Completion was pushed back 6 years and 1 month, to Dec 2029; 1 listing or order with MahaRERA on record; 0% of its units are booked.

Karla, Pune 410405 · by Kishankumar Jugalkishor Kedia

DeliveryExtended 6 yrs 1 moPromised Nov 2023 · now due Dec 2029Regulatory1 listing or orderLatest: Regulatory order, 2024Sales0% booked0 of 1 unit · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 6 years and 1 month, to Dec 2029

  • This projectRegistered 9 Aug 2017, completion promised 28 Nov 2023, revised to 31 Dec 2029.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

115 buildings

Open a building to see every flat, floor by floor.

Show all 115 buildingsShow fewer buildings

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory record1

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Regulatory order2 Jul 2024Matched by RERA number

    Regulatory order: PROJECT NAME:CRYSTAL SPRING (Regulatory Case No. 252 OF 2024) dated 02 July 2024.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100004437
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000044379 Aug 201728 Nov 202331 Dec 2029Kishankumar Jugalkishor KediaProject page
Documents214

2 documents held by Deedo, 212 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN Cardpan card Kishan Kedia.pdf · uploaded 27 Jul 2017Source
  • PAN CardGCL - pan Card.pdf · uploaded 29 Jul 2017Source

Legal

  • Legal Title reportTitle Cerificate 292.pdf · uploaded 27 Jul 2017Source
  • Legal Title reportTitle Certificate-302.pdf · uploaded 27 Jul 2017Source
  • Declaration Form BAffidavit cum Declaration- Crystal Spring.pdf · uploaded 27 Jul 2017Source
  • Declaration Form BForm B.pdf · uploaded 5 Mar 2024Source
Show all 214 documentsShow fewer documents

