Residential / Group Housing · 1 building · 54 unitsRERA P52100046100

New Era

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 17% of its units are booked.

Chikhali, Pune 411062 · Property rates in Chikhali · Promoter: Mahalaxmi Infraestate

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales17% booked9 of 54 units · as the promoter reported to MahaRERAPrice₹7,200 /sq ft8.6% above Chikhali · 21 registered sales
New Era project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 20 Jun 2022, completion promised 31 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 23 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Sep 2026New Era · 1002Primary sale429 sq ftView Primary sale, Sep 2026
Aug 2026New Era · 1305Primary sale627 sq ftView Primary sale, Aug 2026
Aug 2026New Era · 906Primary sale408 sq ftView Primary sale, Aug 2026
Jul 2026New Era · 1205Primary sale627 sq ftView Primary sale, Jul 2026
May 2026New Era · 907Primary sale606 sq ftView Primary sale, May 2026
May 2026New Era · 1106Mortgage408 sq ftView Mortgage, May 2026
May 2026New Era · 1302Primary sale429 sq ftView Primary sale, May 2026
May 2026New Era · 1106Primary sale408 sq ftView Primary sale, May 2026
Apr 2026New Era · 1104Primary sale639 sq ftView Primary sale, Apr 2026
Apr 2026New Era · 1306Primary sale408 sq ftView Primary sale, Apr 2026

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100046100
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004610020 Jun 202231 Dec 202630 Apr 2027Mahalaxmi InfraestateProject page
Documents129

1 document held by Deedo, 128 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card1 PAN of Firm.pdf · uploaded 13 Jun 2022Source

Legal

  • Legal Title report3 Format A Advocate Certificate.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportProperty Purchase Mangesh_compressed_compressed-1-9.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportProperty Purchase Mangesh_compressed_compressed-10-19.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportProperty Purchase Mangesh_compressed_compressed-20-28.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportProperty Purchase Mangesh_compressed_compressed-29-39.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportProperty Purchase Mangesh_compressed_compressed-40-50.pdf · uploaded 13 Jun 2022Source
Show all 129 documentsShow fewer documents

Legal

  • Legal Title reportProperty Purchase Mangesh_compressed_compressed-51-58.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportProperty Purschase Yashodhan_compressed_compressed-1-10.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportProperty Purschase Yashodhan_compressed_compressed-11-19.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportProperty Purschase Yashodhan_compressed_compressed-20-30.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportProperty Purschase Yashodhan_compressed_compressed-31-34.pdf · uploaded 13 Jun 2022Source
  • Declaration Form B8 Declaration Form B_compressed.pdf · uploaded 13 Jun 2022Source
  • Legal Title reportMI SEARCH TITLE REPORT OCT 2023.pdf · uploaded 25 Oct 2023Source
  • Other – LegalMahalaxmi Declaration.pdf · uploaded 7 Oct 2024Source
  • Other – LegalMahalaxmi Declaration.pdf · uploaded 7 Oct 2024Source

