Completion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 13% of its units are booked.

Balewadi, Pune 411045 · Property rates in Balewadi · Promoter: V Realty

DeliveryExtended 4 moPromised Dec 2028 · now due Apr 2029RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales13% booked16 of 126 units · as the promoter reported to MahaRERA
Vertica project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Apr 2029

  • P52100024817Registered 9 Mar 2020, completion promised 31 Dec 2028, revised to 30 Apr 2029.
  • P52100034464Registered 11 Apr 2022, completion promised 31 Dec 2028, revised to 30 Apr 2029.
  • P52100034995Registered 28 Apr 2022, completion promised 31 Dec 2028, revised to 30 Apr 2029.

3 extension certificates on record.

3 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations3
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000248179 Mar 202031 Dec 202830 Apr 2029V RealtyProject page
P5210003446411 Apr 202231 Dec 202830 Apr 2029V RealtyProject page
P5210003499528 Apr 202231 Dec 202830 Apr 2029V RealtyProject page
Documents733

6 documents held by Deedo, 727 filings listed on MahaRERA's project page

Extension certificate (3)

  • Extension certificateP52100024817 · 14 Aug 2026ViewSource
  • Extension certificateP52100034995 · 19 Aug 2026ViewSource
  • Extension certificateP52100034464 · 19 Aug 2026ViewSource

Registration certificate (3)

  • Registration certificateP52100034464 · 20 Aug 2026ViewSource
  • Registration certificateP52100034995 · 21 Aug 2026ViewSource
  • Registration certificateP52100024817 · 24 Aug 2026ViewSource

Finance

  • PAN CardP52100024817 · V Realty pan card.pdf · uploaded 31 Jan 2020Source
  • PAN CardP52100034995 · V Realty pan card.pdf · uploaded 25 Feb 2022Source
Show all 733 documentsShow fewer documents

Finance

  • PAN CardP52100034464 · V Realty pan card.pdf · uploaded 8 Mar 2022Source

Legal

  • Legal Title reportP52100024817 · SEARCH AND TITLE V REALTY.pdf · uploaded 6 Feb 2020Source
  • Legal Title reportP52100024817 · TITLE CERTIFICATE V REALTY.pdf · uploaded 6 Feb 2020Source
  • Declaration Form BP52100024817 · Balewadi IT 23 Form B.pdf · uploaded 6 Feb 2020Source
  • Declaration Form BP52100034464 · FORM B - VERTICA PHASE -3.pdf · uploaded 19 Mar 2022Source
  • Declaration Form BP52100034995 · FORM B VERTICA PHASE -2.pdf · uploaded 19 Mar 2022Source
  • Legal Title reportP52100034464 · SEARCH AND TITLE FORMAT A VERITICA PHASE -3.pdf · uploaded 7 Apr 2022Source
  • Other – LegalP52100034464 · CONSENT FROM CUSTOMER VERTICA PH-3.pdf · uploaded 2 Dec 2023Source
  • Declaration Form BP52100024817 · FORM B VERTICA PH-1.pdf · uploaded 16 Nov 2024Source
  • Declaration Form BP52100024817 · FORM B VERTICA PH-1.pdf · uploaded 16 Nov 2024Source
  • Declaration Form BP52100024817 · TIR AS PER RERA.pdf · uploaded 11 Apr 2026Source
  • Declaration Form BP52100024817 · FORM B -VERTICA PHASE -1.pdf · uploaded 11 Apr 2026Source
  • Declaration Form BP52100024817 · 7-12 VERTICA.pdf · uploaded 11 Apr 2026Source
  • Declaration Form BP52100034464 · 7-12 VERTICA.pdf · uploaded 25 Apr 2026Source
  • Declaration Form BP52100034995 · 7-12 VERTICA.pdf · uploaded 29 Apr 2026Source
  • Declaration Form BP52100034464 · TIR -VERTICA.pdf · uploaded 14 May 2026Source
  • Declaration Form BP52100034464 · FORM B -VERTICA PHASE -3.pdf · uploaded 14 May 2026Source
  • Declaration Form BP52100034995 · TIR -VERTICA.pdf · uploaded 26 May 2026Source

