Mrudgandha
Completion was pushed back 1 year to Dec 2025, and that date has passed too; no MahaRERA orders on record.
Kothrud, Pune 411038 · Promoter: Pravin Keshav Badhekar
Completion was pushed back 1 year to Dec 2025, and that date has passed too
- This projectRegistered 29 Jun 2021, completion promised 31 Dec 2024, revised to 31 Dec 2025, and still not shown completed today.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100029764
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100029764 | 29 Jun 2021 | 31 Dec 2024 | 31 Dec 2025 | Pravin Keshav Badhekar | Project page |
Documents376
2 documents held by Deedo, 374 filings listed on MahaRERA's project page
Finance
- PAN CardPan card scan copy.pdf · uploaded 27 Feb 2021Source
Legal
- Legal Title reportMrudugandha Title Search Report.pdf · uploaded 25 Feb 2021Source
- Declaration Form BMrudugandha Affidavit.pdf · uploaded 22 Jun 2021Source
- Declaration Form BMrudugandha Form B.pdf · uploaded 22 Jun 2021Source
- Declaration Form BMrudugandha Form-B (3).pdf · uploaded 19 Nov 2024Source
- Other – LegalList of Complaints Mrudgandha.pdf · uploaded 27 Nov 2024Source
Show all 376 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportMrudugandha Title Search Report.pdf · uploaded 25 Feb 2021Source
- 1 Details of encumbrancesNo Encumbrances.pdf · uploaded 25 Feb 2021Source
- 1 Proforma of Allotment letterAllotment.pdf · uploaded 25 Feb 2021Source
- 1 PAN CardPan card scan copy.pdf · uploaded 27 Feb 2021Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 27 Feb 2021Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 27 Feb 2021Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 27 Feb 2021Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 27 Feb 2021Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 27 Feb 2021Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 27 Feb 2021Source
- 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 27 Feb 2021Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 27 Feb 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 27 Feb 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)c01.pdf · uploaded 7 Mar 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)c02.pdf · uploaded 7 Mar 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)c03.pdf · uploaded 7 Mar 2021Source
- 8 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 3 May 2021Source
- 9 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 3 May 2021Source
- 10 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 3 May 2021Source
- 11 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 3 May 2021Source
- 12 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 3 May 2021Source
- 13 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 3 May 2021Source
- 14 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 4 May 2021Source
- 15 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 4 May 2021Source
- 16 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 4 May 2021Source
- 17 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 4 May 2021Source
- 18 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 4 May 2021Source
- 19 Building Plan Approval / NA Order for plotted development19.pdf · uploaded 4 May 2021Source
- 20 Building Plan Approval / NA Order for plotted development20.pdf · uploaded 4 May 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)final Engineers certificate Mrudugandha soc.pdf · uploaded 9 Jun 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 CA_Certificate.pdf · uploaded 9 Jun 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentMrudugandha scrutiny letter.pdf · uploaded 14 Jun 2021Source
- 2 Proforma of Allotment letterMrudugandha Agreement to sell.pdf · uploaded 14 Jun 2021Source
- 1 Declaration about Commencement CertificateDeclaration about CC Mrudugandha.pdf · uploaded 21 Jun 2021Source
- 1 Declaration in FORM BMrudugandha Affidavit.pdf · uploaded 22 Jun 2021Source
- 2 Declaration in FORM BMrudugandha Form B.pdf · uploaded 22 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A MRUDUGANDHA.pdf · uploaded 26 Jan 2022Source
- 21 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 1_16.pdf · uploaded 2 Mar 2022Source
- 22 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 2_16.pdf · uploaded 2 Mar 2022Source
- 23 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 3_16.pdf · uploaded 2 Mar 2022Source
- 24 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 4_16.pdf · uploaded 2 Mar 2022Source
- 25 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 5_16.pdf · uploaded 2 Mar 2022Source