Migrated

  • 1 PAN Cardpan card Kishan Kedia.pdf · uploaded 27 Jul 2017Source
  • 1 Copy of the legal title reportTitle Cerificate 292.pdf · uploaded 27 Jul 2017Source
  • 2 Copy of the legal title reportTitle Certificate-302.pdf · uploaded 27 Jul 2017Source
  • 1 Details of encumbrancesCrystal Spring- Encumbrance Letter.pdf · uploaded 27 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Crystal Spring- 302- Approved Plan.pdf · uploaded 27 Jul 2017Source
  • 2 Copy of Layout Approval (in case of layout)Crystal Spring 292 Approve Plan.pdf · uploaded 27 Jul 2017Source
  • 1 Building Plan Approval (IOD)1-2921.pdf · uploaded 27 Jul 2017Source
  • 2 Building Plan Approval (IOD)2,3,4,5-292.pdf · uploaded 27 Jul 2017Source
  • 3 Building Plan Approval (IOD)6-292.pdf · uploaded 27 Jul 2017Source
  • 4 Building Plan Approval (IOD)7-292.pdf · uploaded 27 Jul 2017Source
  • 5 Building Plan Approval (IOD)8-292.pdf · uploaded 27 Jul 2017Source
  • 6 Building Plan Approval (IOD)9-292.pdf · uploaded 27 Jul 2017Source
  • 7 Building Plan Approval (IOD)10-292.pdf · uploaded 27 Jul 2017Source
  • 8 Building Plan Approval (IOD)11-292.pdf · uploaded 27 Jul 2017Source
  • 9 Building Plan Approval (IOD)A,B,C -302.pdf · uploaded 27 Jul 2017Source
  • 1 Declaration in FORM BAffidavit cum Declaration- Crystal Spring.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate- Crystal Spring.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Crystal Spring.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of CA (Form 3)ca certificate.pdf · uploaded 27 Jul 2017Source
  • 2 PAN CardGCL - pan Card.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterAgreement for sale Crystal Spring new.pdf · uploaded 29 Jul 2017Source
  • 2 Proforma of Allotment lettergarnet - crystal spring allotment.pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of CA (Form 3)Crystal Spring - March 18 Form 3.pdf · uploaded 2 Jan 2019Source
  • 1 Certificates of CA (Form 5)Garnet_MahaRera_Form-5_Crystal_Spring_18.pdf · uploaded 8 May 2019Source
  • 3 Certificates of CA (Form 3)Crystal spring CA certificate.pdf · uploaded 14 Jan 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 2019.pdf · uploaded 14 Feb 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentNA order-302.pdf · uploaded 24 Feb 2020Source
  • 2 Commencement Certificates / NA Order for plotted developmentNA order 292.pdf · uploaded 24 Feb 2020Source
  • 4 Certificates of CA (Form 3)Ca certificate crystal spring 2020 Low DPI.pdf · uploaded 16 Jun 2021Source
  • 2 Certificates of CA (Form 5)Garnet_MahaRera_Form-5_Crystal_Spring_20_Revised.pdf · uploaded 16 Jun 2021Source
  • 5 Certificates of CA (Form 3)CRYSTAL SPRING FORM 3 21 lOW DPI.pdf · uploaded 1 Dec 2021Source
  • 3 Certificates of CA (Form 5)Crystal Spring From 5 2021.pdf · uploaded 1 Dec 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Garnet_MahaRera_Form-5_Crystal_Spring_22.pdf · uploaded 6 Feb 2023Source
  • 6 Certificates of CA (Form 3)Garnet Construction Ltd form 3 Ca crystal Spring March 22.pdf · uploaded 14 Feb 2023Source
  • 1 Proforma of Agreement for saleAgreement for sale Crystal Spring new.pdf · uploaded 24 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Garnet_MahaRera_Form-5_Crystal_Spring_20_Revised.pdf · uploaded 25 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Crystal Spring From 5 2021.pdf · uploaded 25 Mar 2023Source
  • 2 Declaration in FORM BForm B.pdf · uploaded 5 Mar 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate 04 03 2024-1.pdf · uploaded 5 Mar 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate 04 03 2024-2.pdf · uploaded 5 Mar 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate 04 03 2024-3.pdf · uploaded 5 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 19-20.pdf · uploaded 19 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 20-21.pdf · uploaded 19 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 21-22.pdf · uploaded 19 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 22-23.pdf · uploaded 19 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)crystal spring form 5 22-23.pdf · uploaded 19 May 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)June'17_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mar'18_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mar'19_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mar'20_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mar'21_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mar'22_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mar'23_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)June'23_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sept'23_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Dec'23_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mar'24_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • 7 Certificates of CA (Form 3)1 Certificates of CA (Form 3) (1)_2017.pdf · uploaded 6 Jun 2024Source
