Kumar Purab A3 Building
Deedo IDDP-PUN-3PXHCompletion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 56% of its units are booked.
Hadapsar, Pune 411028 · Property rates in Hadapsar · Promoter: Kumar & Potnis Associates
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 14 Nov 2022, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | Kumar Purab A3 Building · 1407 | Primary sale | 959 sq ft | View Primary sale, Sep 2026 | |
| Apr 2026 | Kumar Purab A3 Building · 1607 | Primary sale | 959 sq ft | View Primary sale, Apr 2026 | |
| Mar 2026 | Kumar Purab A3 Building · 303 | Primary sale | 575 sq ft | View Primary sale, Mar 2026 | |
| Jan 2026 | Kumar Purab A3 Building · 603 | Primary sale | 575 sq ft | View Primary sale, Jan 2026 | |
| Jan 2026 | Kumar Purab A3 Building · 1303 | Primary sale | 575 sq ft | View Primary sale, Jan 2026 | |
| Jan 2026 | Kumar Purab A3 Building · 1602 | Primary sale | 593 sq ft | View Primary sale, Jan 2026 | |
| Jan 2026 | Kumar Purab A3 Building · 403 | Primary sale | 575 sq ft | View Primary sale, Jan 2026 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100047614
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100047614 | 14 Nov 2022 | 31 Dec 2027 | 30 Apr 2028 | Kumar & Potnis Associates | Project page |
Documents136
1 document held by Deedo, 135 filings listed on MahaRERA's project page
Finance
- PAN CardPAN.pdf · uploaded 2 Sep 2022Source
Legal
Show all 136 documentsShow fewer documents
Migrated
- 1 Declaration in FORM BFORM B AFFIDAVIT KPA.pdf · uploaded 2 Sep 2022Source
- 1 CERSAI detailsCERSAI Search Report.pdf · uploaded 3 Sep 2022Source
- 1 b Details of encumbrances concerned to LegalENCUMBRANCE CERTIFICATE.pdf · uploaded 16 Sep 2022Source
- 1 Declaration about Commencement CertificateDeclaration Form D Commencement Certificate.pdf · uploaded 16 Sep 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 16 Sep 2022Source
- 1 Copy of Layout Approval (in case of layout)Layout_compressed.pdf · uploaded 17 Sep 2022Source
- 1 Building Plan Approval / NA Order for plotted development1st and typical floor plan_compressed.pdf · uploaded 17 Sep 2022Source
- 2 Building Plan Approval / NA Order for plotted development4th Floor Refuge and 6th Floor Plan_compressed.pdf · uploaded 17 Sep 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentBasement_compressed.pdf · uploaded 17 Sep 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentGround Floor and Parking 1_compressed.pdf · uploaded 17 Sep 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentTerrace Floor and Section_compressed.pdf · uploaded 17 Sep 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentSection_compressed.pdf · uploaded 17 Sep 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentSection_compressed.pdf · uploaded 17 Sep 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentGround Floor and Parking 1_compressed.pdf · uploaded 17 Sep 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 17 Sep 2022Source
- 1 a Details of encumbrances concerned to FinanceFINANCE ENCUMBRANCE CERTIFICATE.pdf · uploaded 23 Sep 2022Source
- 1 Proforma of Allotment letterALLOTMENT LETTER FOR KUMAR PURAB 04102022 VGE - FINAL.pdf · uploaded 4 Oct 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A Declaration about separate Bank Account updated.pdf · uploaded 14 Oct 2022Source
- 1 Deviation Report with respect to Allotment letterallotment No Deviation.pdf · uploaded 15 Oct 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)New Updated C A Certificate Purab_compressed.pdf · uploaded 19 Oct 2022Source
- 1 Proforma of Agreement for saleKumar Purab Unit RERA.pdf · uploaded 4 Nov 2022Source