Migrated

  • 1 PAN CardP52100024817 · V Realty pan card.pdf · uploaded 31 Jan 2020Source
  • 1 Copy of Layout Approval (in case of layout)P52100024817 · 1.pdf · uploaded 31 Jan 2020Source
  • 2 Copy of Layout Approval (in case of layout)P52100024817 · 2.pdf · uploaded 31 Jan 2020Source
  • 3 Copy of Layout Approval (in case of layout)P52100024817 · 3.pdf · uploaded 31 Jan 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100024817 · 1-19.pdf · uploaded 31 Jan 2020Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100024817 · 2-19.pdf · uploaded 31 Jan 2020Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100024817 · 3-19.pdf · uploaded 31 Jan 2020Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100024817 · 4-19.pdf · uploaded 31 Jan 2020Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52100024817 · 5-19.pdf · uploaded 31 Jan 2020Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52100024817 · 6-19.pdf · uploaded 31 Jan 2020Source
  • 7 Building Plan Approval / NA Order for plotted developmentP52100024817 · 7-19.pdf · uploaded 31 Jan 2020Source
  • 8 Building Plan Approval / NA Order for plotted developmentP52100024817 · 8-19.pdf · uploaded 31 Jan 2020Source
  • 9 Building Plan Approval / NA Order for plotted developmentP52100024817 · 9-19.pdf · uploaded 31 Jan 2020Source
  • 10 Building Plan Approval / NA Order for plotted developmentP52100024817 · 10-19.pdf · uploaded 31 Jan 2020Source
  • 11 Building Plan Approval / NA Order for plotted developmentP52100024817 · 11-19.pdf · uploaded 31 Jan 2020Source
  • 12 Building Plan Approval / NA Order for plotted developmentP52100024817 · 12-19.pdf · uploaded 31 Jan 2020Source
  • 13 Building Plan Approval / NA Order for plotted developmentP52100024817 · 13-19.pdf · uploaded 31 Jan 2020Source
  • 14 Building Plan Approval / NA Order for plotted developmentP52100024817 · 14-19.PDF · uploaded 31 Jan 2020Source
  • 15 Building Plan Approval / NA Order for plotted developmentP52100024817 · 15-19.PDF · uploaded 31 Jan 2020Source
  • 16 Building Plan Approval / NA Order for plotted developmentP52100024817 · 16-19.pdf · uploaded 31 Jan 2020Source
  • 17 Building Plan Approval / NA Order for plotted developmentP52100024817 · 17-19.pdf · uploaded 31 Jan 2020Source
  • 18 Building Plan Approval / NA Order for plotted developmentP52100024817 · 18-19.PDF · uploaded 31 Jan 2020Source
  • 19 Building Plan Approval / NA Order for plotted developmentP52100024817 · 19-19.PDF · uploaded 31 Jan 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100024817 · COMMENCEMENT IOD V REALTY.pdf · uploaded 31 Jan 2020Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100024817 · Commencement Certificate.pdf · uploaded 31 Jan 2020Source
  • 1 Copy of the legal title reportP52100024817 · SEARCH AND TITLE V REALTY.pdf · uploaded 6 Feb 2020Source
  • 2 Copy of the legal title reportP52100024817 · TITLE CERTIFICATE V REALTY.pdf · uploaded 6 Feb 2020Source
  • 1 Details of encumbrancesP52100024817 · No Encumbrance certificate.pdf · uploaded 6 Feb 2020Source
  • 1 Declaration in FORM BP52100024817 · Balewadi IT 23 Form B.pdf · uploaded 6 Feb 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGINEER CERTIFICATE V REALTY.pdf · uploaded 6 Feb 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100024817 · FORM 2A ENGG CERTIFICATE.pdf · uploaded 6 Feb 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA Certificate V REALTY FORM 3.pdf · uploaded 6 Feb 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · Arch Balewadi.pdf · uploaded 26 Feb 2020Source
  • 1 Proforma of Allotment letterP52100024817 · Balewadi Agreement 1.pdf · uploaded 26 Feb 2020Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · FORM 2A JUN-2020 V REALTY.pdf · uploaded 25 Jul 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100024817 · FORM 5 AS ON 31-3-20 V-Realty.pdf · uploaded 1 Oct 2020Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100024817 · ENGINEERS CERTIFICATE - Balewadi 23_compressed.pdf · uploaded 5 Oct 2020Source
  • 1 Disclosure of sold/ booked inventoryP52100024817 · DISCLOSER OF SOLD INVENTORY-VREALTY-20-5-21.pdf · uploaded 20 May 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100024817 · FORM 5 V REALTY -2020-21.pdf · uploaded 30 Jun 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE -V REALTY -1-10-21.pdf · uploaded 7 Oct 2021Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE - V REALTY-1-10-21.pdf · uploaded 7 Oct 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE V Realty Rera Oct 2021_1_compressed.pdf · uploaded 7 Oct 2021Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE - V REALTY.pdf · uploaded 15 Jan 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · Engineer's Certificate - V realty.pdf · uploaded 15 Jan 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE V REALTY PHASE -1.pdf · uploaded 15 Jan 2022Source
  • 1 PAN CardP52100034995 · V Realty pan card.pdf · uploaded 25 Feb 2022Source
  • 1 Copy of Layout Approval (in case of layout)P52100034995 · 1-2 IOD.pdf · uploaded 25 Feb 2022Source
  • 2 Copy of Layout Approval (in case of layout)P52100034995 · 2-2 IOD.pdf · uploaded 25 Feb 2022Source
  • 3 Copy of Layout Approval (in case of layout)P52100034995 · 1-9.pdf · uploaded 25 Feb 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100034995 · 2-9.pdf · uploaded 25 Feb 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100034995 · 3-9.pdf · uploaded 25 Feb 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100034995 · 4-9.pdf · uploaded 25 Feb 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100034995 · 5-9.pdf · uploaded 25 Feb 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52100034995 · 6-9.pdf · uploaded 25 Feb 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52100034995 · 7-9.pdf · uploaded 25 Feb 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentP52100034995 · 8-9.pdf · uploaded 25 Feb 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentP52100034995 · 9-9.pdf · uploaded 25 Feb 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100034995 · IOD COMMENCEMENT CC273921 dated 16-12-2021.pdf · uploaded 25 Feb 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100034995 · CC-16-12-2021.pdf · uploaded 25 Feb 2022Source
  • 1 CERSAI detailsP52100034995 · CERSAI REPORT V REALTY.pdf · uploaded 25 Feb 2022Source
  • 4 Copy of Layout Approval (in case of layout)P52100024817 · IOD-1-2.pdf · uploaded 7 Mar 2022Source
  • 5 Copy of Layout Approval (in case of layout)P52100024817 · IOD 2-2.pdf · uploaded 7 Mar 2022Source
  • 6 Copy of Layout Approval (in case of layout)P52100024817 · 1-9.pdf · uploaded 7 Mar 2022Source
  • 20 Building Plan Approval / NA Order for plotted developmentP52100024817 · 1-9.pdf · uploaded 7 Mar 2022Source
  • 21 Building Plan Approval / NA Order for plotted developmentP52100024817 · 2-9.pdf · uploaded 7 Mar 2022Source
  • 22 Building Plan Approval / NA Order for plotted developmentP52100024817 · 4-9.pdf · uploaded 7 Mar 2022Source
  • 23 Building Plan Approval / NA Order for plotted developmentP52100024817 · 5-9.pdf · uploaded 7 Mar 2022Source
  • 24 Building Plan Approval / NA Order for plotted developmentP52100024817 · 6-9.pdf · uploaded 7 Mar 2022Source
  • 25 Building Plan Approval / NA Order for plotted developmentP52100024817 · 7-9.pdf · uploaded 7 Mar 2022Source
  • 26 Building Plan Approval / NA Order for plotted developmentP52100024817 · 8-9.pdf · uploaded 7 Mar 2022Source
  • 27 Building Plan Approval / NA Order for plotted developmentP52100024817 · 9-9.pdf · uploaded 7 Mar 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentP52100024817 · 3-9.pdf · uploaded 7 Mar 2022Source
  • 4 Commencement Certificates / NA Order for plotted developmentP52100024817 · CC-16-12-2021.pdf · uploaded 7 Mar 2022Source
  • 5 Commencement Certificates / NA Order for plotted developmentP52100024817 · IOD COMMENCEMENT CC273921 dated 16-12-2021.pdf · uploaded 7 Mar 2022Source
  • 6 Commencement Certificates / NA Order for plotted developmentP52100024817 · NA ORDER AREA CORRECTION DATED -29-6-21.pdf · uploaded 7 Mar 2022Source
  • 1 Declaration about Commencement CertificateP52100024817 · DECLARATION ABT COMMENCEMENT CERTIFICATE -PHASE-1.pdf · uploaded 7 Mar 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · Arch Certificate Form 1 Phase 1-Vertica.pdf · uploaded 7 Mar 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · Engg Certificate Form 2 Phase 1 Vertica.pdf · uploaded 7 Mar 2022Source
  • 1 CERSAI detailsP52100024817 · CERSAI_Search_Report_Asset_Id_Based_Search_20_01_2022_19_03_10_554.pdf · uploaded 7 Mar 2022Source
  • 2 CERSAI detailsP52100024817 · CERSAI REPORT V REALTY.pdf · uploaded 7 Mar 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PHASE -1.pdf · uploaded 7 Mar 2022Source
  • 1 PAN CardP52100034464 · V Realty pan card.pdf · uploaded 8 Mar 2022Source
  • 1 Copy of Layout Approval (in case of layout)P52100034464 · IOD-1-2.pdf · uploaded 8 Mar 2022Source
