Durga Vihar
Completion was pushed back 4 months, to Oct 2026; no MahaRERA orders on record; 45% of its units are booked.
Dhankawadi, Pune 411043 · Property rates in Dhankawadi · Promoter: Satkar Reality
Completion was pushed back 4 months, to Oct 2026
- This projectRegistered 26 Dec 2022, completion promised 30 Jun 2026, revised to 30 Oct 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100048316
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100048316 | 26 Dec 2022 | 30 Jun 2026 | 30 Oct 2026 | Satkar Reality | Project page |
Documents156
2 documents held by Deedo, 154 filings listed on MahaRERA's project page
Finance
Legal
- Legal Title reportLegal title Report_compressed.pdf · uploaded 4 Nov 2022Source
- Declaration Form BForm B - Promoter.pdf · uploaded 4 Nov 2022Source
- Others1 Declaration about Commencement Certificate.pdf · uploaded 15 Jul 2025Source
- Declaration Form BTITLE SEARCH REPORT DHANKAWADI PLOT NO 15 AND 19_compressed.pdf · uploaded 1 Sep 2025Source
Show all 156 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardPAN Firm.pdf · uploaded 29 Oct 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 29 Oct 2022Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan_compressed.pdf · uploaded 31 Oct 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan_compressed.pdf · uploaded 31 Oct 2022Source
- 1 Copy of the legal title reportLegal title Report_compressed.pdf · uploaded 4 Nov 2022Source
- 1 Declaration about Commencement CertificateDeclaration about C C.pdf · uploaded 4 Nov 2022Source
- 1 Declaration in FORM BForm B - Promoter.pdf · uploaded 4 Nov 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200251189067_For_Asset_Based_Search_02_11_2022_16_14_45_718.pdf · uploaded 4 Nov 2022Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 4 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of Seperate Bank Account.pdf · uploaded 4 Nov 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation report with Respect to allotmnet Letter.pdf · uploaded 4 Nov 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3.pdf · uploaded 14 Nov 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)DECLARATION Regarding unsecured Loan.pdf · uploaded 25 Nov 2022Source
- 1 Proforma of Agreement for saleAgreement For Sale - SATKAR REALITY.pdf · uploaded 1 Dec 2022Source
- 1 a Details of encumbrances concerned to FinanceNo Encumbrance Letter - Finance.pdf · uploaded 2 Dec 2022Source
- 2 a Details of encumbrances concerned to FinanceNo Encumbrance Letter - Legal.pdf · uploaded 2 Dec 2022Source
- 3 a Details of encumbrances concerned to FinanceDeclaration - Legal dispute and litigation.pdf · uploaded 2 Dec 2022Source
- 1 b Details of encumbrances concerned to LegalNo Encumbrance Letter - Finance.pdf · uploaded 2 Dec 2022Source
- 2 b Details of encumbrances concerned to LegalNo Encumbrance Letter - Legal.pdf · uploaded 2 Dec 2022Source
- 3 b Details of encumbrances concerned to LegalDeclaration - Legal dispute and litigation.pdf · uploaded 2 Dec 2022Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report Afs.pdf · uploaded 2 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Satkar Reality Annexture-f_Form-5 with Sign_compressed.pdf · uploaded 16 Sep 2023Source
- 2 Copy of Layout Approval (in case of layout)Approava;.pdf · uploaded 19 Oct 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentBuild.pdf · uploaded 19 Oct 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentBuild (2).pdf · uploaded 19 Oct 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 19 Oct 2023Source
