Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 56% of its units are booked.

Hadapsar, Pune 411028 · Property rates in Hadapsar · Promoter: Kumar & Potnis Associates

DeliveryExtended 4 moPromised Dec 2027 · now due Apr 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales56% booked77 of 137 units · as the promoter reported to MahaRERAPrice₹12,060 /sq ft58.4% above Hadapsar · 7 registered sales
Kumar Purab A3 Building project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Apr 2028

  • This projectRegistered 14 Nov 2022, completion promised 31 Dec 2027, revised to 30 Apr 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Sep 2026Kumar Purab A3 Building · 1407Primary sale959 sq ftView Primary sale, Sep 2026
Apr 2026Kumar Purab A3 Building · 1607Primary sale959 sq ftView Primary sale, Apr 2026
Mar 2026Kumar Purab A3 Building · 303Primary sale575 sq ftView Primary sale, Mar 2026
Jan 2026Kumar Purab A3 Building · 603Primary sale575 sq ftView Primary sale, Jan 2026
Jan 2026Kumar Purab A3 Building · 1303Primary sale575 sq ftView Primary sale, Jan 2026
Jan 2026Kumar Purab A3 Building · 1602Primary sale593 sq ftView Primary sale, Jan 2026
Jan 2026Kumar Purab A3 Building · 403Primary sale575 sq ftView Primary sale, Jan 2026

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100047614
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004761414 Nov 202231 Dec 202730 Apr 2028Kumar & Potnis AssociatesProject page
Documents136

1 document held by Deedo, 135 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN.pdf · uploaded 2 Sep 2022Source

Legal

  • Legal Title reportHADAPSAR SEARCH AND TITLE S NO 256 1A 2 1 3.PDF · uploaded 2 Sep 2022Source
  • Legal Title reportHADAPSAR SEARCH AND TITLE S NO 256 8.PDF · uploaded 2 Sep 2022Source
  • Declaration Form BFORM B AFFIDAVIT KPA.pdf · uploaded 2 Sep 2022Source

Migrated

  • 1 PAN CardPAN.pdf · uploaded 2 Sep 2022Source
  • 1 Copy of the legal title reportHADAPSAR SEARCH AND TITLE S NO 256 1A 2 1 3.PDF · uploaded 2 Sep 2022Source
  • 2 Copy of the legal title reportHADAPSAR SEARCH AND TITLE S NO 256 8.PDF · uploaded 2 Sep 2022Source
Show all 136 documentsShow fewer documents