  • 2 Copy of Layout Approval (in case of layout)P52100034464 · IOD 2-2.pdf · uploaded 8 Mar 2022Source
  • 3 Copy of Layout Approval (in case of layout)P52100034464 · 1-9.pdf · uploaded 8 Mar 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100034464 · 2-9.pdf · uploaded 8 Mar 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100034464 · 3-9.pdf · uploaded 8 Mar 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100034464 · 4-9.pdf · uploaded 8 Mar 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100034464 · 5-9.pdf · uploaded 8 Mar 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52100034464 · 6-9.pdf · uploaded 8 Mar 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52100034464 · 7-9.pdf · uploaded 8 Mar 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentP52100034464 · 8-9.pdf · uploaded 8 Mar 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentP52100034464 · 9-9.pdf · uploaded 8 Mar 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100034464 · CC-16-12-2021.pdf · uploaded 8 Mar 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100034464 · IOD COMMENCEMENT CC273921 dated 16-12-2021.pdf · uploaded 8 Mar 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentP52100034464 · NA ORDER AREA CORRECTION DATED -29-6-21.pdf · uploaded 8 Mar 2022Source
  • 1 CERSAI detailsP52100034464 · CERSAI REPORT V REALTY.pdf · uploaded 8 Mar 2022Source
  • 3 CERSAI detailsP52100024817 · CERSAI REPORT V REALTY.pdf · uploaded 9 Mar 2022Source
  • 2 Disclosure of sold/ booked inventoryP52100024817 · DISCLOSER OF SOLD INVENTORY-V REALTY-9-3-22.pdf · uploaded 9 Mar 2022Source
  • 1 Declaration about Commencement CertificateP52100034464 · DECLARATION ABT COMMENCEMENT VERTICA PH-3.pdf · uploaded 15 Mar 2022Source
  • 1 Declaration about Commencement CertificateP52100034995 · DECLARATION ABT COMMENCEMENT VERTICA PH-2.pdf · uploaded 15 Mar 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA - Phase 2.pdf · uploaded 15 Mar 2022Source
  • 1 Declaration in FORM BP52100034464 · FORM B - VERTICA PHASE -3.pdf · uploaded 19 Mar 2022Source
  • 1 Declaration in FORM BP52100034995 · FORM B VERTICA PHASE -2.pdf · uploaded 19 Mar 2022Source
  • 1 Copy of the legal title reportP52100034464 · SEARCH AND TITLE FORMAT A VERITICA PHASE -3.pdf · uploaded 7 Apr 2022Source
  • 1 Details of encumbrancesP52100034464 · ENCUMBRANCE CERTIFICATE VERTICA PHASE -3.pdf · uploaded 7 Apr 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA - Phase 3.pdf · uploaded 7 Apr 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PHASE 3.pdf · uploaded 7 Apr 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PHASE -3.pdf · uploaded 7 Apr 2022Source
  • 1 Proforma of Allotment letterP52100034464 · PHASE -3 VERTICA RERA Proforma of the agreement for sale.pdf · uploaded 7 Apr 2022Source
  • 1 Copy of the legal title reportP52100034995 · SEARCH AND TITLE FORMAT A VERITICA PHASE -2.pdf · uploaded 7 Apr 2022Source
  • 1 Details of encumbrancesP52100034995 · ENCUMBRANCE CERTIFICATE VERTICA PHASE -2.pdf · uploaded 7 Apr 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PHASE -2.pdf · uploaded 7 Apr 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PHASE -2.pdf · uploaded 7 Apr 2022Source
  • 1 Proforma of Allotment letterP52100034995 · PHASE -2 VERTICA RERA Proforma of the agreement for sale.pdf · uploaded 7 Apr 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PHASE -3.pdf · uploaded 18 Jul 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PHASE -3.pdf · uploaded 18 Jul 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100034464 · FORM 2A VERTICA PHASE -3.pdf · uploaded 18 Jul 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE V REALTY PHASE -3.pdf · uploaded 18 Jul 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PHASE -2.pdf · uploaded 18 Jul 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PHASE -2.pdf · uploaded 18 Jul 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100034995 · FORM 2A VERTICA PHASE -2.pdf · uploaded 18 Jul 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PHASE -2.pdf · uploaded 18 Jul 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PHASE -1.pdf · uploaded 18 Jul 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PHASE -1.pdf · uploaded 18 Jul 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100024817 · FORM 2A VERTICA PHASE -1.pdf · uploaded 18 Jul 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PHASE -1.pdf · uploaded 18 Jul 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PH-3 6-10-2022.pdf · uploaded 19 Oct 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PH-3 6-10-2022_compressed.pdf · uploaded 19 Oct 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100034464 · VERTICA P3 for RERA 1-10-2022 Quality.pdf · uploaded 19 Oct 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PHASE -3.pdf · uploaded 19 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100034464 · FORM 5 -VERTICA PHASE -3.pdf · uploaded 19 Oct 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PH-2 6-10-2022.pdf · uploaded 19 Oct 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PH-2 6-10-2022.pdf · uploaded 19 Oct 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100034995 · VERTICA P2 for RERA 1-10-2022 Quality.pdf · uploaded 19 Oct 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PHASE -2.pdf · uploaded 19 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100034995 · FORM 5 -VERTICA PHASE -2.pdf · uploaded 19 Oct 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 19 Oct 2022Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PH-1 6-10-2022.pdf · uploaded 19 Oct 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100024817 · VERTICA P1 for RERA 1-10-2022 Quality.pdf · uploaded 19 Oct 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PHASE -1.pdf · uploaded 19 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100024817 · FORM 5 -VERTICA PHASE -1.pdf · uploaded 19 Oct 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 27 Jan 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PH-3.pdf · uploaded 27 Jan 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100034464 · FORM 2A VERTICA PH-3.pdf · uploaded 27 Jan 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PH-3.pdf · uploaded 27 Jan 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 27 Jan 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PH-2.pdf · uploaded 27 Jan 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100034995 · FORM 2A VERTICA PH-2.pdf · uploaded 27 Jan 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PH-2.pdf · uploaded 27 Jan 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 27 Jan 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 27 Jan 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100024817 · FORM 2A VERTICA PH-1.pdf · uploaded 27 Jan 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 28 Jan 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PHASE -1.pdf · uploaded 22 May 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PHASE -3.pdf · uploaded 22 May 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PHASE -1.pdf · uploaded 22 May 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PHASE -3.pdf · uploaded 22 May 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100034464 · FORM 2A - VERTICA PH-3-MAR-23.pdf · uploaded 22 May 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PHASE -1.pdf · uploaded 22 May 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100034464 · CA CERTIFICATE VERTICA PHASE -3.pdf · uploaded 22 May 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PHASE -2.pdf · uploaded 22 May 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PHASE -2.pdf · uploaded 22 May 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100034995 · FORM 2A - VERTICA PH-2-MAR-23.pdf · uploaded 22 May 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PHASE -2.pdf · uploaded 22 May 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PHASE -1.pdf · uploaded 22 May 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PHASE -1.pdf · uploaded 22 May 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100024817 · FORM 2A - VERTICA PH-1-MAR-23.pdf · uploaded 22 May 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PHASE -1.pdf · uploaded 22 May 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PHASE -3.pdf · uploaded 31 Jul 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PHASE -3.pdf · uploaded 31 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034464 · FORM 2A - VERTICA PH-3-JUN-23.pdf · uploaded 31 Jul 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PHASE -3.pdf · uploaded 31 Jul 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PHASE -2.pdf · uploaded 31 Jul 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PHASE -2.pdf · uploaded 31 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034995 · FORM 2A - VERTICA PH-2-JUN-23.pdf · uploaded 31 Jul 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PHASE -2.pdf · uploaded 31 Jul 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PHASE -1.pdf · uploaded 31 Jul 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PHASE -1.pdf · uploaded 31 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100024817 · FORM 2A - VERTICA PH-1-JUN-23.pdf · uploaded 31 Jul 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PHASE -1.pdf · uploaded 31 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100034464 · FORM 5-2022-23 VERTICA PHASE -3.pdf · uploaded 23 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100034995 · FORM 5-2022-23 VERTICA PHASE -2.pdf · uploaded 23 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100024817 · FORM 5-2022-23 VERTICA PHASE -1.pdf · uploaded 23 Sep 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 20 Oct 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PHASE -3.pdf · uploaded 20 Oct 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034464 · FORM 2A - VERTICA PH-3-SEPT-23.pdf · uploaded 20 Oct 2023Source