- 1 Copy of Layout Approval (in case of layout)HPSC0781_compressed.pdf · uploaded 22 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 22 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentHPSC0782.pdf · uploaded 22 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentHPSC0783_compressed.pdf · uploaded 22 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSC0784_compressed.pdf · uploaded 22 Nov 2024Source
- 1 Declaration about Commencement CertificateRERA DECLARATION (2).pdf · uploaded 22 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Durga Vihar F1 Dec 2022.pdf · uploaded 13 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Durga Vihar F1 Mar 2023.pdf · uploaded 13 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Durga Vihar F1 Jun 2023.pdf · uploaded 13 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Durga Vihar F1 Sep 2023.pdf · uploaded 13 Feb 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Durga Vihar F1 Dec 2023.pdf · uploaded 13 Feb 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Durga Vihar F1 Mar 2024.pdf · uploaded 13 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)3) Form 3_ Satkar Reality_June 23_11zon.pdf · uploaded 13 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)5) Form 3_ Satkar Reality_December 23_11zon.pdf · uploaded 13 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)4) Form 3_ Satkar Reality_SEP 23_11zon.pdf · uploaded 13 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)2) Form 3_ Satkar Reality_March 23_11zon.pdf · uploaded 13 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1) Form 3_ Satkar Reality_December 22_11zon.pdf · uploaded 13 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3) Form 2_Satkar Reality_June 23.pdf · uploaded 13 Feb 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)9) Form 2_Satkar Reality_DEC 24_11zon.pdf · uploaded 13 Feb 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8) Form 2_Satkar Reality_Sep 24_11zon.pdf · uploaded 13 Feb 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7) Form 2_Satkar Reality_June 24_11zon.pdf · uploaded 13 Feb 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6) Form 2_Satkar Reality_March 24_11zon.pdf · uploaded 13 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4) Form 2_Satkar Reality_SEP 23.pdf · uploaded 13 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2) Form 2_Satkar Reality_March 23.pdf · uploaded 13 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1) Form 2_Satkar Reality_DEC 22.pdf · uploaded 13 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5) Form 2_Satkar Reality_DEC 23.pdf · uploaded 13 Feb 2025Source
- 3 Disclosure of sold/ booked inventory3) Sold Disclosure SEP 23.pdf · uploaded 13 Feb 2025Source
- 8 Disclosure of sold/ booked inventory8) Sold Disclosure DEC 24.pdf · uploaded 13 Feb 2025Source
- 7 Disclosure of sold/ booked inventory7) Sold Disclosure SEP 24.pdf · uploaded 13 Feb 2025Source
- 6 Disclosure of sold/ booked inventory6) Sold Disclosure June 24.pdf · uploaded 13 Feb 2025Source
- 5 Disclosure of sold/ booked inventory5) Sold Disclosure March 24.pdf · uploaded 13 Feb 2025Source
- 4 Disclosure of sold/ booked inventory4) Sold Disclosure DEC 23.pdf · uploaded 13 Feb 2025Source
- 2 Disclosure of sold/ booked inventory2) Sold Disclosure June 23.pdf · uploaded 13 Feb 2025Source
