Vivacity
Deedo IDDP-PUN-3Z19It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 88% of its units are booked.
Haveli, Maharashtra 411015 · Property rates in Haveli · Promoter: Realcon Landmarks LLP
It is due for completion in Dec 2026, with no extension on record
- This projectRegistered 6 Dec 2021, completion promised 31 Dec 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
6 buildings
Open a building to see every flat, floor by floor.
- A13 floors · 81 units99% booked
- B11 floors · 86 units45% booked
- C11 floors · 76 units99% booked
- D10 floors · 113 units90% booked
- E10 floors · 102 units94% booked
- F11 floors · 71 units100% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100032086
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100032086 | 6 Dec 2021 | 31 Dec 2026 | 31 Dec 2026 | Realcon Landmarks LLP | Project page |
Documents104
1 document held by Deedo, 103 filings listed on MahaRERA's project page
Finance
- PAN CardPAN-Realcon landmark LLP.pdf · uploaded 17 Nov 2021Source
Legal
Migrated
- 1 Details of encumbrancesNo emcumbrance_Dhanori.pdf · uploaded 12 Nov 2021Source
- 1 Copy of Layout Approval (in case of layout)Vivacity- LAYOUT.pdf · uploaded 12 Nov 2021Source
- 1 Building Plan Approval / NA Order for plotted development4-18 - A - FLOOR PLANS_compressed.pdf · uploaded 12 Nov 2021Source
- 2 Building Plan Approval / NA Order for plotted development9-18 - B - FLOOR PLANS_compressed.pdf · uploaded 12 Nov 2021Source
Show all 104 documentsShow fewer documents
Migrated
- 3 Building Plan Approval / NA Order for plotted development15-18 - F - FLOOR PLANS_compressed.pdf · uploaded 12 Nov 2021Source
- 1 Commencement Certificates / NA Order for plotted development211022 - CC_compressed (1).pdf · uploaded 12 Nov 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dhanori Form1_compressed.pdf · uploaded 12 Nov 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2_Viva City.pdf · uploaded 12 Nov 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Form 03 Viva City311021.PDF · uploaded 12 Nov 2021Source
- 1 PAN CardPAN-Realcon landmark LLP.pdf · uploaded 17 Nov 2021Source
- 1 Copy of the legal title reportRERA -TSR-24-11-2021.pdf · uploaded 26 Nov 2021Source
- 1 Declaration about Commencement CertificateFormatD_declaration.pdf · uploaded 26 Nov 2021Source
- 1 Declaration in FORM BFormB.pdf · uploaded 26 Nov 2021Source
- 1 Proforma of Allotment letterDRAFT AGREEMENT TOSELL ALLOTMENT LETTER.pdf · uploaded 26 Nov 2021Source
- 1 CERSAI detailsCERSAI_Realcon.pdf · uploaded 27 Nov 2021Source
- 2 Proforma of Allotment letterDhanori 9 Draft new-01-02-2022 (2).pdf · uploaded 9 Feb 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Vivacity.pdf · uploaded 1 Oct 2022Source
- 2 Copy of Layout Approval (in case of layout)1881_1_compressed.pdf · uploaded 14 Oct 2022Source
- 2 Commencement Certificates / NA Order for plotted development220810 - CC_compressed.pdf · uploaded 14 Oct 2022Source
- 2 Declaration about Commencement CertificateCC Declaration (1).pdf · uploaded 14 Oct 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)kohinoor viva city date-14-01-23_compressed.pdf · uploaded 12 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Viva City.pdf · uploaded 12 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)viva city.pdf · uploaded 12 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)viva city_compressed.pdf · uploaded 12 Feb 2023Source
- 3 Copy of Layout Approval (in case of layout)1-34_compressed.pdf · uploaded 23 Feb 2023Source
- 3 Commencement Certificates / NA Order for plotted development230117 - CC - Revised.pdf · uploaded 23 Feb 2023Source
