Ace Abode Phase 2B
It is due for completion in Jun 2027, with no extension on record; no MahaRERA orders on record; 99% of its units are booked.
Haveli, Maharashtra 412101 · Property rates in Haveli · Promoter: Ace Global Realty
It is due for completion in Jun 2027, with no extension on record
- This projectRegistered 10 May 2022, completion promised 30 Jun 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- Wing C from 11th to 13th Floor3 floors · 18 units100% booked
- Wing E from 11th to 13th floor3 floors · 18 units94% booked
- Wing F From 11th to 13th Floor3 floors · 18 units100% booked
- Wing G From 11th to 13th Floor3 floors · 24 units100% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100035136
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100035136 | 10 May 2022 | 30 Jun 2027 | 30 Jun 2027 | Ace Global Realty | Project page |
Documents140
1 document held by Deedo, 139 filings listed on MahaRERA's project page
Finance
- PAN Carddownload-3.pdf · uploaded 6 May 2022Source
Legal
- Legal Title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-1-5.pdf · uploaded 3 Mar 2022Source
- Legal Title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-6-10.pdf · uploaded 3 Mar 2022Source
- Legal Title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-11-15.pdf · uploaded 3 Mar 2022Source
- Legal Title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-16-20.pdf · uploaded 3 Mar 2022Source
- Legal Title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-21-25.pdf · uploaded 3 Mar 2022Source
- Legal Title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-26-28.pdf · uploaded 3 Mar 2022Source
Show all 140 documentsShow fewer documents
Legal
Migrated
- 1 Copy of the legal title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-1-5.pdf · uploaded 3 Mar 2022Source
- 2 Copy of the legal title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-6-10.pdf · uploaded 3 Mar 2022Source
- 3 Copy of the legal title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-11-15.pdf · uploaded 3 Mar 2022Source
- 4 Copy of the legal title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-16-20.pdf · uploaded 3 Mar 2022Source
- 5 Copy of the legal title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-21-25.pdf · uploaded 3 Mar 2022Source
- 6 Copy of the legal title reportAce_Abode_Phase_2B - Legal Title Report_Compressed-26-28.pdf · uploaded 3 Mar 2022Source
- 1 Details of encumbrancesAce_Abode_Phase_2B - No Encumbrances.pdf · uploaded 3 Mar 2022Source
- 1 Declaration in FORM BAce_Abode_Phase_2B - Form B Affidavit Cum Declaration_Compressed.pdf · uploaded 3 Mar 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ace_Abode_Phase_2B - Form 1 Architect Certificate_compressed.pdf · uploaded 3 Mar 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ace_Abode_Phase_2B - Form 2 Engineer Certificate_Compressed.pdf · uploaded 3 Mar 2022Source
- 1 Proforma of Allotment letterAce_Abode_Phase_2B - Draft Allotment Letter.pdf · uploaded 3 Mar 2022Source
- 2 Proforma of Allotment letterAce_Abode_Phase_2B - Draft ATS.pdf · uploaded 3 Mar 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ace_Abode_Phase_2B - CA Certificate (Form 3).pdf · uploaded 10 Mar 2022Source
- 1 Copy of Layout Approval (in case of layout)Sheet No 01 Compress.pdf · uploaded 22 Apr 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentSheet No 01 Compress.pdf · uploaded 22 Apr 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC 30-03-2022.pdf · uploaded 22 Apr 2022Source
- 1 Declaration about Commencement CertificateAGR Declaration abt CC.pdf · uploaded 22 Apr 2022Source
- 1 CERSAI detailsCERSAI.pdf · uploaded 25 Apr 2022Source
- 1 PAN Carddownload-3.pdf · uploaded 6 May 2022Source
- 2 Details of encumbrancesEncumbarance Ace Abode Phase 2B.pdf · uploaded 27 Jun 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ACE ABODE PHASE 2B.pdf · uploaded 20 Jul 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Phase 2B Ace Abode.pdf · uploaded 20 Jul 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Phase 2B_Ace Abode.pdf · uploaded 20 Jul 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ace Abode Phase 2B.pdf · uploaded 12 Oct 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ace Abode Phase 2B.pdf · uploaded 12 Oct 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ace Abode Phase 2B.pdf · uploaded 18 Oct 2022Source
- 3 Details of encumbrancesIndex II Mortgage Copy_Ace Abode_compressed.pdf · uploaded 12 Nov 2022Source
- 4 Details of encumbrancesAce Abode Phase 2B.pdf · uploaded 17 Nov 2022Source
- 5 Details of encumbrancesAce Abode Phase 2B.pdf · uploaded 18 Nov 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ace Abode Phase 2B.pdf · uploaded 9 Jan 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Ace Abode Phase 2B.pdf · uploaded 14 Jan 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Abode 2B3.pdf · uploaded 14 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)ABODE 2B.pdf · uploaded 20 Jan 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Abode 2B.pdf · uploaded 7 Apr 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed_ABODE WING 2B.pdf · uploaded 7 Apr 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Abode 2B.pdf · uploaded 11 Apr 2023Source