Migrated

  • 1 Declaration in FORM BFORM B AFFIDAVIT KPA.pdf · uploaded 2 Sep 2022Source
  • 1 CERSAI detailsCERSAI Search Report.pdf · uploaded 3 Sep 2022Source
  • 1 b Details of encumbrances concerned to LegalENCUMBRANCE CERTIFICATE.pdf · uploaded 16 Sep 2022Source
  • 1 Declaration about Commencement CertificateDeclaration Form D Commencement Certificate.pdf · uploaded 16 Sep 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 16 Sep 2022Source
  • 1 Copy of Layout Approval (in case of layout)Layout_compressed.pdf · uploaded 17 Sep 2022Source
  • 1 Building Plan Approval / NA Order for plotted development1st and typical floor plan_compressed.pdf · uploaded 17 Sep 2022Source
  • 2 Building Plan Approval / NA Order for plotted development4th Floor Refuge and 6th Floor Plan_compressed.pdf · uploaded 17 Sep 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentBasement_compressed.pdf · uploaded 17 Sep 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentGround Floor and Parking 1_compressed.pdf · uploaded 17 Sep 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentTerrace Floor and Section_compressed.pdf · uploaded 17 Sep 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentSection_compressed.pdf · uploaded 17 Sep 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentSection_compressed.pdf · uploaded 17 Sep 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentGround Floor and Parking 1_compressed.pdf · uploaded 17 Sep 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 17 Sep 2022Source
  • 1 a Details of encumbrances concerned to FinanceFINANCE ENCUMBRANCE CERTIFICATE.pdf · uploaded 23 Sep 2022Source
  • 1 Proforma of Allotment letterALLOTMENT LETTER FOR KUMAR PURAB 04102022 VGE - FINAL.pdf · uploaded 4 Oct 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A Declaration about separate Bank Account updated.pdf · uploaded 14 Oct 2022Source
  • 1 Deviation Report with respect to Allotment letterallotment No Deviation.pdf · uploaded 15 Oct 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)New Updated C A Certificate Purab_compressed.pdf · uploaded 19 Oct 2022Source
  • 1 Proforma of Agreement for saleKumar Purab Unit RERA.pdf · uploaded 4 Nov 2022Source
  • 1 Deviation Report with respect to model copy of AgreementKumar Purab Unit RERA Deviations.pdf · uploaded 4 Nov 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE 14 04 2023.pdf · uploaded 20 Apr 2023Source
  • 9 Building Plan Approval / NA Order for plotted development1_compressed.pdf · uploaded 14 Jul 2023Source
  • 10 Building Plan Approval / NA Order for plotted development2_compressed.pdf · uploaded 14 Jul 2023Source
  • 11 Building Plan Approval / NA Order for plotted development5_compressed.pdf · uploaded 14 Jul 2023Source
  • 12 Building Plan Approval / NA Order for plotted development7_compressed.pdf · uploaded 14 Jul 2023Source
  • 13 Building Plan Approval / NA Order for plotted development8_compressed.pdf · uploaded 14 Jul 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC_28 06 2023.pdf · uploaded 14 Jul 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Kumar Purab A3.pdf · uploaded 19 Jul 2023Source
  • 1 Disclosure of sold/ booked inventoryKumar Purab - Placida A3.PDF · uploaded 19 Jul 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Kumar Purab A3.PDF · uploaded 29 Aug 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Purab_A3_Engineer's Certificate.pdf · uploaded 11 Oct 2023Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Inventory - Purab A3.PDF · uploaded 11 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Purab A3.pdf · uploaded 12 Oct 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 3 Purab A3.PDF · uploaded 20 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Purab A3.PDF · uploaded 28 Nov 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Kumar Purab A3.PDF · uploaded 18 Jan 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Purab_A3_Engineer's Certificate.pdf · uploaded 18 Jan 2024Source
  • 3 Disclosure of sold/ booked inventorySold Unsold Inventory - Purab A3.pdf · uploaded 18 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Kumar Purab A3.pdf · uploaded 18 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Purab A3 - 2023.pdf · uploaded 20 Jan 2024Source
  • 14 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 19 Feb 2024Source
  • 15 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 19 Feb 2024Source
  • 16 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 19 Feb 2024Source
  • 17 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 19 Feb 2024Source
  • 18 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 19 Feb 2024Source
  • 19 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 19 Feb 2024Source
  • 20 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 19 Feb 2024Source
  • 21 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 19 Feb 2024Source
  • 22 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 19 Feb 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 19 Feb 2024Source
  • 2 a Details of encumbrances concerned to FinancePurab A3 - Emcumbrance - Financial.pdf · uploaded 29 Mar 2024Source
  • 2 b Details of encumbrances concerned to LegalPurab A3 - Emcumbrance - Financial.pdf · uploaded 29 Mar 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kumar Purab A3.pdf · uploaded 8 Apr 2024Source
  • 4 Disclosure of sold/ booked inventorySold Unsold - Purab A3.pdf · uploaded 8 Apr 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Kumar Purab A 3.pdf · uploaded 10 Apr 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Purab A 3.pdf · uploaded 22 Apr 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Purab A 3 - 2022-23.pdf · uploaded 22 Apr 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Kumar Purab A3 - 2023-24.pdf · uploaded 7 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - Kumar Purab A3 - 2023-24.pdf · uploaded 12 Jun 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Kumar Purab A3.pdf · uploaded 15 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kumar Purab A3.pdf · uploaded 15 Jul 2024Source
  • 5 Disclosure of sold/ booked inventorySold Unsold inventory - Kumar Purab A3.pdf · uploaded 15 Jul 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Purab A3 Bldg.PDF · uploaded 20 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kumar Periwinkle B3.pdf · uploaded 20 Oct 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kumar Purab A3.pdf · uploaded 20 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Kumar Purab A3_compressed.pdf · uploaded 22 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 K Palaash A2.PDF · uploaded 17 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 K Purab A3 Bldg.PDF · uploaded 17 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Palaash A2 Oct to Dec 2024.PDF · uploaded 17 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kumar Purab A3.PDF · uploaded 17 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Palaash A2 Engineers Certificate.pdf · uploaded 17 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Purab A3 Engineers Certificate.pdf · uploaded 17 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryKUMAR PALAASH A2.PDF · uploaded 17 Jan 2025Source
  • 2 Disclosure of sold/ booked inventoryKUMAR PURAB A-3 PLACIDA.PDF · uploaded 17 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kumar Purab A3 Bldg.PDF · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Purab A3 Engineer's Certificate.pdf · uploaded 19 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryKUMAR PURAB A3 PLACIDA.PDF · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)KPA Kumar Purab A3.pdf · uploaded 20 Apr 2025Source
  • Withdrawal Update Form 1Kumar Purab A3 Bldg.PDF · uploaded 9 Nov 2025Source
  • Withdrawal Update Form 2Purab A3 Engineeru0027s Certificate.pdf · uploaded 9 Nov 2025Source
  • Withdrawal Update Form 3Form 3_Purab A3_Sep 25_RERA Site_Signed.pdf · uploaded 9 Nov 2025Source
  • Form 5 (FY 2022-2023)Form 5 - Purab A 3 - 2022-23.pdf · uploaded 17 Nov 2025Source
  • Form 5 (FY 2023-2024)Form 5 - Kumar Purab A3 - 2023-24.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 1HP SCANJET FLOW 7500.PDF · uploaded 3 Feb 2026Source
  • Withdrawal Update Form 2Purab A3 Engineers Certificate.pdf · uploaded 3 Feb 2026Source
  • Withdrawal Update Form 3Kumar Purab A3-CA Certificate.pdf · uploaded 3 Feb 2026Source
  • Withdrawal Update Form 1Form 1 K.Purab A3 Bldg..PDF · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 2Purab A3 Engineering Certificate.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 3Form 1 K.Purab A3 Bldg..PDF · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 1KPA Form 1 Purab A3.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 2Purab A3 Engineers Certificate.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 3Kumar Purab A3 - Form 3.pdf · uploaded 22 Jul 2026Source