- 1 Deviation Report with respect to model copy of AgreementKumar Purab Unit RERA Deviations.pdf · uploaded 4 Nov 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE 14 04 2023.pdf · uploaded 20 Apr 2023Source
- 9 Building Plan Approval / NA Order for plotted development1_compressed.pdf · uploaded 14 Jul 2023Source
- 10 Building Plan Approval / NA Order for plotted development2_compressed.pdf · uploaded 14 Jul 2023Source
- 11 Building Plan Approval / NA Order for plotted development5_compressed.pdf · uploaded 14 Jul 2023Source
- 12 Building Plan Approval / NA Order for plotted development7_compressed.pdf · uploaded 14 Jul 2023Source
- 13 Building Plan Approval / NA Order for plotted development8_compressed.pdf · uploaded 14 Jul 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC_28 06 2023.pdf · uploaded 14 Jul 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Kumar Purab A3.pdf · uploaded 19 Jul 2023Source
- 1 Disclosure of sold/ booked inventoryKumar Purab - Placida A3.PDF · uploaded 19 Jul 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Kumar Purab A3.PDF · uploaded 29 Aug 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Purab_A3_Engineer's Certificate.pdf · uploaded 11 Oct 2023Source
- 2 Disclosure of sold/ booked inventorySold Unsold Inventory - Purab A3.PDF · uploaded 11 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Purab A3.pdf · uploaded 12 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 3 Purab A3.PDF · uploaded 20 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Purab A3.PDF · uploaded 28 Nov 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Kumar Purab A3.PDF · uploaded 18 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Purab_A3_Engineer's Certificate.pdf · uploaded 18 Jan 2024Source
- 3 Disclosure of sold/ booked inventorySold Unsold Inventory - Purab A3.pdf · uploaded 18 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Kumar Purab A3.pdf · uploaded 18 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Purab A3 - 2023.pdf · uploaded 20 Jan 2024Source
- 14 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 19 Feb 2024Source
- 15 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 19 Feb 2024Source
- 16 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 19 Feb 2024Source
- 17 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 19 Feb 2024Source
- 18 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 19 Feb 2024Source
- 19 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 19 Feb 2024Source
- 20 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 19 Feb 2024Source
- 21 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 19 Feb 2024Source
- 22 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 19 Feb 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 19 Feb 2024Source
- 2 a Details of encumbrances concerned to FinancePurab A3 - Emcumbrance - Financial.pdf · uploaded 29 Mar 2024Source
- 2 b Details of encumbrances concerned to LegalPurab A3 - Emcumbrance - Financial.pdf · uploaded 29 Mar 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kumar Purab A3.pdf · uploaded 8 Apr 2024Source
- 4 Disclosure of sold/ booked inventorySold Unsold - Purab A3.pdf · uploaded 8 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Kumar Purab A 3.pdf · uploaded 10 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Purab A 3.pdf · uploaded 22 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Purab A 3 - 2022-23.pdf · uploaded 22 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Kumar Purab A3 - 2023-24.pdf · uploaded 7 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - Kumar Purab A3 - 2023-24.pdf · uploaded 12 Jun 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Kumar Purab A3.pdf · uploaded 15 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kumar Purab A3.pdf · uploaded 15 Jul 2024Source