- 6 Details of encumbrancesSelf Declaration Encumbrances Finance Abode Phase 2B.pdf · uploaded 26 Jun 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Phase 2B.pdf · uploaded 6 Jul 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Phase 2B.pdf · uploaded 7 Jul 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Phase 2B_11zon.pdf · uploaded 7 Jul 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Phase 2B.pdf · uploaded 30 Sep 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 2B.pdf · uploaded 30 Sep 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 2B_11zon.pdf · uploaded 30 Sep 2023Source
- 7 Details of encumbrancesSelf Declaration Encumbrances Finance Abode Phase 2B.pdf · uploaded 2 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)ACE ABODE PHASE 2B MAR 23.pdf · uploaded 27 Dec 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)ACE GLOBAL REALTY PHASE 2B.pdf · uploaded 19 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)ACE ABODE PHASE 2B.pdf · uploaded 19 Jan 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)ACE ABODE WING 2B.pdf · uploaded 19 Jan 2024Source
- 2 Copy of Layout Approval (in case of layout)Ace Abode Master LayOut Sheet 1 of 34.pdf · uploaded 13 Feb 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)WING PHASE 2B.pdf · uploaded 18 Apr 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Phase 2B.pdf · uploaded 19 Apr 2024Source
- 1 Disclosure of sold/ booked inventoryACE ABODE PHASE 2B.pdf · uploaded 20 Apr 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)ABODE PHASE 2B.pdf · uploaded 20 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Ace Abode Phase 2B.pdf · uploaded 24 May 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)ACE ABODE PHASE -2B.pdf · uploaded 16 Jul 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)ACE ABODE WING -2B.pdf · uploaded 16 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ace Abode Phase 2B.pdf · uploaded 17 Jul 2024Source
- 2 Disclosure of sold/ booked inventoryASE ABODE PHASE 2B.pdf · uploaded 18 Jul 2024Source
- 2 a Details of encumbrances concerned to FinanceAbode 2B.pdf · uploaded 10 Oct 2024Source
- 3 a Details of encumbrances concerned to FinanceAbode 2B.pdf · uploaded 10 Oct 2024Source
- 1 Details of encumbrancesAbode 2B.pdf · uploaded 10 Oct 2024Source
- 1 Other – LegalIndex II mortgage deed 2024.pdf · uploaded 10 Oct 2024Source
- 1 CERSAI detailsCERSAI Search Report 10102024.pdf · uploaded 10 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalAbode 2B.pdf · uploaded 10 Oct 2024Source
- 2 b Details of encumbrances concerned to LegalAbode 2B.pdf · uploaded 10 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ACE ABODE PHASE 2B.pdf · uploaded 19 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)ACE ABODE 2B.pdf · uploaded 19 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ACE ABODE PHASE 2B.pdf · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryAce Abode Phase 2B.pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)AGR PHASE 2B FORM 5 2023-24.pdf · uploaded 3 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ACE ABODE PHASE 2B.pdf · uploaded 16 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Abode Phase 2B.pdf · uploaded 18 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)ACE ABODE WING 2B Q3 2425.pdf · uploaded 18 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ACE ABODE PHASE 2B.pdf · uploaded 18 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryAbode Phase 2B.pdf · uploaded 18 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ace Abode PH 2B.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ace Abode Wing 2B Form 3 Final.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)AGR_Ace Abode-2B.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventory2) ACE ABODE PHASE 2B.pdf · uploaded 19 Apr 2025Source
- Form 1Ace Abode 2B Form 1.pdf · uploaded 21 Jul 2025Source
- Form 2Ace Abode Phase 2B Form 2.pdf · uploaded 21 Jul 2025Source
- Form 3Ace Abode Wing 2B Form 3.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked Inventorys un .pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 1Withdrawal Update Form 1 · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2Withdrawal Update Form 2 · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3Withdrawal Update Form 3 · uploaded 20 Oct 2025Source
- Form 5 (FY 2024-2025)AGR 2B FORM5 2024-25.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Ace Abode Phase 2B Form 1 Q3 25-26_.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Abode Phase 2B Form 2 Q3 25-26.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3AGR 2B FORM 3 Q3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Ace Abode Phase 2B Form-1.pdf · uploaded 22 Apr 2026Source
- Withdrawal Update Form 2Ace Abode Phase 2B Form-2.pdf · uploaded 22 Apr 2026Source