- 26 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 6_16.pdf · uploaded 2 Mar 2022Source
- 27 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 7_16.pdf · uploaded 2 Mar 2022Source
- 28 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 8_16.pdf · uploaded 2 Mar 2022Source
- 29 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 9_16.pdf · uploaded 2 Mar 2022Source
- 30 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 11_16.pdf · uploaded 2 Mar 2022Source
- 31 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 12_16.pdf · uploaded 2 Mar 2022Source
- 32 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 13_16.pdf · uploaded 2 Mar 2022Source
- 33 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 14_16.pdf · uploaded 2 Mar 2022Source
- 34 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 15_16.pdf · uploaded 2 Mar 2022Source
- 35 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 16_16.pdf · uploaded 2 Mar 2022Source
- 3 Commencement Certificates / NA Order for plotted developmentKrushankunj 22 2 22 CC 3686.pdf · uploaded 2 Mar 2022Source
- 36 Building Plan Approval / NA Order for plotted development1_16_compressed.pdf · uploaded 4 May 2022Source
- 37 Building Plan Approval / NA Order for plotted development2_16_compressed.pdf · uploaded 4 May 2022Source
- 38 Building Plan Approval / NA Order for plotted development3_16_compressed.pdf · uploaded 4 May 2022Source
- 39 Building Plan Approval / NA Order for plotted development4_16_compressed.pdf · uploaded 4 May 2022Source
- 40 Building Plan Approval / NA Order for plotted development5_16_compressed.pdf · uploaded 4 May 2022Source
- 41 Building Plan Approval / NA Order for plotted development6_16_compressed.pdf · uploaded 4 May 2022Source
- 42 Building Plan Approval / NA Order for plotted development7_16_compressed.pdf · uploaded 4 May 2022Source
- 43 Building Plan Approval / NA Order for plotted development8_16_compressed.pdf · uploaded 4 May 2022Source
- 44 Building Plan Approval / NA Order for plotted development9_16_compressed.pdf · uploaded 4 May 2022Source
- 45 Building Plan Approval / NA Order for plotted development10_16_compressed.pdf · uploaded 4 May 2022Source
- 46 Building Plan Approval / NA Order for plotted development11_16_compressed.pdf · uploaded 4 May 2022Source
- 47 Building Plan Approval / NA Order for plotted development12_16_compressed.pdf · uploaded 4 May 2022Source
- 48 Building Plan Approval / NA Order for plotted development13_16_compressed.pdf · uploaded 4 May 2022Source
- 49 Building Plan Approval / NA Order for plotted development14_16_compressed.pdf · uploaded 4 May 2022Source
- 50 Building Plan Approval / NA Order for plotted development15_16_compressed.pdf · uploaded 4 May 2022Source
- 51 Building Plan Approval / NA Order for plotted development16_16_compressed.pdf · uploaded 4 May 2022Source
- 4 Commencement Certificates / NA Order for plotted developmentCC 02 MAY 2022_compressed.pdf · uploaded 4 May 2022Source
- 1 CERSAI detailsCERSAI REPORT BADHEKAR DEVELOPERS.pdf · uploaded 4 May 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)MRUDUGANDHA ARCH CERTIFICATE 20-05-2022.pdf · uploaded 3 Jun 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Mrudugandha 20-21_compressed.pdf · uploaded 6 Jul 2022Source
- 1 Disclosure of sold/ booked inventoryMRUDUGANDHA DISCLOSURE.pdf · uploaded 7 Jul 2022Source
- 1 Proforma of Agreement for sale2 Proforma of Allotment letter (4).pdf · uploaded 2 Dec 2022Source
- 2 a Details of encumbrances concerned to FinanceNo Encumbrances of Legal MRUDGANDHA.pdf · uploaded 3 Dec 2022Source
- 3 a Details of encumbrances concerned to FinanceNo Encumbrances of Finance MRUDGANDHA.pdf · uploaded 3 Dec 2022Source
- 1 b Details of encumbrances concerned to LegalNo Encumbrances of Legal MRUDGANDHA.pdf · uploaded 3 Dec 2022Source
- 2 b Details of encumbrances concerned to LegalNo Encumbrances of Finance MRUDGANDHA.pdf · uploaded 3 Dec 2022Source
- 2 Declaration about Commencement CertificateDeclaration about CC Mrudugandha.pdf · uploaded 3 Dec 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance Certificate Form 2A MRUDUGANDHA - 21-22.pdf · uploaded 3 Dec 2022Source
- 2 Disclosure of sold/ booked inventorySOLD-UNSOLD INVENTORIES MRUDGANDHA.pdf · uploaded 3 Dec 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Account Details MRUDUGANDHA.pdf · uploaded 3 Dec 2022Source
- 1 Deviation Report with respect to Allotment letterR1 Deviation Report wrt Allotment letter MRUDGANDHA.pdf · uploaded 3 Dec 2022Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report wrt model copy of Agreement MRUDGANDHA.pdf · uploaded 3 Dec 2022Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure in REO-BD.pdf · uploaded 8 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 MRUDGANDHA 21-22.pdf · uploaded 16 Feb 2023Source