  • 1 Disclosure of sold/ booked inventoryP52100034464 · DISCLOSER OF SOLD INVENTORY VERTICA PHASE -3.pdf · uploaded 20 Oct 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PH-3.pdf · uploaded 20 Oct 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 20 Oct 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PHASE -2.pdf · uploaded 20 Oct 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034995 · FORM 2A - VERTICA PH-2-SEPT-23.pdf · uploaded 20 Oct 2023Source
  • 1 Disclosure of sold/ booked inventoryP52100034995 · DISCLOSER OF SOLD INVENTORY VERTICA PH-2.pdf · uploaded 20 Oct 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PH-2.pdf · uploaded 20 Oct 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 20 Oct 2023Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PHASE -1.pdf · uploaded 20 Oct 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100024817 · FORM 2A - VERTICA PH-1-SEPT-23.pdf · uploaded 20 Oct 2023Source
  • 3 Disclosure of sold/ booked inventoryP52100024817 · DISCLOSER OF SOLD INVENTORY VERTICA PH-1.pdf · uploaded 20 Oct 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 20 Oct 2023Source
  • 7 Copy of Layout Approval (in case of layout)P52100024817 · 1-6 -LAYOUT.pdf · uploaded 1 Dec 2023Source
  • 28 Building Plan Approval / NA Order for plotted developmentP52100024817 · 2-6- PARKING PLAN.pdf · uploaded 1 Dec 2023Source
  • 29 Building Plan Approval / NA Order for plotted developmentP52100024817 · 3-6 - GROUND AND MEZZ FLOOR.pdf · uploaded 1 Dec 2023Source
  • 30 Building Plan Approval / NA Order for plotted developmentP52100024817 · 4-6- 1ST TO 5TH FLOOR.pdf · uploaded 1 Dec 2023Source
  • 31 Building Plan Approval / NA Order for plotted developmentP52100024817 · 5-6 6TH FLOOR.pdf · uploaded 1 Dec 2023Source
  • 32 Building Plan Approval / NA Order for plotted developmentP52100024817 · 6-6 SECTION PLAN.pdf · uploaded 1 Dec 2023Source
  • 7 Commencement Certificates / NA Order for plotted developmentP52100024817 · COMMENCEMENT CERTIFICATE -16-10-2023.pdf · uploaded 1 Dec 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE PH-1.pdf · uploaded 1 Dec 2023Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGINEER CERTIFICATE VERTICA PHASE 1.pdf · uploaded 1 Dec 2023Source
  • 4 Copy of Layout Approval (in case of layout)P52100034464 · 1-6 -LAYOUT.pdf · uploaded 2 Dec 2023Source
  • 5 Copy of Layout Approval (in case of layout)P52100034464 · 1-7.pdf · uploaded 2 Dec 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentP52100034464 · 2-6- PARKING PLAN.pdf · uploaded 2 Dec 2023Source
  • 10 Building Plan Approval / NA Order for plotted developmentP52100034464 · 3-6 - GROUND AND MEZZ FLOOR.pdf · uploaded 2 Dec 2023Source
  • 11 Building Plan Approval / NA Order for plotted developmentP52100034464 · 4-6- 1ST TO 5TH FLOOR.pdf · uploaded 2 Dec 2023Source
  • 12 Building Plan Approval / NA Order for plotted developmentP52100034464 · 5-6 6TH FLOOR.pdf · uploaded 2 Dec 2023Source
  • 13 Building Plan Approval / NA Order for plotted developmentP52100034464 · 6-6 SECTION PLAN.pdf · uploaded 2 Dec 2023Source
  • 4 Commencement Certificates / NA Order for plotted developmentP52100034464 · COMMENCEMENT CERTIFICATE -16-10-2023.pdf · uploaded 2 Dec 2023Source
  • 2 Declaration about Commencement CertificateP52100034464 · DECLARATION ABT CC - VERTICA PH-3.pdf · uploaded 2 Dec 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE PH-3.pdf · uploaded 2 Dec 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGINEER CERTIFICATE VERTICA PHASE 3.pdf · uploaded 2 Dec 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100034464 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - ANKUSH ASABE.pdf · uploaded 2 Dec 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsP52100034464 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - LAHURAJ ASABE.pdf · uploaded 2 Dec 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsP52100034464 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - VIKRAM GAIKWAD.pdf · uploaded 2 Dec 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100034464 · Format A- Seprate Bank Account -VERTICA PH-3.pdf · uploaded 2 Dec 2023Source
  • 1 Other – LegalP52100034464 · CONSENT FROM CUSTOMER VERTICA PH-3.pdf · uploaded 2 Dec 2023Source
  • 4 Copy of Layout Approval (in case of layout)P52100034995 · 1-6 -LAYOUT.pdf · uploaded 2 Dec 2023Source
  • 5 Copy of Layout Approval (in case of layout)P52100034995 · 1-7.pdf · uploaded 2 Dec 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentP52100034995 · 2-6- PARKING PLAN.pdf · uploaded 2 Dec 2023Source
  • 10 Building Plan Approval / NA Order for plotted developmentP52100034995 · 3-6 - GROUND AND MEZZ FLOOR.pdf · uploaded 2 Dec 2023Source
  • 11 Building Plan Approval / NA Order for plotted developmentP52100034995 · 4-6- 1ST TO 5TH FLOOR.pdf · uploaded 2 Dec 2023Source
  • 12 Building Plan Approval / NA Order for plotted developmentP52100034995 · 5-6 6TH FLOOR.pdf · uploaded 2 Dec 2023Source
  • 13 Building Plan Approval / NA Order for plotted developmentP52100034995 · 6-6 SECTION PLAN.pdf · uploaded 2 Dec 2023Source
  • 3 Commencement Certificates / NA Order for plotted developmentP52100034995 · COMMENCEMENT CERTIFICATE -16-10-2023.pdf · uploaded 2 Dec 2023Source
  • 2 Declaration about Commencement CertificateP52100034995 · DECLARATION ABT CCC VERTICA PH-2.pdf · uploaded 2 Dec 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE PH-2.pdf · uploaded 2 Dec 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGINEER CERTIFICATE VERTICA PHASE 2.pdf · uploaded 2 Dec 2023Source
  • 2 Disclosure of sold/ booked inventoryP52100034995 · DISCLOSER OF SOLD INVENTORY - VERTICA PH-2.pdf · uploaded 2 Dec 2023Source
  • 3 Disclosure of sold/ booked inventoryP52100034995 · DISCLOSER OF SOLD INVENTORY - VERTICA PH-2.pdf · uploaded 2 Dec 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100034995 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - ANKUSH ASABE.pdf · uploaded 2 Dec 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100034995 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - LAHURAJ ASABE.pdf · uploaded 2 Dec 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsP52100034995 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - VIKRAM GAIKWAD.pdf · uploaded 2 Dec 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100034995 · Format A- Seprate Bank Account -VERTICA PH-2.pdf · uploaded 2 Dec 2023Source
  • 8 Copy of Layout Approval (in case of layout)P52100024817 · 1_compressed.pdf · uploaded 2 Dec 2023Source
  • 2 Declaration about Commencement CertificateP52100024817 · DECLARATION ABT CC VERTICA PH-1.pdf · uploaded 2 Dec 2023Source
  • 3 Declaration about Commencement CertificateP52100024817 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - LAHURAJ ASABE.pdf · uploaded 2 Dec 2023Source
  • 4 Disclosure of sold/ booked inventoryP52100024817 · DISCLOSER OF SOLD INVENTORY - VERTICA PH-1.pdf · uploaded 2 Dec 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100024817 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - ANKUSH ASABE.pdf · uploaded 2 Dec 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100024817 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - LAHURAJ ASABE.pdf · uploaded 2 Dec 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsP52100024817 · Annexure A- Disclosure of Interest in Other Real Estate Organizations-VERTICA - VIKRAM GAIKWAD.pdf · uploaded 2 Dec 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100024817 · Format A- Seprate Bank Account- VERTICA PH-1.pdf · uploaded 2 Dec 2023Source
  • 9 Copy of Layout Approval (in case of layout)P52100024817 · 1-6 -LAYOUT.pdf · uploaded 13 Dec 2023Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE PH-1.pdf · uploaded 13 Dec 2023Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGINEER CERTIFICATE VERTICA PHASE 1.pdf · uploaded 13 Dec 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 13 Dec 2023Source