  • 8 Certificates of CA (Form 3)2 Certificates of CA (Form 3) (1)_2018.pdf · uploaded 6 Jun 2024Source
  • 9 Certificates of CA (Form 3)3 Certificates of CA (Form 3) (1)_2019.pdf · uploaded 6 Jun 2024Source
  • 10 Certificates of CA (Form 3)4 Certificates of CA (Form 3) (1)_2020.pdf · uploaded 6 Jun 2024Source
  • 11 Certificates of CA (Form 3)5 Certificates of CA (Form 3) (1)_2021.pdf · uploaded 6 Jun 2024Source
  • 12 Certificates of CA (Form 3)Signed KK_Crystal Spring_Form 3 Mar'22.pdf · uploaded 6 Jun 2024Source
  • 13 Certificates of CA (Form 3)Signed KK_Crystal Spring_Form 3 Mar'23.pdf · uploaded 6 Jun 2024Source
  • 14 Certificates of CA (Form 3)Signed KK_Crystal Spring_Form 3 Jun'23.pdf · uploaded 6 Jun 2024Source
  • 15 Certificates of CA (Form 3)Signed KK_Crystal Spring_Form 3 Sept'23.pdf · uploaded 6 Jun 2024Source
  • 16 Certificates of CA (Form 3)Signed KK_Crystal Spring_Form 3 Dec'23.pdf · uploaded 6 Jun 2024Source
  • 17 Certificates of CA (Form 3)Signed KK_Crystal Spring_Form 3 Mar'24.pdf · uploaded 6 Jun 2024Source
  • 4 Certificates of CA (Form 5)Garnet_MahaRera_Form-5_Crystal_Spring_18.pdf · uploaded 6 Jun 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Garnet_MahaRera_Form-5_Crystal_Spring_19.pdf · uploaded 6 Jun 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Garnet_MahaRera_Form-5_Crystal_Spring_20.pdf · uploaded 6 Jun 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Garnet_MahaRera_Form-5_Crystal_Spring_21.pdf · uploaded 6 Jun 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Garnet_MahaRera_Form-5_Crystal_Spring_22.pdf · uploaded 6 Jun 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Garnet_MahaRera_Form-5_Crystal_Spring_23.pdf · uploaded 6 Jun 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate 31 March 2024.pdf · uploaded 7 Jun 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate 7 june 2024.pdf · uploaded 7 Jun 2024Source
  • 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 10 Jun 2024Source
  • 1 Certificates of CA (Form 3)Form 3 June 24 CS signed.pdf · uploaded 15 Apr 2025Source
  • 2 Certificates of CA (Form 3)Form 3 Sept 24 CS signed.pdf · uploaded 15 Apr 2025Source
  • 3 Certificates of CA (Form 3)Form 3 Dec 24 CS signed.pdf · uploaded 15 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Crystal Spring 23-24.pdf · uploaded 15 Apr 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 June 24 CS signed.pdf · uploaded 18 Apr 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sept 24 CS signed.pdf · uploaded 18 Apr 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec 24 CS signed.pdf · uploaded 18 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Crystal Spring 23-24.pdf · uploaded 18 Apr 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 June 2024_11zon.pdf · uploaded 23 Apr 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 September 2024_11zon.pdf · uploaded 23 Apr 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 December 2024_11zon.pdf · uploaded 23 Apr 2025Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 31 03 2025 Compress.pdf · uploaded 24 Apr 2025Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 September 2021_11zon.pdf · uploaded 2 May 2025Source
  • 30 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 31 03 2025 Compress.pdf · uploaded 2 May 2025Source
  • 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 December 2024_11zon.pdf · uploaded 2 May 2025Source
  • 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 September 2024_11zon.pdf · uploaded 2 May 2025Source
  • 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 June 2024_11zon.pdf · uploaded 2 May 2025Source
  • 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 March 2024.pdf · uploaded 2 May 2025Source
  • 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 December 2023_11zon.pdf · uploaded 2 May 2025Source
  • 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 September 2023_11zon.pdf · uploaded 2 May 2025Source
  • 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 June 2023_11zon.pdf · uploaded 2 May 2025Source
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 March 2023_11zon.pdf · uploaded 2 May 2025Source