- Withdrawal Update Form 3AGR 2B Form-3 Q4 25-26 (1).pdf · uploaded 22 Apr 2026Source
- Withdrawal Update Form 1Ace Abode Phase 2B Form 1 Q1 26-27.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Ace Abode Phase 2B Form 2.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3AGR 2B FORM-3 26-27 Q1.pdf · uploaded 20 Jul 2026Source
- Form 2A (FY 2024-2025)Ace Abode Phase 2B Form 2A 24-25.pdf · uploaded 12 Aug 2026Source
- Form 2A (FY 2025-2026)Ace Abode Phase 2B Form 2A 25-26.pdf · uploaded 12 Aug 2026Source
Technical
- DocumentSheet No 01 Compress.pdf · uploaded 22 Apr 2022Source
- DocumentSheet No 01 Compress.pdf · uploaded 22 Apr 2022Source
- DocumentAce Abode Master LayOut Sheet 1 of 34.pdf · uploaded 13 Feb 2024Source
- DocumentCC dated 13-12-2024.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 1.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 2.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 3.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 4.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 13.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 14.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 15.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 16.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 23.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 24.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 25.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 26.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 27.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 28.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 29.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 30.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 31.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 32.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 33.pdf · uploaded 22 Apr 2026Source
- DocumentSHEET 34.pdf · uploaded 22 Apr 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals87/B, 88/10/1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK78 units in all
- Address
- 87/B, 88/10/1, 88/10/2, 88/4, 88/11, 88/16+17+18 KIWALE, Kiwale Road, KiwalePIN 412101
- Location
- 18.65358, 73.72484
- Designated bank account
- 109
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- Proposed Ace Abode Wing D
- South
- Part of S No 87B Ace Abode Wing B
- East
- Part of S No 88
- West
- Part of S No 88 and Ace Abode Wing A and B
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking78 units
77 of 78 units booked (99%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing C from 11th to 13th Floor | 2BHK | 60.93 sq m · 656 sq ft | 4 | 4 |
| Wing C from 11th to 13th Floor | 2BHK | 60.97 sq m · 656 sq ft | 2 | 2 |
| Wing C from 11th to 13th Floor | 2BHK | 68.22 sq m · 734 sq ft | 1 | 1 |
| Wing C from 11th to 13th Floor | 3BHK | 80.82 sq m · 870 sq ft | 4 | 4 |
| Wing C from 11th to 13th Floor | 3BHK | 81.8 sq m · 880 sq ft | 2 | 2 |
| Wing C from 11th to 13th Floor | 3BHK | 85.03 sq m · 915 sq ft | 4 | 4 |
| Wing C from 11th to 13th Floor | 3BHK | 85.71 sq m · 923 sq ft | 1 | 1 |
| Wing E from 11th to 13th floor | 2BHK | 60.93 sq m · 656 sq ft | 2 | 2 |
Show all 29 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing E from 11th to 13th floor | 2BHK | 60.97 sq m · 656 sq ft | 1 | 1 |
| Wing E from 11th to 13th floor | 2BHK | 61.03 sq m · 657 sq ft | 3 | 3 |
| Wing E from 11th to 13th floor | 3BHK | 68.22 sq m · 734 sq ft | 1 | 1 |
| Wing E from 11th to 13th floor | 3BHK | 80.82 sq m · 870 sq ft | 4 | 4 |
| Wing E from 11th to 13th floor | 3BHK | 81.8 sq m · 880 sq ft | 2 | 2 |
| Wing E from 11th to 13th floor | 3BHK | 85.03 sq m · 915 sq ft | 4 | 3 |
| Wing E from 11th to 13th floor | 3BHK | 85.71 sq m · 923 sq ft | 1 | 1 |
| Wing F From 11th to 13th Floor | 2BHK | 56.08 sq m · 604 sq ft | 4 | 4 |
| Wing F From 11th to 13th Floor | 2BHK | 56.28 sq m · 606 sq ft | 2 | 2 |
| Wing F From 11th to 13th Floor | 2BHK | 61 sq m · 657 sq ft | 4 | 4 |
| Wing F From 11th to 13th Floor | 2BHK | 61.29 sq m · 660 sq ft | 1 | 1 |
| Wing F From 11th to 13th Floor | 2BHK | 61.88 sq m · 666 sq ft | 2 | 2 |
| Wing F From 11th to 13th Floor | 3BHK | 75.9 sq m · 817 sq ft | 4 | 4 |
| Wing F From 11th to 13th Floor | 3BHK | 76.66 sq m · 825 sq ft | 1 | 1 |
| Wing G From 11th to 13th Floor | 2BHK | 56.08 sq m · 604 sq ft | 8 | 8 |
| Wing G From 11th to 13th Floor | 2BHK | 56.28 sq m · 606 sq ft | 4 | 4 |
| Wing G From 11th to 13th Floor | 2BHK | 61 sq m · 657 sq ft | 4 | 4 |
| Wing G From 11th to 13th Floor | 2BHK | 61.29 sq m · 660 sq ft | 1 | 1 |
| Wing G From 11th to 13th Floor | 2BHK | 61.88 sq m · 666 sq ft | 2 | 2 |
| Wing G From 11th to 13th Floor | 3BHK | 75.9 sq m · 817 sq ft | 4 | 4 |
| Wing G From 11th to 13th Floor | 3BHK | 76.77 sq m · 826 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | Ravi Talreja | — |
| Engineer | Bhausaheb Jangale | — |
| Engineer | Narendra Bhagwan Gosavi | — |
| Engineer | Pranav Shantaram Patil | — |
Source: MahaRERA project page. Contact details are not shown.