  • 4 Declaration about Commencement CertificateP52100024817 · DECLARATION ABT CC VERTICA PH-1.pdf · uploaded 4 Jan 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE Phase 3.pdf · uploaded 11 Jan 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PH-3.pdf · uploaded 11 Jan 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034464 · FORM 2A - VERTICA PH-3-DEC-23.pdf · uploaded 11 Jan 2024Source
  • 2 Disclosure of sold/ booked inventoryP52100034464 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-3.pdf · uploaded 11 Jan 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE Phase 2.pdf · uploaded 11 Jan 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PH-2.pdf · uploaded 11 Jan 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034995 · FORM 2A - VERTICA PH-2-DEC-23.pdf · uploaded 11 Jan 2024Source
  • 4 Disclosure of sold/ booked inventoryP52100034995 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-2.pdf · uploaded 11 Jan 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PH-3.pdf · uploaded 12 Jan 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PH-2.pdf · uploaded 12 Jan 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE Phase 1.pdf · uploaded 18 Jan 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 18 Jan 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100024817 · FORM 2A - VERTICA PH-1-DEC-23.pdf · uploaded 18 Jan 2024Source
  • 5 Disclosure of sold/ booked inventoryP52100024817 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-1.pdf · uploaded 18 Jan 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 18 Jan 2024Source
  • 6 Copy of Layout Approval (in case of layout)P52100034464 · 1-8.pdf · uploaded 12 Feb 2024Source
  • 14 Building Plan Approval / NA Order for plotted developmentP52100034464 · 2-8.pdf · uploaded 12 Feb 2024Source
  • 15 Building Plan Approval / NA Order for plotted developmentP52100034464 · 3-8.pdf · uploaded 12 Feb 2024Source
  • 16 Building Plan Approval / NA Order for plotted developmentP52100034464 · 4-8.pdf · uploaded 12 Feb 2024Source
  • 17 Building Plan Approval / NA Order for plotted developmentP52100034464 · 5-8.pdf · uploaded 12 Feb 2024Source
  • 18 Building Plan Approval / NA Order for plotted developmentP52100034464 · 6-8.pdf · uploaded 12 Feb 2024Source
  • 19 Building Plan Approval / NA Order for plotted developmentP52100034464 · 7-8.pdf · uploaded 12 Feb 2024Source
  • 20 Building Plan Approval / NA Order for plotted developmentP52100034464 · 8-8.pdf · uploaded 12 Feb 2024Source
  • 5 Commencement Certificates / NA Order for plotted developmentP52100034464 · COMMENCEMENT CERTIFICATE 9-2-2024.pdf · uploaded 12 Feb 2024Source
  • 6 Copy of Layout Approval (in case of layout)P52100034995 · 1-8.pdf · uploaded 12 Feb 2024Source
  • 14 Building Plan Approval / NA Order for plotted developmentP52100034995 · 2-8.pdf · uploaded 12 Feb 2024Source
  • 15 Building Plan Approval / NA Order for plotted developmentP52100034995 · 3-8.pdf · uploaded 12 Feb 2024Source
  • 16 Building Plan Approval / NA Order for plotted developmentP52100034995 · 4-8.pdf · uploaded 12 Feb 2024Source
  • 17 Building Plan Approval / NA Order for plotted developmentP52100034995 · 5-8.pdf · uploaded 12 Feb 2024Source
  • 18 Building Plan Approval / NA Order for plotted developmentP52100034995 · 6-8.pdf · uploaded 12 Feb 2024Source
  • 19 Building Plan Approval / NA Order for plotted developmentP52100034995 · 7-8.pdf · uploaded 12 Feb 2024Source
  • 20 Building Plan Approval / NA Order for plotted developmentP52100034995 · 8-8.pdf · uploaded 12 Feb 2024Source
  • 4 Commencement Certificates / NA Order for plotted developmentP52100034995 · COMMENCEMENT CERTIFICATE 9-2-2024.pdf · uploaded 12 Feb 2024Source
  • 10 Copy of Layout Approval (in case of layout)P52100024817 · 1-8.pdf · uploaded 12 Feb 2024Source
  • 33 Building Plan Approval / NA Order for plotted developmentP52100024817 · 2-8.pdf · uploaded 12 Feb 2024Source
  • 34 Building Plan Approval / NA Order for plotted developmentP52100024817 · 3-8.pdf · uploaded 12 Feb 2024Source
  • 35 Building Plan Approval / NA Order for plotted developmentP52100024817 · 4-8.pdf · uploaded 12 Feb 2024Source
  • 36 Building Plan Approval / NA Order for plotted developmentP52100024817 · 5-8.pdf · uploaded 12 Feb 2024Source
  • 37 Building Plan Approval / NA Order for plotted developmentP52100024817 · 6-8.pdf · uploaded 12 Feb 2024Source
  • 38 Building Plan Approval / NA Order for plotted developmentP52100024817 · 7-8.pdf · uploaded 12 Feb 2024Source
  • 39 Building Plan Approval / NA Order for plotted developmentP52100024817 · 8-8.pdf · uploaded 12 Feb 2024Source
  • 8 Commencement Certificates / NA Order for plotted developmentP52100024817 · COMMENCEMENT CERTIFICATE 9-2-2024.pdf · uploaded 12 Feb 2024Source
  • 9 Commencement Certificates / NA Order for plotted developmentP52100024817 · COMMENCEMENT CERTIFICATE 9-2-2024.pdf · uploaded 12 Feb 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034464 · FORM 2A - VERTICA PH-3-MAR 2024.pdf · uploaded 11 Apr 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034995 · FORM 2A - VERTICA PH-2-MAR 2024.pdf · uploaded 11 Apr 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100024817 · FORM 2A - VERTICA PH-1-MAR 2024.pdf · uploaded 11 Apr 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 13 Apr 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PH-3.pdf · uploaded 13 Apr 2024Source
  • 3 Disclosure of sold/ booked inventoryP52100034464 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-3.pdf · uploaded 13 Apr 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA Certiticate V REALTY Phase 3.pdf · uploaded 13 Apr 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 13 Apr 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PH-2.pdf · uploaded 13 Apr 2024Source
  • 5 Disclosure of sold/ booked inventoryP52100034995 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-2.pdf · uploaded 13 Apr 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA Certiticate V REALTY Phase 2.pdf · uploaded 13 Apr 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 13 Apr 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 13 Apr 2024Source
  • 6 Disclosure of sold/ booked inventoryP52100024817 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-1.pdf · uploaded 13 Apr 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA Certiticate V REALTY Phase 1.pdf · uploaded 13 Apr 2024Source
  • 7 Copy of Layout Approval (in case of layout)P52100034464 · 1_compressed (1).pdf · uploaded 8 Jul 2024Source
  • 8 Copy of Layout Approval (in case of layout)P52100034464 · 1-11.pdf · uploaded 8 Jul 2024Source
  • 21 Building Plan Approval / NA Order for plotted developmentP52100034464 · 2-11.pdf · uploaded 8 Jul 2024Source
  • 22 Building Plan Approval / NA Order for plotted developmentP52100034464 · 3-11.pdf · uploaded 8 Jul 2024Source
  • 23 Building Plan Approval / NA Order for plotted developmentP52100034464 · 4-11.pdf · uploaded 8 Jul 2024Source
  • 24 Building Plan Approval / NA Order for plotted developmentP52100034464 · 5-11.pdf · uploaded 8 Jul 2024Source
  • 25 Building Plan Approval / NA Order for plotted developmentP52100034464 · 6-11.pdf · uploaded 8 Jul 2024Source
  • 26 Building Plan Approval / NA Order for plotted developmentP52100034464 · 7-11.pdf · uploaded 8 Jul 2024Source
  • 27 Building Plan Approval / NA Order for plotted developmentP52100034464 · 8-11.pdf · uploaded 8 Jul 2024Source
  • 28 Building Plan Approval / NA Order for plotted developmentP52100034464 · 9-11.pdf · uploaded 8 Jul 2024Source
  • 29 Building Plan Approval / NA Order for plotted developmentP52100034464 · 10-11.pdf · uploaded 8 Jul 2024Source
  • 30 Building Plan Approval / NA Order for plotted developmentP52100034464 · 11-11.pdf · uploaded 8 Jul 2024Source
  • 6 Commencement Certificates / NA Order for plotted developmentP52100034464 · COMMENCEMENT CERTIFICATE -07-06-2024_compressed.pdf · uploaded 8 Jul 2024Source
  • 7 Copy of Layout Approval (in case of layout)P52100034995 · 1_compressed (1).pdf · uploaded 8 Jul 2024Source
  • 8 Copy of Layout Approval (in case of layout)P52100034995 · 1-11.pdf · uploaded 8 Jul 2024Source
  • 21 Building Plan Approval / NA Order for plotted developmentP52100034995 · 2-11.pdf · uploaded 8 Jul 2024Source
  • 22 Building Plan Approval / NA Order for plotted developmentP52100034995 · 3-11.pdf · uploaded 8 Jul 2024Source
  • 23 Building Plan Approval / NA Order for plotted developmentP52100034995 · 4-11.pdf · uploaded 8 Jul 2024Source
  • 24 Building Plan Approval / NA Order for plotted developmentP52100034995 · 5-11.pdf · uploaded 8 Jul 2024Source
  • 25 Building Plan Approval / NA Order for plotted developmentP52100034995 · 6-11.pdf · uploaded 8 Jul 2024Source
  • 26 Building Plan Approval / NA Order for plotted developmentP52100034995 · 7-11.pdf · uploaded 8 Jul 2024Source