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 December 2022_11zon.pdf · uploaded 2 May 2025Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 September 2022_11zon.pdf · uploaded 2 May 2025Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 June 2022_11zon.pdf · uploaded 2 May 2025Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 March 2022_11zon.pdf · uploaded 2 May 2025Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 December 2021_11zon.pdf · uploaded 2 May 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 December 2017_11zon.pdf · uploaded 2 May 2025Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 June 2021_11zon.pdf · uploaded 2 May 2025Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 March 2021_11zon.pdf · uploaded 2 May 2025Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 December 2020_11zon.pdf · uploaded 2 May 2025Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 September 2020_11zon.pdf · uploaded 2 May 2025Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 June 2020_11zon.pdf · uploaded 2 May 2025Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 March 2020_11zon.pdf · uploaded 2 May 2025Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 December 2019_11zon.pdf · uploaded 2 May 2025Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 September 2019_11zon.pdf · uploaded 2 May 2025Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 June 2019_11zon.pdf · uploaded 2 May 2025Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 March 2019_11zon.pdf · uploaded 2 May 2025Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 December 2018_11zon.pdf · uploaded 2 May 2025Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 September 2018_11zon.pdf · uploaded 2 May 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 June 2018_11zon.pdf · uploaded 2 May 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 March 2018_11zon.pdf · uploaded 2 May 2025Source
  • 1 Certificates of CA (Form 3)Form 3 Mar 25 CA signed.pdf · uploaded 13 May 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Mar 25 CE signed.pdf · uploaded 13 May 2025Source
  • 1 Disclosure of sold/ booked inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 13 May 2025Source
  • Form 1FORM 1 31 03 2025 Compress.pdf · uploaded 20 Jun 2025Source
  • Form 2Form 2 Mar 25 CE signed.pdf · uploaded 20 Jun 2025Source
  • Form 3Form 3 Mar 25 CA signed.pdf · uploaded 20 Jun 2025Source
  • Disclosure of Sold and Booked Inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 20 Jun 2025Source
  • Form 1withdrawl Application form 1 CS.pdf · uploaded 8 Oct 2025Source
  • Form 2Form 2 CS June 25.pdf · uploaded 8 Oct 2025Source
  • Form 3Form 3 CS June 25.pdf · uploaded 8 Oct 2025Source
  • Disclosure of Sold and Booked Inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 8 Oct 2025Source
  • Form 1FORM 1 CS Q 2.pdf · uploaded 1 Dec 2025Source
  • Form 2Form 2 Sept 2025 CS.pdf · uploaded 1 Dec 2025Source
  • Form 3Form 3 Sept 2025 CS.pdf · uploaded 1 Dec 2025Source
  • Disclosure of Sold and Booked Inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 1 Dec 2025Source
  • Form 1Form 1 Q3 CS.pdf · uploaded 20 Feb 2026Source
  • Form 2Form 2 Q3 Crystal Spring signed.pdf · uploaded 20 Feb 2026Source
  • Form 3Form 3 Q3 Crystal Spring signed.pdf · uploaded 20 Feb 2026Source
  • Disclosure of Sold and Booked Inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 20 Feb 2026Source
  • Form 1FORM 1.pdf · uploaded 8 Jun 2026Source
  • Form 2Signed Form 2.pdf · uploaded 8 Jun 2026Source
  • Form 3signed form 3.pdf · uploaded 8 Jun 2026Source
  • Disclosure of Sold and Booked Inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 8 Jun 2026Source
  • Form 1Withdrawal Application Form1.pdf · uploaded 1 Aug 2026Source
  • Form 2Form 2 June 26.pdf · uploaded 1 Aug 2026Source
  • Form 3Form 3 June 26.pdf · uploaded 1 Aug 2026Source
  • Disclosure of Sold and Booked Inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 1 Aug 2026Source
  • Form 5 (FY 2017-2018)Garnet_MahaRera_Form-5_Crystal_Spring_18.pdf · uploaded 10 Aug 2026Source
  • Form 5 (FY 2018-2019)Form 5 2019.pdf · uploaded 10 Aug 2026Source
  • Form 5 (FY 2019-2020)Garnet_MahaRera_Form-5_Crystal_Spring_20_Revised.pdf · uploaded 10 Aug 2026Source
  • Form 5 (FY 2020-2021)Crystal Spring From 5 2021.pdf · uploaded 10 Aug 2026Source
  • Form 5 (FY 2021-2022)Garnet_MahaRera_Form-5_Crystal_Spring_22.pdf · uploaded 10 Aug 2026Source
  • Form 5 (FY 2022-2023)1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf · uploaded 10 Aug 2026Source
  • Form 5 (FY 2023-2024)Form 5 Crystal Spring march 24.pdf · uploaded 10 Aug 2026Source
  • Form 5 (FY 2024-2025)CS form 5 24-25.pdf · uploaded 10 Aug 2026Source
  • Form 5 (FY 2025-2026)CS form 5 25-26.pdf · uploaded 10 Aug 2026Source