- 3 Declaration about Commencement CertificateViva City CC declaration.pdf · uploaded 23 Feb 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)230630 -Viva City- Form 1.pdf · uploaded 24 Jul 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)20230710_Form 2_Viva city.pdf · uploaded 24 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Viva City.PDF · uploaded 5 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Vivacity.pdf · uploaded 29 Sep 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 21 22.pdf · uploaded 13 Mar 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 22 23.pdf · uploaded 13 Mar 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 22 23.pdf · uploaded 13 Mar 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 21 22.pdf · uploaded 13 Mar 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 22 23.pdf · uploaded 13 Mar 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 22 23.pdf · uploaded 13 Mar 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 22-23.pdf · uploaded 14 Mar 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 23-24.pdf · uploaded 14 Mar 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 23-24.pdf · uploaded 14 Mar 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 22-23.pdf · uploaded 14 Mar 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 23-24.pdf · uploaded 14 Mar 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3 23-24.pdf · uploaded 14 Mar 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q2 22-23.pdf · uploaded 14 Mar 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 22-23.pdf · uploaded 14 Mar 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q2 23-24_1.pdf · uploaded 14 Mar 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3 23-24.pdf · uploaded 14 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Viva City Q1 22 23.pdf · uploaded 19 Mar 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIVA CITY Q4 21 22.pdf · uploaded 20 Mar 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIVA CITY Q1 22 23.pdf · uploaded 20 Mar 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 VIVA CITY.pdf · uploaded 19 Apr 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VIVA CITY.pdf · uploaded 19 Apr 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VIVA CITY.pdf · uploaded 20 Apr 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-01 Q1 FY 24-25 VIVA CITY.pdf · uploaded 20 Jul 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-02 Q1 FY 24-25 VIVA CITY.pdf · uploaded 20 Jul 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-03 Q1 FY 24-25 VIVA CITY.pdf · uploaded 20 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Viva City.pdf · uploaded 8 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Viva city.pdf · uploaded 11 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Viva city.pdf · uploaded 19 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Viva city.pdf · uploaded 19 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A_VIVA CITY.pdf · uploaded 3 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Viva city.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_VIVA CITY.pdf · uploaded 27 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_VIVA CITY.pdf · uploaded 27 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_K VIVA CITY.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 03_Viva City.pdf · uploaded 9 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 02_Viva City.pdf · uploaded 9 May 2025Source
- Withdrawal Update Form 1Viva city.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 2Form 02_Viva City.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 3Form 03_Viva City.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 1FORM 1- VIVA CITY.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 2Form 02_Viva City.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 3Form 03_Viva City.pdf · uploaded 25 Oct 2025Source
- Form 5 (FY 2024-2025)Form 05_Viva City.pdf · uploaded 7 Nov 2025Source