- 52 Building Plan Approval / NA Order for plotted development1-17_compressed.pdf · uploaded 2 Jul 2023Source
- 53 Building Plan Approval / NA Order for plotted development2-17_compressed.pdf · uploaded 2 Jul 2023Source
- 54 Building Plan Approval / NA Order for plotted development3-17_compressed.pdf · uploaded 2 Jul 2023Source
- 55 Building Plan Approval / NA Order for plotted development4-17_compressed.pdf · uploaded 2 Jul 2023Source
- 56 Building Plan Approval / NA Order for plotted development5-17_compressed.pdf · uploaded 2 Jul 2023Source
- 57 Building Plan Approval / NA Order for plotted development6-17_compressed.pdf · uploaded 2 Jul 2023Source
- 58 Building Plan Approval / NA Order for plotted development7-17_compressed.pdf · uploaded 2 Jul 2023Source
- 59 Building Plan Approval / NA Order for plotted development8-17_compressed.pdf · uploaded 2 Jul 2023Source
- 60 Building Plan Approval / NA Order for plotted development9-17_compressed.pdf · uploaded 2 Jul 2023Source
- 61 Building Plan Approval / NA Order for plotted development10-17_compressed.pdf · uploaded 2 Jul 2023Source
- 62 Building Plan Approval / NA Order for plotted development11-17_compressed.pdf · uploaded 2 Jul 2023Source
- 63 Building Plan Approval / NA Order for plotted development12-17_compressed.pdf · uploaded 2 Jul 2023Source
- 64 Building Plan Approval / NA Order for plotted development13-17_compressed.pdf · uploaded 2 Jul 2023Source
- 65 Building Plan Approval / NA Order for plotted development14-17_compressed.pdf · uploaded 2 Jul 2023Source
- 66 Building Plan Approval / NA Order for plotted development15-17_compressed.pdf · uploaded 2 Jul 2023Source
- 67 Building Plan Approval / NA Order for plotted development16-17_compressed.pdf · uploaded 2 Jul 2023Source
- 68 Building Plan Approval / NA Order for plotted development17-17_compressed.pdf · uploaded 2 Jul 2023Source
- 5 Commencement Certificates / NA Order for plotted developmentCC KRISHNAKUNJ 6th Sanction 21_06_23.pdf · uploaded 2 Jul 2023Source
- 3 Disclosure of sold/ booked inventoryDisclosure of sold Mrudugandha site.pdf · uploaded 27 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)MRUDAGANDHA.pdf · uploaded 16 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Mrudgandha site Form 2A QAC.pdf · uploaded 6 Nov 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate MRUDGANDHA 18 Dec 23.pdf · uploaded 27 Dec 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-BP.pdf · uploaded 17 Jan 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-BPP.pdf · uploaded 17 Jan 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-ES.pdf · uploaded 17 Jan 2024Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-PPI.pdf · uploaded 17 Jan 2024Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-SP.pdf · uploaded 17 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryMrudgandha Disclosure of sold-booked inventory.pdf · uploaded 5 Feb 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of sold-booked inventory Mrudgandha.pdf · uploaded 13 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Mrudugandha RERA Form V FY 22-23.pdf · uploaded 2 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)MRUDAGANDHA LETTER.pdf · uploaded 21 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mrudgandha.pdf · uploaded 30 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure of inventory Mrudugandha site.pdf · uploaded 5 Aug 2024Source
- 4 Disclosure of sold/ booked inventoryDisclosure of sold Mrudugandha.pdf · uploaded 18 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mrudugandha.pdf · uploaded 17 Nov 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mrudugandha (1).pdf · uploaded 18 Nov 2024Source
- 1 Declaration in FORM BMrudugandha Form-B (3).pdf · uploaded 19 Nov 2024Source
- 1 Other – LegalList of Complaints Mrudgandha.pdf · uploaded 27 Nov 2024Source
- 1 Other – TechnicalReasons for Delay Mrudgandha.pdf · uploaded 27 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate Mrudugandha site -Mar-24_compressed.pdf · uploaded 12 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mrudugandha RERA Form 3 CA Certificate up to Sep-24 scan.pdf · uploaded 12 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Mrudgandha Sep-24.pdf · uploaded 12 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Mrudgandha Mar 24.pdf · uploaded 12 Dec 2024Source