  • 27 Building Plan Approval / NA Order for plotted developmentP52100034995 · 8-11.pdf · uploaded 8 Jul 2024Source
  • 28 Building Plan Approval / NA Order for plotted developmentP52100034995 · 9-11.pdf · uploaded 8 Jul 2024Source
  • 29 Building Plan Approval / NA Order for plotted developmentP52100034995 · 10-11.pdf · uploaded 8 Jul 2024Source
  • 30 Building Plan Approval / NA Order for plotted developmentP52100034995 · 11-11.pdf · uploaded 8 Jul 2024Source
  • 5 Commencement Certificates / NA Order for plotted developmentP52100034995 · COMMENCEMENT CERTIFICATE -07-06-2024_compressed.pdf · uploaded 8 Jul 2024Source
  • 11 Copy of Layout Approval (in case of layout)P52100024817 · 1_compressed (1).pdf · uploaded 8 Jul 2024Source
  • 12 Copy of Layout Approval (in case of layout)P52100024817 · 1-11.pdf · uploaded 8 Jul 2024Source
  • 40 Building Plan Approval / NA Order for plotted developmentP52100024817 · 2-11.pdf · uploaded 8 Jul 2024Source
  • 41 Building Plan Approval / NA Order for plotted developmentP52100024817 · 3-11.pdf · uploaded 8 Jul 2024Source
  • 42 Building Plan Approval / NA Order for plotted developmentP52100024817 · 4-11.pdf · uploaded 8 Jul 2024Source
  • 43 Building Plan Approval / NA Order for plotted developmentP52100024817 · 5-11.pdf · uploaded 8 Jul 2024Source
  • 44 Building Plan Approval / NA Order for plotted developmentP52100024817 · 6-11.pdf · uploaded 8 Jul 2024Source
  • 45 Building Plan Approval / NA Order for plotted developmentP52100024817 · 7-11.pdf · uploaded 8 Jul 2024Source
  • 46 Building Plan Approval / NA Order for plotted developmentP52100024817 · 8-11.pdf · uploaded 8 Jul 2024Source
  • 47 Building Plan Approval / NA Order for plotted developmentP52100024817 · 9-11.pdf · uploaded 8 Jul 2024Source
  • 48 Building Plan Approval / NA Order for plotted developmentP52100024817 · 10-11.pdf · uploaded 8 Jul 2024Source
  • 49 Building Plan Approval / NA Order for plotted developmentP52100024817 · 11-11.pdf · uploaded 8 Jul 2024Source
  • 10 Commencement Certificates / NA Order for plotted developmentP52100024817 · COMMENCEMENT CERTIFICATE -07-06-2024_compressed.pdf · uploaded 8 Jul 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 11 Jul 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PH-3.pdf · uploaded 11 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034464 · FORM 2A - VERTICA PH-3-JUNE 2024.pdf · uploaded 11 Jul 2024Source
  • 4 Disclosure of sold/ booked inventoryP52100034464 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-3.pdf · uploaded 11 Jul 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PH-3.pdf · uploaded 11 Jul 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 11 Jul 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PH-2.pdf · uploaded 11 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034995 · FORM 2A - VERTICA PH-2-JUNE 2024.pdf · uploaded 11 Jul 2024Source
  • 6 Disclosure of sold/ booked inventoryP52100034995 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-2.pdf · uploaded 11 Jul 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PH-2.pdf · uploaded 11 Jul 2024Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 11 Jul 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 11 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100024817 · FORM 2A - VERTICA PH-1-JUNE 2024.pdf · uploaded 11 Jul 2024Source
  • 7 Disclosure of sold/ booked inventoryP52100024817 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-1.pdf · uploaded 11 Jul 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 11 Jul 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034464 · FORM 2A - VERTICA PH-3-SEPT 2024.pdf · uploaded 7 Oct 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034995 · FORM 2A - VERTICA PH-2-SEPT 2024.pdf · uploaded 7 Oct 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100024817 · FORM 2A - VERTICA PH-1-SEPT 2024.pdf · uploaded 7 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100034464 · FORM 5 VERTICA PH 3 SEPT-24.pdf · uploaded 9 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100034995 · FORM 5 VERTICA PH 2 SEPT-24.pdf · uploaded 9 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100024817 · FORM 5 VERTICA PH 1 SEPT-24.pdf · uploaded 9 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PH-3.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA-PH-3.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100034464 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-3.pdf · uploaded 19 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PH-2.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA-PH-2.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100034995 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-2.pdf · uploaded 19 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA-PH-1.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100024817 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-1.pdf · uploaded 19 Oct 2024Source
  • 1 Declaration in FORM BP52100024817 · FORM B VERTICA PH-1.pdf · uploaded 16 Nov 2024Source
  • 1 Declaration in FORM BP52100024817 · FORM B VERTICA PH-1.pdf · uploaded 16 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034464 · FORM 2A - VERTICA PH-3-DEC 2024.pdf · uploaded 11 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034995 · FORM 2A - VERTICA PH-2-DEC 2024.pdf · uploaded 11 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100024817 · FORM 2A - VERTICA PH-1-DEC 2024.pdf · uploaded 11 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 16 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PH-3.pdf · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PH-3.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 16 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PH-2.pdf · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PH-2.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 16 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 14 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034464 · CA CERTIFICATE VERTICA PH-3.pdf · uploaded 14 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034464 · ENGG CERTIFICATE VERTICA PH-3.pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100034464 · DISCLOSER OF SOLD INVENTORY VERTICA PH-3.pdf · uploaded 14 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034464 · FORM 2A - VERTICA PH-3-MAR 2025.pdf · uploaded 14 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 14 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034995 · CA CERTIFICATE VERTICA PH-2.pdf · uploaded 14 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034995 · ENGG CERTIFICATE VERTICA PH-2.pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100034995 · DISCLOSER OF SOLD INVENTORY VERTICA PH-2.pdf · uploaded 14 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034995 · FORM 2A - VERTICA PH-2-MAR 2025.pdf · uploaded 14 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 14 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 14 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100024817 · DISCLOSER OF SOLD INVENTORY VERTICA PH-1.pdf · uploaded 14 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100024817 · FORM 2A - VERTICA PH-1-MAR 2025.pdf · uploaded 14 Apr 2025Source
  • Form 1P52100034464 · ARCH CERTIFICATE VERTICA PH-3-JUN-24.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100034464 · ARCH CERTIFICATE VERTICA PH-3-SEPT-24.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100034464 · ARCH CERTIFICATE VERTICA PH-3-DEC-24.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100034464 · ARCH CERTIFICATE VERTICA PH-3-MAR-25.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100034464 · ENGG CERTIFICATE VERTICA PH-3-JUN-24.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100034464 · ENGG CERTIFICATE VERTICA-PH-3-SEPT-24.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100034464 · ENGG CERTIFICATE VERTICA PH-3-DEC-24.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100034464 · ENGG CERTIFICATE VERTICA PH-3-MAR-25.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100034464 · CA CERTIFICATE VERTICA PH-3-JUN-24.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100034464 · CA CERTIFICATE VERTICA PH-3-SEPT-24.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100034464 · CA CERTIFICATE VERTICA PH-3-DEC-24.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100034464 · CA CERTIFICATE VERTICA PH-3-MAR-25.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100034464 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-3-JUN-24.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100034464 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-3-SEPT-24.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100034464 · DISCLOSER OF SOLD INVENTORY VERTICA PH-3-DEC-24.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100034464 · DISCLOSER OF SOLD INVENTORY VERTICA PH-3-MAR-25.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100034995 · ARCH CERTIFICATE VERTICA PH-2-SEPT-24.