- Form 2A (FY 2024-2025)Form 2A_Viva City.pdf · uploaded 15 Nov 2025Source
- Withdrawal Update Form 1FORM 1_VIVA CITY.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Form 02_Viva City.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Form 03_Viva City.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Form 1 - Viva city.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 2Form 02_Viva City.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 3Form 03_Viva City.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 1Viva city.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 2Form 02_Viva City.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 3Form 03_Viva City.pdf · uploaded 19 Jul 2026Source
- Form 5 (FY 2025-2026)Viva Pixel Phase I Form 05 _31-03-2026.pdf · uploaded 31 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A-Viva City.pdf · uploaded 23 Sep 2026Source
Technical
- DocumentVivacity- LAYOUT.pdf · uploaded 12 Nov 2021Source
- Document4-18 - A - FLOOR PLANS_compressed.pdf · uploaded 12 Nov 2021Source
- Document9-18 - B - FLOOR PLANS_compressed.pdf · uploaded 12 Nov 2021Source
- Document15-18 - F - FLOOR PLANS_compressed.pdf · uploaded 12 Nov 2021Source
- Document1881_1_compressed.pdf · uploaded 14 Oct 2022Source
- Document1-34_compressed.pdf · uploaded 23 Feb 2023Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsS NO 9
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, TWO AND HALF BHK, 1BHK, Shop, 3BHK529 units in all
- Address
- S No 9 Village Dhanori Tal Haveli Dist Pune, S No 9, , Village Dhanori, Tal Pune City, PunePIN 411015
- Location
- 18.61180, 73.90620
- Designated bank account
- 82
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- 18 Mtr Wide Dp Road
- South
- Adj S No 9 Part
- East
- By 30 Mt Wide Dp Road
- West
- Adj S Sno 9 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking529 units
463 of 529 units booked (88%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A | 2BHK | 60.4 sq m · 650 sq ft | 9 | 8 |
| A | 2BHK | 63.24 sq m · 681 sq ft | 28 | 28 |
| A | 2BHK | 64.58 sq m · 695 sq ft | 1 | 1 |
| A | TWO AND HALF BHK | 71.1 sq m · 765 sq ft | 8 | 8 |
| A | TWO AND HALF BHK | 72.43 sq m · 780 sq ft | 35 | 35 |
| B | 1BHK | 39.39 sq m · 424 sq ft | 36 | 6 |
| B | 1BHK | 39.4 sq m · 424 sq ft | 9 | 5 |
| B | 1BHK | 45.68 sq m · 492 sq ft | 8 | 0 |
Show all 41 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B | 2BHK | 62.79 sq m · 676 sq ft | 9 | 9 |
| B | 2BHK | 63.24 sq m · 681 sq ft | 18 | 16 |
| B | Shop | 21.2 sq m · 228 sq ft | 4 | 2 |
| B | Shop | 23.28 sq m · 251 sq ft | 2 | 1 |
| C | 2BHK | 62.79 sq m · 676 sq ft | 18 | 18 |
| C | 2BHK | 63.24 sq m · 681 sq ft | 27 | 26 |
| C | 2BHK | 67.6 sq m · 728 sq ft | 1 | 1 |
| C | 3BHK | 83.93 sq m · 903 sq ft | 17 | 17 |
| C | Shop | 21.2 sq m · 228 sq ft | 8 | 8 |
| C | Shop | 23.28 sq m · 251 sq ft | 5 | 5 |
| D | 2BHK | 62.79 sq m · 676 sq ft | 18 | 17 |
| D | 2BHK | 63.24 sq m · 681 sq ft | 18 | 18 |
| D | 3BHK | 83.93 sq m · 903 sq ft | 18 | 18 |
| D | 3BHK | 87.04 sq m · 937 sq ft | 18 | 17 |
| D | Shop | 17.03 sq m · 183 sq ft | 1 | 1 |
| D | Shop | 21.18 sq m · 228 sq ft | 12 | 6 |
| D | Shop | 23.31 sq m · 251 sq ft | 9 | 6 |
| D | Shop | 36.23 sq m · 390 sq ft | 1 | 1 |
| D | TWO AND HALF BHK | 71.1 sq m · 765 sq ft | 18 | 18 |
| E | 2BHK | 60.4 sq m · 650 sq ft | 27 | 26 |
| E | 2BHK | 63.24 sq m · 681 sq ft | 18 | 17 |
| E | 2BHK | 66.61 sq m · 717 sq ft | 1 | 1 |
| E | 2BHK | 69.36 sq m · 747 sq ft | 1 | 1 |
| E | 3BHK | 81.99 sq m · 883 sq ft | 26 | 23 |
| E | 3BHK | 87.04 sq m · 937 sq ft | 17 | 16 |
| E | Shop | 21.18 sq m · 228 sq ft | 6 | 6 |
| E | Shop | 23.28 sq m · 251 sq ft | 6 | 6 |
| F | 2BHK | 60.4 sq m · 650 sq ft | 26 | 26 |
| F | 2BHK | 62.79 sq m · 676 sq ft | 18 | 18 |
| F | 2BHK | 63.24 sq m · 681 sq ft | 8 | 8 |
| F | 3BHK | 81.99 sq m · 883 sq ft | 9 | 9 |