Migrated

  • 1 PAN Card1 PAN of Firm.pdf · uploaded 13 Jun 2022Source
  • 1 Copy of the legal title report3 Format A Advocate Certificate.pdf · uploaded 13 Jun 2022Source
  • 2 Copy of the legal title reportProperty Purchase Mangesh_compressed_compressed-1-9.pdf · uploaded 13 Jun 2022Source
  • 3 Copy of the legal title reportProperty Purchase Mangesh_compressed_compressed-10-19.pdf · uploaded 13 Jun 2022Source
  • 4 Copy of the legal title reportProperty Purchase Mangesh_compressed_compressed-20-28.pdf · uploaded 13 Jun 2022Source
  • 5 Copy of the legal title reportProperty Purchase Mangesh_compressed_compressed-29-39.pdf · uploaded 13 Jun 2022Source
  • 6 Copy of the legal title reportProperty Purchase Mangesh_compressed_compressed-40-50.pdf · uploaded 13 Jun 2022Source
  • 7 Copy of the legal title reportProperty Purchase Mangesh_compressed_compressed-51-58.pdf · uploaded 13 Jun 2022Source
  • 8 Copy of the legal title reportProperty Purschase Yashodhan_compressed_compressed-1-10.pdf · uploaded 13 Jun 2022Source
  • 9 Copy of the legal title reportProperty Purschase Yashodhan_compressed_compressed-11-19.pdf · uploaded 13 Jun 2022Source
  • 10 Copy of the legal title reportProperty Purschase Yashodhan_compressed_compressed-20-30.pdf · uploaded 13 Jun 2022Source
  • 11 Copy of the legal title reportProperty Purschase Yashodhan_compressed_compressed-31-34.pdf · uploaded 13 Jun 2022Source
  • 1 Details of encumbrances4 DETAILS OF ENCUMBRANCE.pdf · uploaded 13 Jun 2022Source
  • 1 Copy of Layout Approval (in case of layout)6 Commencement Certificate.pdf · uploaded 13 Jun 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentApproved Plan 1-5.pdf · uploaded 13 Jun 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentApproved Plan 2-5.pdf · uploaded 13 Jun 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentApproved Plan 3-5.pdf · uploaded 13 Jun 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentApproved Plan 4-5.pdf · uploaded 13 Jun 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentApproved Plan 5-5.pdf · uploaded 13 Jun 2022Source
  • 1 Commencement Certificates / NA Order for plotted development6 Commencement Certificate.pdf · uploaded 13 Jun 2022Source
  • 1 Declaration about Commencement Certificate7 Form D Declaration of Commencement.pdf · uploaded 13 Jun 2022Source
  • 1 Declaration in FORM B8 Declaration Form B_compressed.pdf · uploaded 13 Jun 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)9 Form 1_compressed.pdf · uploaded 13 Jun 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 13 Jun 2022Source
  • 1 Proforma of Allotment letter12 Allotment Letter.pdf · uploaded 13 Jun 2022Source
  • 2 Proforma of Allotment letter13 Agreement to Sale_compressed-1-40.pdf · uploaded 13 Jun 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 14 Jun 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed_compressed.pdf · uploaded 14 Jun 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA FORM 5 MAHALAXMI INFRAESTATE F Y 22-23.pdf · uploaded 30 Sep 2023Source
  • 12 Copy of the legal title reportMI SEARCH TITLE REPORT OCT 2023.pdf · uploaded 25 Oct 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)MI FORM 1 MAR 2023.pdf · uploaded 25 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)MI FORM 2 MAR 2023.pdf · uploaded 25 Oct 2023Source
  • 1 Disclosure of sold/ booked inventoryInventory Mar 2023.pdf · uploaded 26 Oct 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MAR 2023_compressed.pdf · uploaded 26 Oct 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 MAHALAXMI INFRA.pdf · uploaded 12 Dec 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 MAHALAXMI INFRA.pdf · uploaded 12 Dec 2023Source
  • 2 Disclosure of sold/ booked inventoryINVENTORY MAHALAXMI INFRA.pdf · uploaded 12 Dec 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MAHALAXMI INFRA.pdf · uploaded 12 Dec 2023Source
  • 2 CERSAI detailsMAHALAXMI INFRAESTATE CERSAI REPORT JAN24.pdf · uploaded 17 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1.pdf · uploaded 1 Apr 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2.pdf · uploaded 1 Apr 2024Source
  • 3 Disclosure of sold/ booked inventoryINVENTORY.pdf · uploaded 1 Apr 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3.pdf · uploaded 1 Apr 2024Source
  • Form 5 (FY 2023-2024)FORM 5 - MAHALAXMI ASSOCIATES.pdf · uploaded 30 Sep 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 - MAHALAXMI ASSOCIATES.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 - MAHALAXMI ASSOCIATES.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mahalaxmi Form 1 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Mahalaxmi Form 2 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mahalaxmi Form 3 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryMahalaxmi Inventory 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • 1 Other – LegalMahalaxmi Declaration.pdf · uploaded 7 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mahalaxmi Form 1 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mahalaxmi Form 3 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Mahalaxmi Form 2 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • 1 Other – LegalMahalaxmi Declaration.pdf · uploaded 7 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryMahalaxmi Inventory 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentScan_20241224_154838.pdf · uploaded 24 Dec 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentScan_20241224_154838.pdf · uploaded 24 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mahalaxmi Form 1 FY 24-25 Q3.pdf · uploaded 28 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mahalaxmi Form 3 FY 24-25 Q3_C.pdf · uploaded 28 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Mahalaxmi Form 2 FY 24-25 Q3.pdf · uploaded 28 Mar 2025Source
  • 1 Disclosure of sold/ booked inventoryMahalaxmi Inventory FY 24-25 Q3.pdf · uploaded 28 Mar 2025Source
  • Form 5 (FY 2024-2025)Form 5 FY 2024-25 Mahalaxmi Infraestate.pdf · uploaded 28 Sep 2025Source
  • Form 1FORM 1 MAHALAXMI INFRAESTATE.pdf · uploaded 30 Sep 2025Source
  • Form 2FORM 2 MAHALAXMI INFRAESTATE.pdf · uploaded 30 Sep 2025Source
  • Form 3FORM 3 MAHALAXMI INFRAESTATE.pdf · uploaded 30 Sep 2025Source
  • Disclosure of Sold and Booked InventoryInventory Disclosure.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1FORM 1 FY 25-26 Q1.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 1FORM 1 FY 25-26 Q2.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 1FORM 1 FY 25-26 Q3.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 1FORM 1 FY 25-26 Q3.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 FY 25-26 Q1.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 FY 25-26 Q2.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 FY 25-26 Q3.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 FY 25-26 Q3.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 FY 25-26 Q1.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 FY 25-26 Q2.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 FY 25-26 Q2.pdf · uploaded 26 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 FY 25-26 Q3.pdf · uploaded 26 Apr 2026Source
  • Form 5 (FY 2025-2026)Mahalaxmi Infraestate Form 5 FY 2025-26 Signed.pdf · uploaded 29 Sep 2026Source