Technical

  • DocumentLayout_compressed.pdf · uploaded 17 Sep 2022Source
  • Document1st and typical floor plan_compressed.pdf · uploaded 17 Sep 2022Source
  • Document4th Floor Refuge and 6th Floor Plan_compressed.pdf · uploaded 17 Sep 2022Source
  • DocumentBasement_compressed.pdf · uploaded 17 Sep 2022Source
  • DocumentGround Floor and Parking 1_compressed.pdf · uploaded 17 Sep 2022Source
  • DocumentTerrace Floor and Section_compressed.pdf · uploaded 17 Sep 2022Source
  • DocumentSection_compressed.pdf · uploaded 17 Sep 2022Source
  • DocumentSection_compressed.pdf · uploaded 17 Sep 2022Source
  • DocumentGround Floor and Parking 1_compressed.pdf · uploaded 17 Sep 2022Source
  • Document1_compressed.pdf · uploaded 14 Jul 2023Source
  • Document2_compressed.pdf · uploaded 14 Jul 2023Source
  • Document5_compressed.pdf · uploaded 14 Jul 2023Source
  • Document7_compressed.pdf · uploaded 14 Jul 2023Source
  • Document8_compressed.pdf · uploaded 14 Jul 2023Source
  • Document1.pdf · uploaded 19 Feb 2024Source
  • Document2.pdf · uploaded 19 Feb 2024Source
  • Document3.pdf · uploaded 19 Feb 2024Source
  • Document4.pdf · uploaded 19 Feb 2024Source
  • Document5.pdf · uploaded 19 Feb 2024Source
  • Document6.pdf · uploaded 19 Feb 2024Source
  • Document7.pdf · uploaded 19 Feb 2024Source
  • Document8.pdf · uploaded 19 Feb 2024Source
  • Document9.pdf · uploaded 19 Feb 2024Source

Technical (Architect)

  • DocumentForm 1 Purab A3 Bldg.PDF · uploaded 20 Oct 2024Source
  • DocumentForm 1 K Palaash A2.PDF · uploaded 17 Jan 2025Source
  • DocumentForm 1 K Purab A3 Bldg.PDF · uploaded 17 Jan 2025Source
  • DocumentKumar Purab A3 Bldg.PDF · uploaded 19 Apr 2025Source
  • DocumentKPA Form 1 Purab A3.pdf · uploaded 22 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 - Kumar Periwinkle B3.pdf · uploaded 20 Oct 2024Source
  • DocumentForm 2 - Kumar Purab A3.pdf · uploaded 20 Oct 2024Source
  • DocumentPalaash A2 Engineers Certificate.pdf · uploaded 17 Jan 2025Source
  • DocumentPurab A3 Engineers Certificate.pdf · uploaded 17 Jan 2025Source
  • DocumentPurab A3 Engineer's Certificate.pdf · uploaded 19 Apr 2025Source
  • DocumentPurab A3 Engineers Certificate.pdf · uploaded 10 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsO L D S N O 2 5 6 H N O 1/1+1/2+2/1/2/2+3+4/1/4/2+5/1+5/2+6/1+6/2+6A/2 7A+7B+2/1/3+8 NEW S NO 256/1A/2/1/3 256/8

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK, Shop137 units in all
Address
Old S No 256 H No 1/1+1/2+2/1/2/2+3+4/1/4/2+5/1+5/2+6/1+6/2+6a/2 7a+7b+2/1/3+8 New S No 256/1a/2/1/3 256/8, Solapur Road, Tilekar WastiPIN 411028
Village
Hadapsar, Haveli taluka
Designated bank account
109
Developed in phases
No

Survey, CTS, gat or plot numbers

O L D S N O 2 5 6 H N O 1/1+1/2+2/1/2/2+3+4/1/4/2+5/1+5/2+6/1+6/2+6A/2 7A+7B+2/1/3+8 NEW S NO 256/1A/2/1/3 256/8

Boundaries

North
Side Amrgin And Adj Open Space
South
Side Margin And Play Ground
East
Side Margin And Adj Existing A2 Building
West
Side Margin And 12 Mt Wide Dp Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking137 units

77 of 137 units booked (56%), as the promoter reported to MahaRERA

2BHK · 112 units3BHK · 16 unitsShop · 9 units
TypeCarpet areaUnitsBooked
2BHK53.46 sq m · 575 sq ft162
2BHK55.06 sq m · 593 sq ft168
2BHK56.21 sq m · 605 sq ft1613
2BHK58.02 sq m · 625 sq ft1614
2BHK58.92 sq m · 634 sq ft4837
3BHK89.05 sq m · 959 sq ft163
Shop15.06 sq m · 162 sq ft30
Shop15.74 sq m · 169 sq ft10
Show all 12 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop20.32 sq m · 219 sq ft10
Shop21.5 sq m · 231 sq ft10
Shop28.05 sq m · 302 sq ft10
Shop28.56 sq m · 307 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnish Avinash Nawathe—
Chartered accountantSupriya Abhijit Mundada—
EngineerAkshay Jagtap—
EngineerMr Abhijeet Shekar—

Source: MahaRERA project page. Contact details are not shown.

Kumar Purab A3 Building in numbers

Registered deals, summarised

Deedo has 7 registered documents at Kumar Purab A3 Building, from Jan 2026 to Sep 2026: 7 sales. The median registered sale works out to about ₹12,100 per sq ft, at a median of ₹70 L a deal; 0% of sales were resales.

What is the price per sq ft at Kumar Purab A3 Building?
The median registered sale works out to about ₹12,100 per sq ft, at a median of ₹70 L a deal; 0% of sales were resales.
How many properties have been sold at Kumar Purab A3 Building?
7 sales are registered at Kumar Purab A3 Building.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Kumar Purab A3 Building by Deedo, last updated with deals registered in Sep 2026.

Latest deal · Primary sale · Sep 2026

₹1–1.5 Cr

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Methodology