- 1 CERSAI detailsNo CERSAI Mrudgandha 121224.pdf · uploaded 12 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-QAC Engineer Certificate Mrudgandha 23-24.pdf · uploaded 12 Dec 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mrudugandha Architect certificate Sept-24.pdf · uploaded 13 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Mrudugandha FY 23-24 RERA 5 Scan.pdf · uploaded 18 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate Mrudugandha dec-24.pdf · uploaded 17 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate Mrudugandha dec-24.pdf · uploaded 28 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold Mrudugandha Dec-24.pdf · uploaded 28 Jan 2025Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold Mrudgandha Dec-24.pdf · uploaded 28 Jan 2025Source
- 3 Disclosure of sold/ booked inventoryDisclosure of booked inventory Mrudugandha Dec-24.pdf · uploaded 25 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Mrudgandha Dec 24.pdf · uploaded 4 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mrudugandha RERA Form 3 CA Certificate up to Dec-24 scan.pdf · uploaded 6 Mar 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mrudugandha RERA Form 3 CA Certificate up to Dec-24 scan Revised.pdf · uploaded 6 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer certificate Mrudgandha Dec 24.pdf · uploaded 6 Mar 2025Source
- Form 1Architect’s Certificate - Mrudgandha Sep 2024.pdf · uploaded 5 Aug 2025Source
- Form 1Architect’s Certificate - Mrudgandha Dec 2024.pdf · uploaded 5 Aug 2025Source
- Form 2Engineer’s Certificate - Mrudgandha Sep 24.pdf · uploaded 5 Aug 2025Source
- Form 2Engineer’s Certificate - Mrudgandha Dec 24.pdf · uploaded 5 Aug 2025Source
- Form 3CA Certificate - Mrudgandha Sep 2024.pdf · uploaded 5 Aug 2025Source
- Form 3CA Certificate - Mrudgandha Dec 2024.pdf · uploaded 5 Aug 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Sep 24.pdf · uploaded 5 Aug 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 24.pdf · uploaded 5 Aug 2025Source
- Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 27 Nov 2025Source
- Form 1Architect’s Certificate - Mrudgandha Jun 2024.pdf · uploaded 27 Nov 2025Source
- Form 1Architect’s Certificate - Mrudgandha Mar 2024.pdf · uploaded 27 Nov 2025Source
- Form 1Architect’s Certificate - Mrudgandha Dec 23.pdf · uploaded 27 Nov 2025Source
- Form 1Architect’s Certificate - Mrudgandha Sep 23.pdf · uploaded 27 Nov 2025Source
- Form 1Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Form 1Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Form 1Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Form 1Disclosure of sold_ booked inventory Jun 22.pdf · uploaded 27 Nov 2025Source
- Form 1Disclosure of sold_ booked inventory Jun 22.pdf · uploaded 27 Nov 2025Source
- Form 1Engineer’s Certificate - Mrudgandha May 21.pdf · uploaded 27 Nov 2025Source
- Form 1Engineer’s Certificate - Mrudgandha May 21.pdf · uploaded 27 Nov 2025Source
- Form 1Engineer’s Certificate - Mrudgandha May 21.pdf · uploaded 27 Nov 2025Source
- Form 1Engineer’s Certificate - Mrudgandha May 21.pdf · uploaded 27 Nov 2025Source
- Form 2Architect Certificate Mrudgandha Mar 25.pdf · uploaded 27 Nov 2025Source
- Form 2Architect’s Certificate - Mrudgandha Jun 2024.pdf · uploaded 27 Nov 2025Source
- Form 2Engineer’s Certificate - Mrudgandha Mar 24.pdf · uploaded 27 Nov 2025Source
- Form 2Architect’s Certificate - Mrudgandha Dec 23.pdf · uploaded 27 Nov 2025Source
- Form 2Architect’s Certificate - Mrudgandha Sep 23.pdf · uploaded 27 Nov 2025Source
- Form 2Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Form 2Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Form 2Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Form 2Disclosure of sold_ booked inventory Jun 22.pdf · uploaded 27 Nov 2025Source
- Form 2Disclosure of sold_ booked inventory Jun 22.pdf · uploaded 27 Nov 2025Source
- Form 2Engineer’s Certificate - Mrudgandha May 21.pdf · uploaded 27 Nov 2025Source
- Form 2Engineer’s Certificate - Mrudgandha May 21.pdf · uploaded 27 Nov 2025Source
- Form 2Engineer’s Certificate - Mrudgandha May 21.pdf · uploaded 27 Nov 2025Source
- Form 2Engineer’s Certificate - Mrudgandha May 21.pdf · uploaded 27 Nov 2025Source
- Form 3Architect Certificate Mrudgandha Mar 25.pdf · uploaded 27 Nov 2025Source
- Form 3Architect’s Certificate - Mrudgandha Jun 2024.pdf · uploaded 27 Nov 2025Source
- Form 3CA Certificate - Mrudgandha Mar 2024.pdf · uploaded 27 Nov 2025Source
- Form 3Architect’s Certificate - Mrudgandha Dec 23.pdf · uploaded 27 Nov 2025Source
- Form 3Architect’s Certificate - Mrudgandha Sep 23.pdf · uploaded 27 Nov 2025Source