Technical

  • DocumentCrystal Spring 292 Approve Plan.pdf · uploaded 27 Jul 2017Source
  • DocumentCrystal Spring- 302- Approved Plan.pdf · uploaded 27 Jul 2017Source
  • Document11-292.pdf · uploaded 27 Jul 2017Source
  • DocumentA,B,C -302.pdf · uploaded 27 Jul 2017Source
  • Document9-292.pdf · uploaded 27 Jul 2017Source
  • Document10-292.pdf · uploaded 27 Jul 2017Source
  • Document8-292.pdf · uploaded 27 Jul 2017Source
  • Document2,3,4,5-292.pdf · uploaded 27 Jul 2017Source
  • Document6-292.pdf · uploaded 27 Jul 2017Source
  • Document7-292.pdf · uploaded 27 Jul 2017Source
  • Document1-2921.pdf · uploaded 27 Jul 2017Source

Technical (Architect)

  • DocumentArchitect certificate 7 june 2024.pdf · uploaded 7 Jun 2024Source
  • DocumentFORM 1 June 2024_11zon.pdf · uploaded 23 Apr 2025Source
  • DocumentFORM 1 September 2024_11zon.pdf · uploaded 23 Apr 2025Source
  • DocumentFORM 1 December 2024_11zon.pdf · uploaded 23 Apr 2025Source
  • DocumentFORM 1 31 03 2025 Compress.pdf · uploaded 24 Apr 2025Source
  • DocumentFORM 1 December 2017_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 March 2018_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 June 2018_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 September 2018_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 December 2018_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 March 2019_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 June 2019_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 September 2019_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 December 2019_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 March 2020_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 June 2020_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 September 2020_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 December 2020_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 March 2021_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 June 2021_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 September 2021_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 December 2021_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 March 2022_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 June 2022_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 September 2022_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 December 2022_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 March 2023_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 June 2023_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 September 2023_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 December 2023_11zon.pdf · uploaded 2 May 2025Source
  • DocumentForm 1 March 2024.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 June 2024_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 September 2024_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 December 2024_11zon.pdf · uploaded 2 May 2025Source
  • DocumentFORM 1 31 03 2025 Compress.pdf · uploaded 2 May 2025Source

Technical (Engineer)

  • DocumentMar'24_Form 2_Engineer's Certificate Crystal Spring.pdf · uploaded 6 Jun 2024Source
  • DocumentForm 2 June 24 CS signed.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 2 Sept 24 CS signed.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 2 Dec 24 CS signed.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 2 Mar 25 CE signed.pdf · uploaded 13 May 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel GUT NO 292, GUT NO 302

As registered with MahaRERA and published on its project page

Project type
Mixed
Status on MahaRERA
Certificate Signed
Unit types
—1 unit in all
Address
GUT NO 302 AND GUT NO 292, KarlaPIN 410405
Village
Karla, Mawal taluka
Land area for this project
73,100 sq m (7,86,841 sq ft)
Permissible built-up area
13,263 sq m (1,42,764 sq ft)
Sanctioned built-up area
13,263 sq m (1,42,764 sq ft)
Recreational open space
5,152 sq m (55,457 sq ft)
Designated bank account
220
Developed in phases
Yes

Survey, CTS, gat or plot numbers

GUT NO 292GUT NO 302

Land as published on MahaRERA's project page

GUT NO 302 AND GUT NO 292

Boundaries

North
Gut Nos 306 311 294 And 295
South
Gut N0 290 291 And Indrayani River
East
Gut 290 291 And 304
West
Gut No 301 And Indrayani River

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking1 unit

1 unit registered

— · 1 unit
TypeCarpet areaUnits
——1

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAdinath Patkar—
Chartered accountantAshish Maheshwari & Associates Chartered Accountants—
EngineerMahadeo Rahate—

Source: MahaRERA project page. Contact details are not shown.