- 1 Disclosure of sold/ booked inventory1) Sold Disclosure March 23.pdf · uploaded 13 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Durga Vihar Form 5 FY 23-24.pdf · uploaded 13 Feb 2025Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Satkar Reality F3 Dec 2024.pdf · uploaded 14 Feb 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Satkar Reality F3 Sep 2024.pdf · uploaded 14 Feb 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Satkar Reality F3 Jun 2024.pdf · uploaded 14 Feb 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Satkar Reality F3 Mar 2024.pdf · uploaded 14 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Satkar Reality F3 Sep 2023.pdf · uploaded 14 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A March 23.pdf · uploaded 15 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A March 24.pdf · uploaded 15 Feb 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Satkar Realty_June 24.pdf · uploaded 20 Feb 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Satkar Realty_Sep 24.pdf · uploaded 20 Feb 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Satkar Realty_DEC 24.pdf · uploaded 20 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)HPSC0803-1_compressed.pdf · uploaded 5 Mar 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentHPSC0804-2_compressed.pdf · uploaded 5 Mar 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentHPSC0805-3_compressed.pdf · uploaded 5 Mar 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSC0807-4_compressed.pdf · uploaded 5 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Satkar reality form 3.pdf · uploaded 9 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryGetUserDocumentFileContent (10).pdf · uploaded 11 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 March 25.pdf · uploaded 13 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rera Form 3 Final.pdf · uploaded 13 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 March 25.pdf · uploaded 13 May 2025Source
- 1 Disclosure of sold/ booked inventorySold disclouser.pdf · uploaded 13 May 2025Source
- Form 1form 1 dec 2022.pdf · uploaded 27 May 2025Source
- Form 1form 1 march 2023.pdf · uploaded 27 May 2025Source
- Form 2form 2 dec 22.pdf · uploaded 27 May 2025Source
- Form 2form 2 mar 23.pdf · uploaded 27 May 2025Source
- Form 3form 3 dec 22.pdf · uploaded 27 May 2025Source
- Form 3form 3 march 23.pdf · uploaded 27 May 2025Source
- Disclosure of Sold and Booked InventorySold disclouser mar 23.pdf · uploaded 27 May 2025Source
- Form 1Durga Vihar F1 Jun 2023.pdf · uploaded 30 May 2025Source
- Form 1Durga Vihar F1 Sep 2023.pdf · uploaded 30 May 2025Source
- Form 1Durga Vihar F1 Dec 2023.pdf · uploaded 30 May 2025Source
- Form 1Durga Vihar F1 Mar 2024.pdf · uploaded 30 May 2025Source
- Form 1Form 1_Satkar Realty_June 24.pdf · uploaded 30 May 2025Source
- Form 1Form 1_Satkar Realty_Sep 24.pdf · uploaded 30 May 2025Source
- Form 1Form 1_Satkar Realty_DEC 24.pdf · uploaded 30 May 2025Source
- Form 1Satkar Reality Form 1_March 2025.pdf · uploaded 30 May 2025Source
- Form 5 (FY 2024-2025)Satkar Form 5_FY 2024-25.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1FORM 1_Satkar Realty_SEPT 25.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1FORM 1_Satkar Realty_JUNE 25.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2Form 2_Satkar Realty_Sep 25.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2Form 2_Satkar Reality_June 25_.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3Form 3_Satkar Realty_Sep 25_compressed.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3Form 3_Satkar Realty_June 25_.pdf · uploaded 18 Oct 2025Source
- Form 2A (FY 2022-2023)Form 2A 22-23.pdf · uploaded 24 Oct 2025Source
- Form 2A (FY 2023-2024)Form 2A 23-24.pdf · uploaded 24 Oct 2025Source
- Form 2A (FY 2024-2025)Form 2A 24-25.pdf · uploaded 27 Oct 2025Source
- Withdrawal Update Form 1Durga Vihar Architect s certificate.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Durga Vihar Engineers Certificate.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Form 3 Durga Final Dec 25.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Form 1 _durga vihar_mar 26.pdf · uploaded 22 Apr 2026Source