- 5 Disclosure of sold/ booked inventorySold Unsold inventory - Kumar Purab A3.pdf · uploaded 15 Jul 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Purab A3 Bldg.PDF · uploaded 20 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kumar Periwinkle B3.pdf · uploaded 20 Oct 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kumar Purab A3.pdf · uploaded 20 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Kumar Purab A3_compressed.pdf · uploaded 22 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 K Palaash A2.PDF · uploaded 17 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 K Purab A3 Bldg.PDF · uploaded 17 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Palaash A2 Oct to Dec 2024.PDF · uploaded 17 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kumar Purab A3.PDF · uploaded 17 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Palaash A2 Engineers Certificate.pdf · uploaded 17 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Purab A3 Engineers Certificate.pdf · uploaded 17 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryKUMAR PALAASH A2.PDF · uploaded 17 Jan 2025Source
- 2 Disclosure of sold/ booked inventoryKUMAR PURAB A-3 PLACIDA.PDF · uploaded 17 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kumar Purab A3 Bldg.PDF · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Purab A3 Engineer's Certificate.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryKUMAR PURAB A3 PLACIDA.PDF · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)KPA Kumar Purab A3.pdf · uploaded 20 Apr 2025Source
- Withdrawal Update Form 1Kumar Purab A3 Bldg.PDF · uploaded 9 Nov 2025Source
- Withdrawal Update Form 2Purab A3 Engineeru0027s Certificate.pdf · uploaded 9 Nov 2025Source
- Withdrawal Update Form 3Form 3_Purab A3_Sep 25_RERA Site_Signed.pdf · uploaded 9 Nov 2025Source
- Form 5 (FY 2022-2023)Form 5 - Purab A 3 - 2022-23.pdf · uploaded 17 Nov 2025Source
- Form 5 (FY 2023-2024)Form 5 - Kumar Purab A3 - 2023-24.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 1HP SCANJET FLOW 7500.PDF · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2Purab A3 Engineers Certificate.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3Kumar Purab A3-CA Certificate.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Form 1 K.Purab A3 Bldg..PDF · uploaded 23 Apr 2026Source
- Withdrawal Update Form 2Purab A3 Engineering Certificate.pdf · uploaded 23 Apr 2026Source
- Withdrawal Update Form 3Form 1 K.Purab A3 Bldg..PDF · uploaded 23 Apr 2026Source
- Withdrawal Update Form 1KPA Form 1 Purab A3.pdf · uploaded 22 Jul 2026Source
- Withdrawal Update Form 2Purab A3 Engineers Certificate.pdf · uploaded 22 Jul 2026Source
- Withdrawal Update Form 3Kumar Purab A3 - Form 3.pdf · uploaded 22 Jul 2026Source
Technical
- DocumentLayout_compressed.pdf · uploaded 17 Sep 2022Source
- Document1st and typical floor plan_compressed.pdf · uploaded 17 Sep 2022Source
- Document4th Floor Refuge and 6th Floor Plan_compressed.pdf · uploaded 17 Sep 2022Source
- DocumentBasement_compressed.pdf · uploaded 17 Sep 2022Source
- DocumentGround Floor and Parking 1_compressed.pdf · uploaded 17 Sep 2022Source
- DocumentTerrace Floor and Section_compressed.pdf · uploaded 17 Sep 2022Source
- DocumentSection_compressed.pdf · uploaded 17 Sep 2022Source
- DocumentSection_compressed.pdf · uploaded 17 Sep 2022Source
- DocumentGround Floor and Parking 1_compressed.pdf · uploaded 17 Sep 2022Source
- Document1_compressed.pdf · uploaded 14 Jul 2023Source
- Document2_compressed.pdf · uploaded 14 Jul 2023Source
- Document5_compressed.pdf · uploaded 14 Jul 2023Source