Technical

  • Document6 Commencement Certificate.pdf · uploaded 13 Jun 2022Source
  • DocumentApproved Plan 1-5.pdf · uploaded 13 Jun 2022Source
  • DocumentApproved Plan 2-5.pdf · uploaded 13 Jun 2022Source
  • DocumentApproved Plan 3-5.pdf · uploaded 13 Jun 2022Source
  • DocumentApproved Plan 4-5.pdf · uploaded 13 Jun 2022Source
  • DocumentApproved Plan 5-5.pdf · uploaded 13 Jun 2022Source
  • DocumentScan_20241224_154838.pdf · uploaded 24 Dec 2024Source
  • DocumentScan_20241224_154838.pdf · uploaded 24 Dec 2024Source
  • DocumentCC 16052025.pdf · uploaded 26 Apr 2026Source
  • Document1 OF 7 16052025.pdf · uploaded 26 Apr 2026Source
  • Document2 OF 7 16052025.pdf · uploaded 26 Apr 2026Source
  • Document3 OF 7 16052025.pdf · uploaded 26 Apr 2026Source
  • Document4 OF 7 16052025.pdf · uploaded 26 Apr 2026Source
  • Document5 OF 7 16052025.pdf · uploaded 26 Apr 2026Source
  • Document6 OF 7 16052025.pdf · uploaded 26 Apr 2026Source
  • Document7 OF 7 16052025.pdf · uploaded 26 Apr 2026Source
  • DocumentCC 05022026.pdf · uploaded 26 Apr 2026Source
  • Document1 -7 05022026.pdf · uploaded 26 Apr 2026Source
  • Document2 -7 05022026.pdf · uploaded 26 Apr 2026Source
  • Document3 -7 05022026.pdf · uploaded 26 Apr 2026Source
  • Document4 - 7 05022026.pdf · uploaded 26 Apr 2026Source
  • Document5 - 7 05022026.pdf · uploaded 26 Apr 2026Source
  • Document6 - 7 05022026.pdf · uploaded 26 Apr 2026Source
  • Document7 -7 05022026.pdf · uploaded 26 Apr 2026Source