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100034995 · ARCH CERTIFICATE VERTICA PH-2-DEC-24.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100034995 · ARCH CERTIFICATE VERTICA PH-2-MAR-25.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100034995 · ENGG CERTIFICATE VERTICA PH-2.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100034995 · ENGG CERTIFICATE VERTICA-PH-2-SEPT-24.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100034995 · ENGG CERTIFICATE VERTICA PH-2-DEC-24.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100034995 · ENGG CERTIFICATE VERTICA PH-2-MAR-25.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100034995 · CA CERTIFICATE VERTICA PH-2.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100034995 · CA CERTIFICATE VERTICA PH-2-SEPT-24.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100034995 · CA CERTIFICATE VERTICA PH-2-DEC-24.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100034995 · CA CERTIFICATE VERTICA PH-2-MAR-25.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100034995 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-2.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100034995 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-2-SEPT-24.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100034995 · DISCLOSER OF SOLD INVENTORY VERTICA PH-2-DEC-24-DEC-24.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100034995 · DISCLOSER OF SOLD INVENTORY VERTICA PH-2-MAR-25.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 1P52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100024817 · ENGG CERTIFICATE VERTICA-PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 2P52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Form 3P52100024817 · CA CERTIFICATE VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100024817 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100024817 · DISCLOSURE OF SOLD INVENTORY VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100024817 · DISCLOSER OF SOLD INVENTORY VERTICA PH-1-DEC-24.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52100024817 · DISCLOSER OF SOLD INVENTORY VERTICA PH-1.pdf · uploaded 23 Jun 2025Source
  • Withdrawal Update Form 1P52100034464 · ARCH CERTIFICATE VERTICA PHASE -3-JUN-25.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 2P52100034464 · ENGG CERTIFICATE VERTICA PH-3-JUN-2025.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 3P52100034464 · CA CERTIFICATE VERTICA PH-3-JUN-25.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 1P52100024817 · ARCH CERTIFICATE VERTICA PHASE -1-JUN-25.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 1P52100024817 · ARCH CERTIFICATE VERTICA PHASE -1-JUN-25.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 2P52100024817 · ENGG CERTIFICATE VERTICA PH-1-JUN-2025.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 2P52100024817 · ENGG CERTIFICATE VERTICA PH-1-JUN-2025.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 3P52100024817 · CA CERTIFICATE VERTICA PH-1-JUN-25.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 3P52100024817 · CA CERTIFICATE VERTICA PH-1-JUN-25.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 1P52100034995 · ARCH CERTIFICATE VERTICA PHASE -2-JUN-25.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 2P52100034995 · ENGG CERTIFICATE VERTICA PH-2-JUN-2025.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 3P52100034995 · CA CERTIFICATE VERTICA PH-2-JUN-25.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 1P52100034464 · ARCH CERTIFICATE -SEPT-25-VERTICA PH-3.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 2P52100034464 · ENGG CERTIFICATE -SEPT-25-VERTICA PH-3.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 3P52100034464 · CA CERTIFICATE VERTICA-PH-3-SEPT-25.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 1P52100034995 · ARCH CERTIFICATE -SEPT-25-VERTICA PH-2.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 2P52100034995 · ENGG CERTIFICATE -SEPT-25-VERTICA PH-2.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 3P52100034995 · CA CERTIFICATE VERTICA-PH-2-SEPT-25.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 1P52100024817 · ARCH CERTIFICATE -SEPT-25-VERTICA PH-1.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 2P52100024817 · ENGG CERTIFICATE -SEPT-25-VERTICA PH-1.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 3P52100024817 · CA CERTIFICATE VERTICA-PH-1-SEPT-25.pdf · uploaded 14 Oct 2025Source
  • Form 5 (FY 2024-2025)P52100034464 · FORM 5- VERTICA PH-3-16-10-2025.pdf · uploaded 17 Oct 2025Source
  • Form 5 (FY 2024-2025)P52100034995 · FORM 5- VERTICA PH-2-16-10-2025.pdf · uploaded 17 Oct 2025Source
  • Form 5 (FY 2024-2025)P52100024817 · FORM 5- VERTICA PH-1-16-10-2025.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 1P52100034464 · ARCH CERTIFICATE VERTICA-PH-3-DEC-25.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 2P52100034464 · ENGG CERTIFICATE VERTICA-PH-3-DEC-25.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 3P52100034464 · CA CERTIFICATE VERTICA PHASE -3-DEC-25.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 1P52100034995 · ARCH CERTIFICATE VERTICA-PH-2-DEC-25.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 2P52100034995 · ENGG CERTIFICATE VERTICA-PH-2-DEC-25.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 3P52100034995 · CA CERTIFICATE VERTICA PHASE -2-DEC-25.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 1P52100024817 · ARCH CERTIFICATE VERTICA-PH-1-DEC-25.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 2P52100024817 · ENGG CERTIFICATE VERTICA-PH-1-DEC-25.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 3P52100024817 · CA CERTIFICATE VERTICA PHASE -1-DEC-25.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 1P52100034464 · ARCH CERTIFICATE VERTICA PH-3-MAR-2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 2P52100034464 · ENGG CERTIFICATE VERTICA PH-3-MAR-2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 3P52100034464 · CA CERTIFICATE VERTICA PH-3-MAR-2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 1P52100034995 · ARCH CERTIFICATE VERTICA PH-2-MAR-2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 2P52100034995 · ENGG CERTIFICATE VERTICA PH-2-MAR-2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 3P52100034995 · CA CERTIFICATE VERTICA PH-2-MAR-2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 1P52100024817 · ARCH CERTIFICATE VERTICA PH-1-MAR-2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 2P52100024817 · ENGG CERTIFICATE VERTICA PH-1-MAR-2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 3P52100024817 · CA CERTIFICATE VERTICA PH-1-MAR-2026.pdf · uploaded 16 Apr 2026Source
  • Form 2A (FY 2025-2026)P52100034464 · Form 2A-VERTICA PHASE -3.pdf · uploaded 22 Apr 2026Source
  • Form 5 (FY 2025-2026)P52100034464 · FORM-5-VERTICA PH-3-MAR-26.pdf · uploaded 22 Apr 2026Source
  • Form 2A (FY 2025-2026)P52100024817 · Form 2A-VERTICA PHASE -1.pdf · uploaded 7 May 2026Source
  • Form 2A (FY 2025-2026)P52100034995 · FORM 2A-VERTICA PH-2-MAR-2026.pdf · uploaded 9 May 2026Source
  • Withdrawal Update Form 1P52100034464 · ARCH CERTIFICATE-VERTICA-PH-3-JUN-26.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 2P52100034464 · ENGG CERTIFICATE-VERTICA-PH-3-JUN-2026.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 3P52100034464 · CA CERTIFICATE-VERTICA-PH-3-JUN-26.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 1P52100034995 · ARCH CERTIFICATE-VERTICA-PH-2-JUN-26.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 2P52100034995 · ENGG CERTIFICATE-VERTICA-PH-2-JUN-2026.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 3P52100034995 · CA CERTIFICATE-VERTICA-PH-2-JUN-26.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 1P52100024817 · ARCH CERTIFICATE-VERTICA-PH-1-JUN-26.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 2P52100024817 · ENGG CERTIFICATE-VERTICA-PH-1-JUN-2026.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 3P52100024817 · CA CERTIFICATE-VERTICA-PH-1-JUN-2026.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 1P52100034995 · ARCH CERTIFICATE-VERTICA-PH-2-JUN-26.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 1P52100034995 · ARCH CERTIFICATE-VERTICA-PH-2-JUN-26.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 2P52100034995 · ENGG CERTIFICATE-VERTICA-PH-2-JUN-2026.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 2P52100034995 · ENGG CERTIFICATE-VERTICA-PH-2-JUN-2026.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 3P52100034995 · CA CERTIFICATE-VERTICA-PH-2-JUN-26.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 3P52100034995 · REVISED-FORM-3-VERTICA PHASE-2-JUN-26 DATED-22-7-26.pdf · uploaded 22 Jul 2026Source
  • Form 5 (FY 2025-2026)P52100024817 · FORM-5-VERTICA PH-1-MAR-26.pdf · uploaded 22 Jul 2026Source
  • Form 5 (FY 2025-2026)P52100034995 · FORM-5-VERTICA -PH-2-MAR-26.pdf · uploaded 23 Jul 2026Source