- Document7_compressed.pdf · uploaded 14 Jul 2023Source
- Document8_compressed.pdf · uploaded 14 Jul 2023Source
- Document1.pdf · uploaded 19 Feb 2024Source
- Document2.pdf · uploaded 19 Feb 2024Source
- Document3.pdf · uploaded 19 Feb 2024Source
- Document4.pdf · uploaded 19 Feb 2024Source
- Document5.pdf · uploaded 19 Feb 2024Source
- Document6.pdf · uploaded 19 Feb 2024Source
- Document7.pdf · uploaded 19 Feb 2024Source
- Document8.pdf · uploaded 19 Feb 2024Source
- Document9.pdf · uploaded 19 Feb 2024Source
Technical (Architect)
- DocumentForm 1 Purab A3 Bldg.PDF · uploaded 20 Oct 2024Source
- DocumentForm 1 K Palaash A2.PDF · uploaded 17 Jan 2025Source
- DocumentForm 1 K Purab A3 Bldg.PDF · uploaded 17 Jan 2025Source
- DocumentKumar Purab A3 Bldg.PDF · uploaded 19 Apr 2025Source
- DocumentKPA Form 1 Purab A3.pdf · uploaded 22 Jul 2026Source
Technical (Engineer)
- DocumentForm 2 - Kumar Periwinkle B3.pdf · uploaded 20 Oct 2024Source
- DocumentForm 2 - Kumar Purab A3.pdf · uploaded 20 Oct 2024Source
- DocumentPalaash A2 Engineers Certificate.pdf · uploaded 17 Jan 2025Source
- DocumentPurab A3 Engineers Certificate.pdf · uploaded 17 Jan 2025Source
- DocumentPurab A3 Engineer's Certificate.pdf · uploaded 19 Apr 2025Source
- DocumentPurab A3 Engineers Certificate.pdf · uploaded 10 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsO L D S N O 2 5 6 H N O 1/1+1/2+2/1/2/2+3+4/1/4/2+5/1+5/2+6/1+6/2+6A/2 7A+7B+2/1/3+8 NEW S NO 256/1A/2/1/3 256/8
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, Shop137 units in all
- Address
- Old S No 256 H No 1/1+1/2+2/1/2/2+3+4/1/4/2+5/1+5/2+6/1+6/2+6a/2 7a+7b+2/1/3+8 New S No 256/1a/2/1/3 256/8, Solapur Road, Tilekar WastiPIN 411028
- Village
- Hadapsar, Haveli taluka
- Location
- 18.50703, 73.92311
- Designated bank account
- 109
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- Side Amrgin And Adj Open Space
- South
- Side Margin And Play Ground
- East
- Side Margin And Adj Existing A2 Building
- West
- Side Margin And 12 Mt Wide Dp Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking137 units
77 of 137 units booked (56%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 53.46 sq m · 575 sq ft | 16 | 2 |
| 2BHK | 55.06 sq m · 593 sq ft | 16 | 8 |
| 2BHK | 56.21 sq m · 605 sq ft | 16 | 13 |
| 2BHK | 58.02 sq m · 625 sq ft | 16 | 14 |
| 2BHK | 58.92 sq m · 634 sq ft | 48 | 37 |
| 3BHK | 89.05 sq m · 959 sq ft | 16 | 3 |
| Shop | 15.06 sq m · 162 sq ft | 3 | 0 |
| Shop | 15.74 sq m · 169 sq ft | 1 | 0 |
Show all 12 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 20.32 sq m · 219 sq ft | 1 | 0 |
| Shop | 21.5 sq m · 231 sq ft | 1 | 0 |
| Shop | 28.05 sq m · 302 sq ft | 1 | 0 |
| Shop | 28.56 sq m · 307 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Anish Avinash Nawathe | — |
| Chartered accountant | Supriya Abhijit Mundada | — |
| Engineer | Akshay Jagtap | — |
| Engineer | Mr Abhijeet Shekar | — |
Source: MahaRERA project page. Contact details are not shown.
Kumar Purab A3 Building in numbers
Registered deals, summarised
Deedo has 7 registered documents at Kumar Purab A3 Building, from Jan 2026 to Sep 2026: 7 sales. The median registered sale works out to about ₹12,100 per sq ft, at a median of ₹70 L a deal; 0% of sales were resales.
- What is the price per sq ft at Kumar Purab A3 Building?
- The median registered sale works out to about ₹12,100 per sq ft, at a median of ₹70 L a deal; 0% of sales were resales.
- How many properties have been sold at Kumar Purab A3 Building?
- 7 sales are registered at Kumar Purab A3 Building.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Kumar Purab A3 Building by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Primary sale · Sep 2026
₹1–1.5 Cr