- Form 3Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Form 3Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Form 3Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Form 3Disclosure of sold_ booked inventory Jun 22.pdf · uploaded 27 Nov 2025Source
- Form 3Disclosure of sold_ booked inventory Jun 22.pdf · uploaded 27 Nov 2025Source
- Form 3CA Certificate - Mrudgandha May 2021.pdf · uploaded 27 Nov 2025Source
- Form 3CA Certificate - Mrudgandha May 2021.pdf · uploaded 27 Nov 2025Source
- Form 3CA Certificate - Mrudgandha May 2021.pdf · uploaded 27 Nov 2025Source
- Form 3CA Certificate - Mrudgandha May 2021.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryArchitect Certificate Mrudgandha Mar 25.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Jun 24.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryArchitect’s Certificate - Mrudgandha Mar 2024.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 23.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Sep 23.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 22.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Jun 22.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Jun 22.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryCA Certificate - Mrudgandha May 2021.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryCA Certificate - Mrudgandha May 2021.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryCA Certificate - Mrudgandha May 2021.pdf · uploaded 27 Nov 2025Source
- Disclosure of Sold and Booked InventoryCA Certificate - Mrudgandha May 2021.pdf · uploaded 27 Nov 2025Source
- Form 2A (FY 2021-2022)1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf · uploaded 22 Jan 2026Source
- Form 2A (FY 2022-2023)1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf · uploaded 23 Jan 2026Source
- Form 2A (FY 2023-2024)1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf · uploaded 23 Jan 2026Source
- Form 2A (FY 2024-2025)Mrudgandha 2A - 24-25.pdf · uploaded 24 Jan 2026Source
- Form 2A (FY 2025-2026)Mrudgandha 2A -25-26.pdf · uploaded 24 Jan 2026Source
- Form 5 (FY 2024-2025)Mrudugandha FY 24-25 RERA 5 Scan.pdf · uploaded 26 Mar 2026Source
- Form 5 (FY 2021-2022)1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf · uploaded 27 Mar 2026Source
- Form 5 (FY 2022-2023)1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf · uploaded 27 Mar 2026Source
- Form 5 (FY 2023-2024)1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf · uploaded 27 Mar 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mrudgandha Mar 25.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 2Engineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 3Mrudugandha Form 3 CA Certificate up to Mar-25_compressed.pdf · uploaded 25 Jul 2026Source
- Occupational CertificateFull Completion Krishnakunja Project.pdf · uploaded 25 Jul 2026Source
Technical
- DocumentLayout.pdf · uploaded 27 Feb 2021Source
- Document1.pdf · uploaded 27 Feb 2021Source
- Document2.pdf · uploaded 27 Feb 2021Source
- Document3.pdf · uploaded 27 Feb 2021Source
- Document4.pdf · uploaded 27 Feb 2021Source
- Document5.pdf · uploaded 27 Feb 2021Source
- Document6.pdf · uploaded 27 Feb 2021Source
- Document7.pdf · uploaded 27 Feb 2021Source
- Document8.pdf · uploaded 3 May 2021Source
- Document9.pdf · uploaded 3 May 2021Source
- Document10.pdf · uploaded 3 May 2021Source
- Document11.pdf · uploaded 3 May 2021Source
- Document12.pdf · uploaded 3 May 2021Source
- Document13.pdf · uploaded 3 May 2021Source
- Document14.pdf · uploaded 4 May 2021Source
- Document15.pdf · uploaded 4 May 2021Source
- Document16.pdf · uploaded 4 May 2021Source
- Document17.pdf · uploaded 4 May 2021Source
- Document18.pdf · uploaded 4 May 2021Source
- Document19.pdf · uploaded 4 May 2021Source
- Document20.pdf · uploaded 4 May 2021Source
- Documentkrushnakunj 22 2 22 1_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 2_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 3_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 4_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 5_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 6_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 7_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 8_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 9_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 11_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 12_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 13_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 14_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 15_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 16_16.pdf · uploaded 2 Mar 2022Source