| F | 3BHK | 87.04 sq m · 937 sq ft | 9 | 9 |
| F | 3BHK | 91.71 sq m · 987 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals61
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vk A Architecture | — |
| Chartered accountant | Vinod N Nikam & Co | — |
| Engineer | Planedge Consultants Pvt Ltd | — |
| Registered real estate agent | Aarti Rohit Shaha | — |
| Registered real estate agent | Abhijit Prafulla Deori | — |
| Registered real estate agent | Abhilasha Shrivastava | — |
| Registered real estate agent | Amit Devraj Swain | — |
| Registered real estate agent | Amit Pareek Trivedi | — |
Show all 61 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Anish Neema | — |
| Registered real estate agent | Ankit Kumar Chaudhary | — |
| Registered real estate agent | Baljit Kaur | — |
| Registered real estate agent | Bhoomi Singh | — |
| Registered real estate agent | Bhushan Tarachand Sorte | — |
| Registered real estate agent | Devendra Jagannath Jagtap | — |
| Registered real estate agent | Dhiraj Kumar Dahiya | — |
| Registered real estate agent | Gourav Gupta | — |
| Registered real estate agent | Ishwar Baban Misal | — |
| Registered real estate agent | Jalindar Sahebrao Vhojage | — |
| Registered real estate agent | Kamalesh Rajendra Patil | — |
| Registered real estate agent | Kishor Bharat Mittal | — |
| Registered real estate agent | Krishna Kumar Panday | — |
| Registered real estate agent | Kunal Sham Gholap | — |
| Registered real estate agent | Kundan Balaji Kamble | — |
| Registered real estate agent | Manish Gaur | — |
| Registered real estate agent | Manju Dip | — |
| Registered real estate agent | Nishant Madhukar Bhoinallu | — |
| Registered real estate agent | Pankaj Singh | — |
| Registered real estate agent | Parvati Mahendra Pratap Goswami | — |
| Registered real estate agent | Prachi Dilip More | — |
| Registered real estate agent | Prashant Shahurao Lande | — |
| Registered real estate agent | pravin shantappa dhodmani | — |
| Registered real estate agent | Rahul Ramkrishna Pal | — |
| Registered real estate agent | Rajeshree Yogesh Shah | — |
| Registered real estate agent | Raj Sadashiv Bansode | — |
| Registered real estate agent | Raju Namdev Jagtap | — |
| Registered real estate agent | Reetu Singh | — |
| Registered real estate agent | Rishabh Jain | — |
| Registered real estate agent | Rohit Singh | — |
| Registered real estate agent | Rohit Sunil Wadyalkar | — |
| Registered real estate agent | Roshan Pradeep Salunkhe | — |
| Registered real estate agent | Ruby Singh | — |
| Registered real estate agent | Rushikesh Rameshrao Patil | — |
| Registered real estate agent | Sachin Manikrao Khedekar | — |
| Registered real estate agent | Sagar Mohan Nanaware | — |
| Registered real estate agent | Sahil Raju Kapoor | — |
| Registered real estate agent | Samod Munnalal Jadon | — |
| Registered real estate agent | Sandip Shivaji Rathod | — |
| Registered real estate agent | Sanjay Bhanudas Waghmare | — |
| Registered real estate agent | Sanjay Chandradhar Mishra | — |
| Registered real estate agent | Sanjeev Kumar | — |
| Registered real estate agent | Saroj Vinod Jain | — |
| Registered real estate agent | Sharad Baban Khalse | — |
| Registered real estate agent | Shreyash Bisen | — |
| Registered real estate agent | Shubham Nilkantharao Pusadkar | — |
| Registered real estate agent | Shubham Rajendra Nashine | — |
| Registered real estate agent | Sonika Dilip Pol | — |
| Registered real estate agent | Sumit Sanjay Jagtap | — |
| Registered real estate agent | Sunayana Wason | — |
| Registered real estate agent | Sunil Chandrakant Suratwala | — |
| Registered real estate agent | Vaishali Shailesh Aher | — |
| Registered real estate agent | Vikas Satish Gupta | — |
Source: MahaRERA project page. Contact details are not shown.