1BHK30.03 sq m · 323 sq ft44
A Building1BHK30.31 sq m · 326 sq ft43
A Building1BHK30.5 sq m · 328 sq ft43
A Building1BHK30.59 sq m · 329 sq ft44
A Building1BHK30.65 sq m · 330 sq ft41
A Building1BHK30.77 sq m · 331 sq ft44
Show all 21 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A Building1BHK30.86 sq m · 332 sq ft44
A Building1BHK30.92 sq m · 333 sq ft44
A Building1BHK30.95 sq m · 333 sq ft44
A Building1BHK31.22 sq m · 336 sq ft44
A Building2BHK38.86 sq m · 418 sq ft43
A Building2BHK39.08 sq m · 421 sq ft43
A Building2BHK39.13 sq m · 421 sq ft53
A Building2BHK39.36 sq m · 424 sq ft43
A Building2BHK40.66 sq m · 438 sq ft33
A Building2BHK40.89 sq m · 440 sq ft43
A Building2BHK40.92 sq m · 440 sq ft43
A Building2BHK41.16 sq m · 443 sq ft42
Arunya B Building Proposed1BHK1 sq m · 11 sq ft00

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectYogesh Wakchaure & Associates—
Chartered accountantNPSR and Associates CA Vivek Lahoti—
Chartered accountantParag Bhujbal—
EngineerYash Services—
Registered real estate agentJateen Vrajlal khakhar—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology