Samaira Tower
Deedo IDDP-PUN-4QMQIt is due for completion in Nov 2027, with no extension on record; no MahaRERA orders on record; 10% of its units are booked.
Ghorapade Peth, Pune 411042 · by Prathamesh Constro Realty Llp
Buying a flat here?
See every deed registered on it.
It is due for completion in Nov 2027, with no extension on record
- This projectRegistered 24 Feb 2023, completion promised 30 Nov 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100049736
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100049736 | 24 Feb 2023 | 30 Nov 2027 | 30 Nov 2027 | Prathamesh Constro Realty LLp | Project page |
Documents143
2 documents held by Deedo, 141 filings listed on MahaRERA's project page
Finance
- PAN CardPAN COMPANY.pdf · uploaded 3 Jan 2023Source
Legal
Show all 143 documentsShow fewer documents
Migrated
- 1 b Details of encumbrances concerned to LegalScan 12.pdf · uploaded 3 Jan 2023Source
- 1 Copy of Layout Approval (in case of layout)LYOUT_compressed.pdf · uploaded 3 Jan 2023Source
- 1 Building Plan Approval / NA Order for plotted development2_compressed.pdf · uploaded 3 Jan 2023Source
- 2 Building Plan Approval / NA Order for plotted development3_compressed.pdf · uploaded 3 Jan 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Cert compressed.pdf · uploaded 3 Jan 2023Source
- 1 Declaration about Commencement Certificate4_compressed.pdf · uploaded 24 Jan 2023Source
- 2 Declaration about Commencement Certificate5_compressed.pdf · uploaded 24 Jan 2023Source
- 1 Declaration in FORM BB form builder.pdf · uploaded 24 Jan 2023Source
- 3 Declaration about Commencement Certificated form.pdf · uploaded 25 Jan 2023Source
- 1 CERSAI detailsrepeort Cercai.pdf · uploaded 27 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSEPRATE ACCOUNT.pdf · uploaded 1 Feb 2023Source
- 2 a Details of encumbrances concerned to Financelegal encumbrance .pdf · uploaded 3 Feb 2023Source
- 2 b Details of encumbrances concerned to Legallegal encumbrance .pdf · uploaded 3 Feb 2023Source
- 1 Proforma of Allotment letterALLOTMENT LETTER UPDATED.pdf · uploaded 3 Feb 2023Source
- 1 Deviation Report with respect to Allotment letterDEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf · uploaded 3 Feb 2023Source
- 1 Copy of the legal title reporttitle rera Samira final_compressed.pdf · uploaded 6 Feb 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsSakhare disclusure.pdf · uploaded 6 Feb 2023Source
- 4 Declaration about Commencement CertificateLAYOUT PLAN 103A_compressed.pdf · uploaded 7 Feb 2023Source
- 2 Disclosure of Interest in Other Real Estate Organizationsamble.pdf · uploaded 7 Feb 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsThite.pdf · uploaded 7 Feb 2023Source
- 1 Proforma of Agreement for saleSamaira Draft Agreement FINAL.pdf · uploaded 7 Feb 2023Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION MODEL AGREEMENT final.pdf · uploaded 7 Feb 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca certificate Samira.PDF · uploaded 19 Feb 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)archir.pdf · uploaded 29 Aug 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engeen.pdf · uploaded 29 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)quality assurance.pdf · uploaded 13 Sep 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)charter form 3.pdf · uploaded 13 Sep 2023Source
- 2 Proforma of Agreement for saleSamaira Draft Agreement 2023.pdf · uploaded 7 Dec 2023Source
- 1 Foreclosure of the Projectupdation.pdf · uploaded 7 Dec 2023Source
- 2 Deviation Report with respect to model copy of AgreementDEVIATION MODEL COPY OF AGREEMENT 2023.pdf · uploaded 7 Dec 2023Source
- 2 Copy of Layout Approval (in case of layout)annexure sub division_compressed.pdf · uploaded 4 Mar 2024Source
- 3 Proforma of Agreement for saleSamaira Draft Agreement.pdf · uploaded 4 Mar 2024Source
- 3 Deviation Report with respect to model copy of AgreementDEVIATION MODEL agreement clause A b and Shedule 1.pdf · uploaded 4 Mar 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 21 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentbasement.pdf · uploaded 21 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentLayout.pdf · uploaded 21 Oct 2024Source
- 3 Declaration about Commencement Certificateparking.pdf · uploaded 21 Oct 2024Source
- 6 Declaration about Commencement Certificatefeefteen and top.pdf · uploaded 21 Oct 2024Source
- 5 Declaration about Commencement Certificatefloor thereen and fourteen.pdf · uploaded 21 Oct 2024Source
- 4 Declaration about Commencement Certificateodd floor.pdf · uploaded 21 Oct 2024Source
- 2 Declaration about Commencement Certificateelevation.pdf · uploaded 21 Oct 2024Source
- 1 Declaration about Commencement Certificateelevatio1.pdf · uploaded 21 Oct 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)architecht.pdf · uploaded 25 Nov 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)engee form2.pdf · uploaded 25 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2 A engee.pdf · uploaded 25 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_01-07-2023.pdf · uploaded 30 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_01-04-2023.pdf · uploaded 30 Jan 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_01-01-2025.pdf · uploaded 30 Jan 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_22-11-2024.pdf · uploaded 30 Jan 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_01-07-2024.pdf · uploaded 30 Jan 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_01-04-2024.pdf · uploaded 30 Jan 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_01-01-2024.pdf · uploaded 30 Jan 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_01-10-2023.pdf · uploaded 30 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 QPR Sept 2023.pdf · uploaded 30 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 QPR Dec 2023.pdf · uploaded 30 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 QPR March 2024.pdf · uploaded 30 Jan 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 QPR June 2024.pdf · uploaded 30 Jan 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31-12-2024.pdf · uploaded 30 Jan 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-09-2024.pdf · uploaded 30 Jan 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-07-2024.pdf · uploaded 30 Jan 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-04-2024.pdf · uploaded 30 Jan 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-10-2023.pdf · uploaded 30 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 19-08-2023.pdf · uploaded 30 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-04-2023.pdf · uploaded 30 Jan 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-01-2024.pdf · uploaded 30 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023-24.pdf · uploaded 30 Jan 2025Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report- Model AFS.pdf · uploaded 3 Feb 2025Source
- 1 Proforma of Agreement for saleModel Proforma of Agreement to Sale.pdf · uploaded 3 Feb 2025Source
- 2 Proforma of Agreement for saleModel Proforma of Agreement to Sale.pdf · uploaded 4 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_ till 30 Sept 2024.PDF · uploaded 25 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_ till 31 Dec 2024.PDF · uploaded 25 Feb 2025Source
- 1 Declaration in FORM BForm B - Affidavit cum Declaration.pdf · uploaded 4 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - 2022-23.pdf · uploaded 4 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - 2023-24.pdf · uploaded 4 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 till 31-03-2023.pdf · uploaded 13 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 _ 2022-23.pdf · uploaded 13 Mar 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold _ March 2024.pdf · uploaded 17 Mar 2025Source
- 2 Disclosure of sold/ booked inventorySold Unsold _ June 2024.pdf · uploaded 17 Mar 2025Source
- 3 Disclosure of sold/ booked inventorySold Unsold _ Sept 2024.pdf · uploaded 17 Mar 2025Source
- 4 Disclosure of sold/ booked inventorySold Unsold _ Dec 2024.pdf · uploaded 17 Mar 2025Source
- 1 Copy of Layout Approval (in case of layout)Revised Layout Plan.pdf · uploaded 20 Jun 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4.pdf · uploaded 20 Jun 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q4.pdf · uploaded 20 Jun 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4.pdf · uploaded 20 Jun 2025Source
- Form 1Form 1.pdf · uploaded 10 Jun 2026Source
- Form 1Form 1 .pdf · uploaded 10 Jun 2026Source
- Form 2Form 2.pdf · uploaded 10 Jun 2026Source
- Form 2Form 2 .pdf · uploaded 10 Jun 2026Source
- Form 3Form 3 june 2025 (1) .pdf · uploaded 10 Jun 2026Source
- Form 3Form 3 .pdf · uploaded 10 Jun 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of sold unsold inventory june 2025 .pdf · uploaded 10 Jun 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of sold unsold inventory Dec 2025 .pdf · uploaded 10 Jun 2026Source
- Form 1Form 1 .pdf · uploaded 12 Jun 2026Source
- Form 1Form 1 .pdf · uploaded 12 Jun 2026Source
- Form 2Form 2 .pdf · uploaded 12 Jun 2026Source
- Form 2Form 2 .pdf · uploaded 12 Jun 2026Source
- Form 3Form 3 .pdf · uploaded 12 Jun 2026Source
- Form 3Form 3 .pdf · uploaded 12 Jun 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of sold unsold inventory Sep 2025 .pdf · uploaded 12 Jun 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of sold unsold inventory .pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2024-2025)Form 2A 31-03-2025.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2025-2026)Form 2A 2025-2026 .pdf · uploaded 12 Jun 2026Source
- Form 5 (FY 2024-2025)Form 5 2024-2025 .pdf · uploaded 15 Jul 2026Source
- Withdrawal Update Form 1FORM 1 COMPRESS .pdf · uploaded 6 Aug 2026Source
- Withdrawal Update Form 2FORM 2 Compress .pdf · uploaded 6 Aug 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 6 Aug 2026Source
Technical
- DocumentLYOUT_compressed.pdf · uploaded 3 Jan 2023Source
- Document2_compressed.pdf · uploaded 3 Jan 2023Source
- Document3_compressed.pdf · uploaded 3 Jan 2023Source
- Documentannexure sub division_compressed.pdf · uploaded 4 Mar 2024Source
- Documentbasement.pdf · uploaded 21 Oct 2024Source
- DocumentLayout.pdf · uploaded 21 Oct 2024Source
- DocumentRevised Layout Plan.pdf · uploaded 20 Jun 2025Source
Technical (Architect)
- Documentarchitecht.pdf · uploaded 25 Nov 2024Source
- DocumentForm 1_01-04-2023.pdf · uploaded 30 Jan 2025Source
- DocumentForm 1_01-07-2023.pdf · uploaded 30 Jan 2025Source
- DocumentForm 1_01-10-2023.pdf · uploaded 30 Jan 2025Source
- DocumentForm 1_01-01-2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 1_01-04-2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 1_01-07-2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 1_22-11-2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 1_01-01-2025.pdf · uploaded 30 Jan 2025Source
- DocumentForm 1 Q4.pdf · uploaded 20 Jun 2025Source
- DocumentFORM 1 COMPRESS .pdf · uploaded 5 Aug 2026Source
Technical (Engineer)
- Documentengee form2.pdf · uploaded 25 Nov 2024Source
- DocumentForm 2 01-04-2023.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 19-08-2023.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 01-10-2023.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 01-01-2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 01-04-2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 01-07-2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 30-09-2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 31-12-2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 Q4.pdf · uploaded 20 Jun 2025Source
- DocumentFORM 2 Compress .pdf · uploaded 5 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Final Plot No 103 A CTS 674 Gorpade Peth
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK, 4BHK, Office space, Shop107 units in all
- Address
- Final Plot No 103 A CTS 674 Gorpade Peth, Ghorpade Peth, Ghorpade PethPIN 411042
- Village
- Pune (M Corp.), Pune City taluka
- Location
- 18.50002, 73.86517
- Land area for this project
- 1,400 sq m (15,069 sq ft)
- Permissible built-up area
- 8,787 sq m (94,584 sq ft)
- Sanctioned built-up area
- 8,749 sq m (94,178 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 21
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Final Plot No 103 A CTS 674 Gorpade Peth
Boundaries
- North
- road
- South
- remainig Part of F P No 103
- East
- road
- West
- PCM lane
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking107 units
11 of 107 units booked (10%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 33.58 sq m · 361 sq ft | 1 | 0 |
| 1BHK | 42.16 sq m · 454 sq ft | 7 | 0 |
| 1BHK | 57.11 sq m · 615 sq ft | 2 | 1 |
| 2BHK | 43.72 sq m · 471 sq ft | 2 | 0 |
| 2BHK | 48.46 sq m · 522 sq ft | 1 | 0 |
| 2BHK | 54.68 sq m · 589 sq ft | 17 | 2 |
| 2BHK | 57.03 sq m · 614 sq ft | 5 | 0 |
| 2BHK | 57.11 sq m · 615 sq ft | 11 | 0 |
Show all 44 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 58.25 sq m · 627 sq ft | 6 | 1 |
| 2BHK | 59.84 sq m · 644 sq ft | 13 | 5 |
| 3BHK | 81.89 sq m · 881 sq ft | 7 | 0 |
| 3BHK | 101.67 sq m · 1,094 sq ft | 1 | 0 |
| 3BHK | 104.32 sq m · 1,123 sq ft | 1 | 0 |
| 3BHK | 111.92 sq m · 1,205 sq ft | 1 | 0 |
| 4BHK | 149.27 sq m · 1,607 sq ft | 1 | 0 |
| Office space | 14.79 sq m · 159 sq ft | 1 | 0 |
| Office space | 18.45 sq m · 199 sq ft | 1 | 0 |
| Office space | 49.92 sq m · 537 sq ft | 1 | 0 |
| Office space | 60.93 sq m · 656 sq ft | 1 | 0 |
| Office space | 71.86 sq m · 773 sq ft | 1 | 0 |
| Office space | 84.6 sq m · 911 sq ft | 1 | 0 |
| Office space | 97.05 sq m · 1,045 sq ft | 1 | 0 |
| Shop | 17.23 sq m · 185 sq ft | 1 | 0 |
| Shop | 17.54 sq m · 189 sq ft | 1 | 0 |
| Shop | 20.17 sq m · 217 sq ft | 1 | 0 |
| Shop | 20.59 sq m · 222 sq ft | 1 | 0 |
| Shop | 22.24 sq m · 239 sq ft | 2 | 0 |
| Shop | 22.71 sq m · 244 sq ft | 1 | 0 |
| Shop | 23.33 sq m · 251 sq ft | 1 | 0 |
| Shop | 23.47 sq m · 253 sq ft | 2 | 2 |
| Shop | 24.95 sq m · 269 sq ft | 1 | 0 |
| Shop | 25.61 sq m · 276 sq ft | 1 | 0 |
| Shop | 26.5 sq m · 285 sq ft | 1 | 0 |
| Shop | 30.33 sq m · 326 sq ft | 1 | 0 |
| Shop | 30.59 sq m · 329 sq ft | 1 | 0 |
| Shop | 30.78 sq m · 331 sq ft | 1 | 0 |
| Shop | 35.61 sq m · 383 sq ft | 1 | 0 |
| Shop | 37.47 sq m · 403 sq ft | 1 | 0 |
| Shop | 38.45 sq m · 414 sq ft | 1 | 0 |
| Shop | 39.98 sq m · 430 sq ft | 1 | 0 |
| Shop | 40.08 sq m · 431 sq ft | 1 | 0 |
| Shop | 40.13 sq m · 432 sq ft | 1 | 0 |
| Shop | 41.4 sq m · 446 sq ft | 1 | 0 |
| Shop | 46.35 sq m · 499 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Malvadkar Architecht | — |
| Chartered accountant | PSBC and Associates | — |
| Engineer | Sarfaraz Mushtafa Khan | — |
Source: MahaRERA project page. Contact details are not shown.