Technical (Architect)

  • DocumentMahalaxmi Form 1 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • DocumentMahalaxmi Form 1 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • DocumentMahalaxmi Form 1 FY 24-25 Q3.pdf · uploaded 28 Mar 2025Source
  • DocumentFORM 1 FY 25-26 Q3.pdf · uploaded 26 Apr 2026Source

Technical (Engineer)

  • DocumentMahalaxmi Form 2 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • DocumentMahalaxmi Form 2 23-24 Q4.pdf · uploaded 7 Oct 2024Source
  • DocumentMahalaxmi Form 2 FY 24-25 Q3.pdf · uploaded 28 Mar 2025Source
  • DocumentFORM 2 FY 25-26 Q3.pdf · uploaded 26 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsGat No 930

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Shop54 units in all
Address
Gat No 930, Newale Wasti, Chikhali, Pune 411062, Gat No 930, Newale Wasti, ChikhaliPIN 411062
Village
Chikhali, Haveli taluka
Designated bank account
119
Developed in phases
No

Survey, CTS, gat or plot numbers

Gat No 930

Boundaries

North
Gat No 930 Part
South
Gat No 928 and Road
East
Gat No 930 Part
West
9 M wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking54 units

9 of 54 units booked (17%), as the promoter reported to MahaRERA

1BHK · 18 units2BHK · 28 unitsShop · 8 units
TypeCarpet areaUnitsBooked
1BHK45.05 sq m · 485 sq ft63
1BHK45.11 sq m · 486 sq ft61
1BHK45.16 sq m · 486 sq ft61
2BHK62.33 sq m · 671 sq ft30
2BHK63.86 sq m · 687 sq ft30
2BHK64 sq m · 689 sq ft32
2BHK64.92 sq m · 699 sq ft30
2BHK64.93 sq m · 699 sq ft20
Show all 21 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK64.98 sq m · 699 sq ft30
2BHK65.4 sq m · 704 sq ft30
2BHK65.86 sq m · 709 sq ft31
2BHK65.91 sq m · 709 sq ft20
2BHK66.76 sq m · 719 sq ft31
Shop19 sq m · 205 sq ft10
Shop19.52 sq m · 210 sq ft10
Shop21.65 sq m · 233 sq ft10
Shop22.36 sq m · 241 sq ft10
Shop22.72 sq m · 245 sq ft10
Shop22.72 sq m · 245 sq ft10
Shop22.72 sq m · 245 sq ft10
Shop28.6 sq m · 308 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKhire Bhide & Associates—
Chartered accountantGanesh Kankate—
Chartered accountantKishor Vijay Mavkar—
EngineerMayur Namdeo Gaikwad—

Source: MahaRERA project page. Contact details are not shown.

New Era in numbers

Registered deals, summarised

Deedo has 23 registered documents at New Era, from Jan 2026 to Sep 2026: 21 sales, 1 mortgage. The median registered sale works out to about ₹7,200 per sq ft, at a median of ₹34 L a deal; 0% of sales were resales.

What is the price per sq ft at New Era?
The median registered sale works out to about ₹7,200 per sq ft, at a median of ₹34 L a deal; 0% of sales were resales.
How many properties have been sold at New Era?
21 sales are registered at New Era.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at New Era by Deedo, last updated with deals registered in Sep 2026.

Latest deal · Primary sale · Sep 2026

₹25–50 L

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Methodology