- Withdrawal Update Form 2FORM2 _durga vihar _mar 26.pdf · uploaded 22 Apr 2026Source
- Withdrawal Update Form 3Form 3 _durga vihar_mar 26.pdf · uploaded 22 Apr 2026Source
Technical
- DocumentLayout Plan_compressed.pdf · uploaded 31 Oct 2022Source
- DocumentBuilding Plan_compressed.pdf · uploaded 31 Oct 2022Source
- DocumentApproava;.pdf · uploaded 19 Oct 2023Source
- DocumentBuild.pdf · uploaded 19 Oct 2023Source
- DocumentBuild (2).pdf · uploaded 19 Oct 2023Source
- DocumentHPSC0781_compressed.pdf · uploaded 22 Nov 2024Source
- DocumentHPSC0782.pdf · uploaded 22 Nov 2024Source
- DocumentHPSC0783_compressed.pdf · uploaded 22 Nov 2024Source
- DocumentHPSC0784_compressed.pdf · uploaded 22 Nov 2024Source
- DocumentHPSC0803-1_compressed.pdf · uploaded 5 Mar 2025Source
- DocumentHPSC0804-2_compressed.pdf · uploaded 5 Mar 2025Source
- DocumentHPSC0805-3_compressed.pdf · uploaded 5 Mar 2025Source
- DocumentHPSC0807-4_compressed.pdf · uploaded 5 Mar 2025Source
Technical (Architect)
- DocumentDurga Vihar F1 Mar 2023.pdf · uploaded 13 Feb 2025Source
- DocumentDurga Vihar F1 Jun 2023.pdf · uploaded 13 Feb 2025Source
- DocumentDurga Vihar F1 Sep 2023.pdf · uploaded 13 Feb 2025Source
- DocumentDurga Vihar F1 Dec 2023.pdf · uploaded 13 Feb 2025Source
- DocumentDurga Vihar F1 Mar 2024.pdf · uploaded 13 Feb 2025Source
- DocumentForm 1_Satkar Realty_June 24.pdf · uploaded 20 Feb 2025Source
- DocumentForm 1_Satkar Realty_Sep 24.pdf · uploaded 20 Feb 2025Source
- DocumentForm 1_Satkar Realty_DEC 24.pdf · uploaded 20 Feb 2025Source
- DocumentFORM 1 March 25.pdf · uploaded 13 May 2025Source
- DocumentForm 1 _durga vihar_mar 26.pdf · uploaded 20 Apr 2026Source
Technical (Engineer)
- Document2) Form 2_Satkar Reality_March 23.pdf · uploaded 13 Feb 2025Source
- Document3) Form 2_Satkar Reality_June 23.pdf · uploaded 13 Feb 2025Source
- Document4) Form 2_Satkar Reality_SEP 23.pdf · uploaded 13 Feb 2025Source
- Document5) Form 2_Satkar Reality_DEC 23.pdf · uploaded 13 Feb 2025Source
- Document6) Form 2_Satkar Reality_March 24_11zon.pdf · uploaded 13 Feb 2025Source
- Document7) Form 2_Satkar Reality_June 24_11zon.pdf · uploaded 13 Feb 2025Source
- Document8) Form 2_Satkar Reality_Sep 24_11zon.pdf · uploaded 13 Feb 2025Source
- Document9) Form 2_Satkar Reality_DEC 24_11zon.pdf · uploaded 13 Feb 2025Source
- DocumentFORM 2 March 25.pdf · uploaded 13 May 2025Source
- DocumentFORM2 _durga vihar _mar 26.pdf · uploaded 20 Apr 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsCTS NO. S. NO.8/2A/3, Plot No. 15+ 19
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK38 units in all
- Address
- CTS NO. S. NO.8/2A/3, Plot No. 19, Dhankawadi, Dhankawadi, DhankawadiPIN 411043
- Village
- Dhankawadi, Haveli taluka
- Location
- 18.46942, 73.86023
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- Plot No 18
- South
- Shree Thakurs Property
- East
- Plot No 15
- West
- 30 Ft Colony Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking38 units
17 of 38 units booked (45%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Durga Vihar Wing A | 2BHK | 56.5 sq m · 608 sq ft | 5 | 3 |
| Durga Vihar Wing A | 2BHK | 68.3 sq m · 735 sq ft | 10 | 8 |
| Durga Vihar Wing A | 3BHK | 77.41 sq m · 833 sq ft | 5 | 4 |
| Durga Vihar Wing B | 2BHK | 54.19 sq m · 583 sq ft | 6 | 0 |
| Durga Vihar Wing B | 2BHK | 60.56 sq m · 652 sq ft | 6 | 1 |
| Durga Vihar Wing B | 2BHK | 94.57 sq m · 1,018 sq ft | 6 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Rajendra H Thite | — |
| Architect | Shailesh Salehittal Architect | — |
| Chartered accountant | Bogati & Co | — |
| Engineer | Anand Shindekar | — |
Source: MahaRERA project page. Contact details are not shown.