- Document1_16_compressed.pdf · uploaded 4 May 2022Source
- Document2_16_compressed.pdf · uploaded 4 May 2022Source
- Document3_16_compressed.pdf · uploaded 4 May 2022Source
- Document4_16_compressed.pdf · uploaded 4 May 2022Source
- Document5_16_compressed.pdf · uploaded 4 May 2022Source
- Document6_16_compressed.pdf · uploaded 4 May 2022Source
- Document7_16_compressed.pdf · uploaded 4 May 2022Source
- Document8_16_compressed.pdf · uploaded 4 May 2022Source
- Document9_16_compressed.pdf · uploaded 4 May 2022Source
- Document10_16_compressed.pdf · uploaded 4 May 2022Source
- Document11_16_compressed.pdf · uploaded 4 May 2022Source
- Document12_16_compressed.pdf · uploaded 4 May 2022Source
- Document13_16_compressed.pdf · uploaded 4 May 2022Source
- Document14_16_compressed.pdf · uploaded 4 May 2022Source
- Document15_16_compressed.pdf · uploaded 4 May 2022Source
- Document16_16_compressed.pdf · uploaded 4 May 2022Source
- Document1-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document2-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document3-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document4-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document5-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document6-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document7-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document8-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document9-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document10-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document11-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document12-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document13-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document14-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document15-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document16-17_compressed.pdf · uploaded 2 Jul 2023Source
- Document17-17_compressed.pdf · uploaded 2 Jul 2023Source
- Other – TechnicalReasons for Delay Mrudgandha.pdf · uploaded 27 Nov 2024Source
- Document1.pdf · uploaded 26 Nov 2025Source
- Document2.pdf · uploaded 26 Nov 2025Source
- Document3.pdf · uploaded 26 Nov 2025Source
- Document4.pdf · uploaded 26 Nov 2025Source
- Document5.pdf · uploaded 26 Nov 2025Source
- Document6.pdf · uploaded 26 Nov 2025Source
- Document7.pdf · uploaded 26 Nov 2025Source
- Document8.pdf · uploaded 26 Nov 2025Source
- Document9.pdf · uploaded 26 Nov 2025Source
- Document10.pdf · uploaded 26 Nov 2025Source
- Document11.pdf · uploaded 26 Nov 2025Source
- Document12.pdf · uploaded 26 Nov 2025Source
- Document13.pdf · uploaded 26 Nov 2025Source
- Document14.pdf · uploaded 26 Nov 2025Source
- Document15.pdf · uploaded 26 Nov 2025Source
- Document16.pdf · uploaded 26 Nov 2025Source
- Document17.pdf · uploaded 26 Nov 2025Source
Technical (Architect)
- DocumentMrudugandha.pdf · uploaded 17 Nov 2024Source
- DocumentMrudugandha (1).pdf · uploaded 18 Nov 2024Source
- DocumentMrudugandha Architect certificate Sept-24.pdf · uploaded 13 Dec 2024Source
- DocumentArchitect certificate Mrudugandha dec-24.pdf · uploaded 17 Jan 2025Source
- DocumentArchitect certificate Mrudugandha dec-24.pdf · uploaded 28 Jan 2025Source
- DocumentArchitect Certificate Mrudgandha Mar 25.pdf · uploaded 25 Jul 2026Source
Technical (Engineer)
- DocumentForm 2 Engineer Certificate Mrudgandha Mar 24.pdf · uploaded 12 Dec 2024Source
- DocumentForm 2 Engineer Certificate Mrudgandha Sep-24.pdf · uploaded 12 Dec 2024Source
- DocumentForm 2 Engineer certificate Mrudgandha Dec 24.pdf · uploaded 6 Mar 2025Source
- DocumentEngineers certificate Form 2 Mrudugandha Mar 25.pdf · uploaded 25 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals21
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —44 units in all
- Address
- 21, Paud road, Rambaug colonyPIN 411038
- Village
- Kothrud, Haveli taluka
- Location
- 18.51067, 73.81156
- Designated bank account
- 82
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- plot no 20
- South
- Plot no 20
- East
- Road
- West
- part plot no 21
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking44 units
44 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 44 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Paras Netragaonkar | — |
| Chartered accountant | D.b.gandhi & Associates | — |
| Chartered accountant | Dinesh Balkrishna Gandhi | — |
| Chartered accountant | Shrikant Mantri | — |
| Engineer | Dipali Amit Kulkarni | — |
| Engineer | G A Bhilare | — |
Source: MahaRERA project page. Contact details are not shown.