Technical

  • DocumentP52100024817 · 1.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 2.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 3.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 1-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 2-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 3-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 4-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 5-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 6-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 7-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 8-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 9-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 10-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 11-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 12-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 13-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 14-19.PDF · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 15-19.PDF · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 16-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 17-19.pdf · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 18-19.PDF · uploaded 31 Jan 2020Source
  • DocumentP52100024817 · 19-19.PDF · uploaded 31 Jan 2020Source
  • DocumentP52100034995 · 1-2 IOD.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 2-2 IOD.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 1-9.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 2-9.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 3-9.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 4-9.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 5-9.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 6-9.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 7-9.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 8-9.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100034995 · 9-9.pdf · uploaded 25 Feb 2022Source
  • DocumentP52100024817 · IOD-1-2.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · IOD 2-2.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · 1-9.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · 1-9.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · 2-9.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · 4-9.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · 5-9.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · 6-9.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · 7-9.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · 8-9.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100024817 · 9-9.pdf · uploaded 7 Mar 2022Source
  • DocumentP52100034464 · IOD-1-2.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · IOD 2-2.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · 1-9.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · 2-9.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · 3-9.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · 4-9.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · 5-9.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · 6-9.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · 7-9.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · 8-9.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100034464 · 9-9.pdf · uploaded 8 Mar 2022Source
  • DocumentP52100024817 · 1-6 -LAYOUT.pdf · uploaded 1 Dec 2023Source
  • DocumentP52100024817 · 2-6- PARKING PLAN.pdf · uploaded 1 Dec 2023Source
  • DocumentP52100024817 · 3-6 - GROUND AND MEZZ FLOOR.pdf · uploaded 1 Dec 2023Source
  • DocumentP52100024817 · 4-6- 1ST TO 5TH FLOOR.pdf · uploaded 1 Dec 2023Source
  • DocumentP52100024817 · 5-6 6TH FLOOR.pdf · uploaded 1 Dec 2023Source
  • DocumentP52100024817 · 6-6 SECTION PLAN.pdf · uploaded 1 Dec 2023Source
  • DocumentP52100034464 · 1-6 -LAYOUT.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034464 · 1-7.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034464 · 3-6 - GROUND AND MEZZ FLOOR.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034464 · 4-6- 1ST TO 5TH FLOOR.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034464 · 2-6- PARKING PLAN.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034464 · 5-6 6TH FLOOR.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034464 · 6-6 SECTION PLAN.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034995 · 1-6 -LAYOUT.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034995 · 1-7.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034995 · 2-6- PARKING PLAN.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034995 · 3-6 - GROUND AND MEZZ FLOOR.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034995 · 4-6- 1ST TO 5TH FLOOR.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034995 · 5-6 6TH FLOOR.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100034995 · 6-6 SECTION PLAN.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100024817 · 1_compressed.pdf · uploaded 2 Dec 2023Source
  • DocumentP52100024817 · 1-6 -LAYOUT.pdf · uploaded 13 Dec 2023Source
  • DocumentP52100034464 · 1-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034464 · 2-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034464 · 3-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034464 · 4-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034464 · 5-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034464 · 6-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034464 · 7-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034464 · 8-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034995 · 1-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034995 · 2-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034995 · 3-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034995 · 4-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034995 · 5-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034995 · 6-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034995 · 7-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034995 · 8-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100024817 · 1-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100024817 · 2-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100024817 · 3-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100024817 · 4-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100024817 · 5-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100024817 · 6-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100024817 · 7-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100024817 · 8-8.pdf · uploaded 12 Feb 2024Source
  • DocumentP52100034464 · 1-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 1_compressed (1).pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 2-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 3-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 4-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 5-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 6-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 7-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 8-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 9-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 10-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034464 · 11-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 1_compressed (1).pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 1-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 2-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 3-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 4-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 5-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 6-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 7-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 8-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 9-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 10-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100034995 · 11-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 1_compressed (1).pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 2-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 3-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 4-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 5-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 6-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 7-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 8-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 9-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 10-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 11-11.pdf · uploaded 8 Jul 2024Source
  • DocumentP52100024817 · 1-11 LAYOUT.pdf · uploaded 11 Apr 2026Source
  • DocumentP52100034464 · 1-13.pdf · uploaded 25 Apr 2026Source
  • DocumentP52100034464 · ANNEXURE A- DECLARATION-CUM-UNDERTAKING-ORDER 50.pdf · uploaded 25 Apr 2026Source
  • DocumentP52100034995 · 1-13.pdf · uploaded 29 Apr 2026Source
  • DocumentP52100034995 · 2-13-BASEMENT 2 AND 1.pdf · uploaded 29 Apr 2026Source
  • DocumentP52100034995 · 3-13-GROUND AND MEZZ.pdf · uploaded 29 Apr 2026Source
  • DocumentP52100034995 · 6-13-4TH AND 5TH FLOOR.pdf · uploaded 29 Apr 2026Source
  • DocumentP52100034995 · 7-13-6TH AND 7TH FLOOR.pdf · uploaded 29 Apr 2026Source
  • DocumentP52100034995 · 8-13-8TH AND 9TH FLOOR.pdf · uploaded 29 Apr 2026Source
  • DocumentP52100034995 · 9-13-10TH-11TH-12TH-14TH-15TH AND 16TH FLOOR.pdf · uploaded 29 Apr 2026Source
  • DocumentP52100034995 · 13-13-SECTION PLAN.pdf · uploaded 29 Apr 2026Source
  • DocumentP52100034995 · ANNEXURE A- DECLARATION-CUM-UNDERTAKING-ORDER 50-VERTICA PH-2.pdf · uploaded 29 Apr 2026Source
  • DocumentP52100034464 · 9-13-10TH-11TH-12TH-14TH-15TH-16TH FLOOR.pdf · uploaded 2 May 2026Source
  • DocumentP52100034464 · 10-13-13TH-17TH AND TERRACE FLOOR.pdf · uploaded 2 May 2026Source
  • DocumentP52100034464 · 11-13-TOP TERRACE.pdf · uploaded 2 May 2026Source
  • DocumentP52100034464 · 13-13-ELEVATION.pdf · uploaded 2 May 2026Source
  • DocumentP52100024817 · 1-13.pdf · uploaded 22 Jul 2026Source
  • DocumentP52100024817 · 2-13-BASEMENT 2 AND 1.pdf · uploaded 22 Jul 2026Source
  • DocumentP52100024817 · 3-13-GROUND AND MEZZ.pdf · uploaded 22 Jul 2026Source
  • DocumentP52100024817 · 4-13-PAPRKING LEVEL1 AND 3.pdf · uploaded 22 Jul 2026Source
  • DocumentP52100024817 · 5-13-1ST-2ND AND 3RD FLOOR.pdf · uploaded 22 Jul 2026Source
  • DocumentP52100024817 · 13-13-SECTION PLAN.pdf · uploaded 22 Jul 2026Source
  • DocumentP52100024817 · ANNEXURE A- DECLARATION-CUM-UNDERTAKING-ORDER 50.pdf · uploaded 22 Jul 2026Source

Technical (Architect)

  • DocumentP52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 16 Jan 2025Source
  • DocumentP52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 16 Jan 2025Source
  • DocumentP52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 16 Jan 2025Source
  • DocumentP52100034464 · ARCH CERTIFICATE VERTICA PH-3.pdf · uploaded 14 Apr 2025Source
  • DocumentP52100034995 · ARCH CERTIFICATE VERTICA PH-2.pdf · uploaded 14 Apr 2025Source
  • DocumentP52100024817 · ARCH CERTIFICATE VERTICA PH-1.pdf · uploaded 14 Apr 2025Source
  • DocumentP52100034464 · ARCH CERTIFICATE-VERTICA-PH-3-JUN-26.pdf · uploaded 11 Jul 2026Source
  • DocumentP52100034995 · ARCH CERTIFICATE-VERTICA-PH-2-JUN-26.pdf · uploaded 11 Jul 2026Source
  • DocumentP52100024817 · ARCH CERTIFICATE-VERTICA-PH-1-JUN-26.pdf · uploaded 16 Jul 2026Source

Technical (Engineer)

  • DocumentP52100034464 · ENGG CERTIFICATE VERTICA-PH-3.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100034995 · ENGG CERTIFICATE VERTICA-PH-2.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100024817 · ENGG CERTIFICATE VERTICA-PH-1.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100034464 · ENGG CERTIFICATE VERTICA PH-3.pdf · uploaded 16 Jan 2025Source
  • DocumentP52100034995 · ENGG CERTIFICATE VERTICA PH-2.pdf · uploaded 16 Jan 2025Source
  • DocumentP52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 16 Jan 2025Source
  • DocumentP52100034464 · ENGG CERTIFICATE VERTICA PH-3.pdf · uploaded 14 Apr 2025Source
  • DocumentP52100034995 · ENGG CERTIFICATE VERTICA PH-2.pdf · uploaded 14 Apr 2025Source
  • DocumentP52100024817 · ENGG CERTIFICATE VERTICA PH-1.pdf · uploaded 14 Apr 2025Source
  • DocumentP52100034464 · ENGG CERTIFICATE-VERTICA-PH-3-JUN-2026.pdf · uploaded 11 Jul 2026Source
  • DocumentP52100034995 · ENGG CERTIFICATE-VERTICA-PH-2-JUN-2026.pdf · uploaded 11 Jul 2026Source
  • DocumentP52100024817 · ENGG CERTIFICATE-VERTICA-PH-1-JUN-2026.pdf · uploaded 16 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals23/3/1, 23/3/1/2

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Phases
3
Unit types
Food and beverage 1, Food and beverage 2, Food and beverage 3, Food and beverage 4, Food and beverage 5, Food and beverage 6, Office space, Showroom126 units in all
Address
23/3/1/3 23/3/1/6 23/3/1/7, 23/5/1/22 23/4A/1/9, 23/4A/1/7 23/3/5/3 23/3/5B 23/3/4 23/3/3 23/3/1(P) 23/3/1/8 23/3/1/2 23/3/1/1 23/3/5/1 23/3/1/5 23/3/1/4 23/5/1/13 23/5/1/30 23/4A/1/8 23/4A/19 23/3/2 23/5/10 23/3/1 23/3/6 23/5/11 23/5/12 23/5/1/33, Balewadi Stadium Road, BalewadiPIN 411045
Village
Balewadi, Haveli taluka
Designated bank account
171
Developed in phases
No
Also registered as
Vertica Phase 1, Vertica Phase 2, Vertica Phase 3

Survey, CTS, gat or plot numbers

23/3/123/3/1/223/3/1/423/3/1/523/3/1/623/3/1/723/3/1/823/3/1p23/3/223/3/323/3/423/3/5/123/3/5/323/3/5B23/3/623/4A/1/723/4a/1/823/4A/1/923/4A/1923/5/1023/5/1123/5/1/1323/5/1223/5/1/2223/5/1/3325/5/1/30Sr. No – 23/3/1/3

Boundaries

North
Adj Sr No 23 Part
South
Adj Sr No 23 Part
East
Adj Sr No 4 and 20
West
Adj 18 Mtr DP Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking126 units

16 of 126 units booked (13%), as the promoter reported to MahaRERA

Food and beverage 1 · 1 unitFood and beverage 2 · 1 unitFood and beverage 3 · 1 unitFood and beverage 4 · 1 unitFood and beverage 5 · 1 unitFood and beverage 6 · 1 unitOffice space · 119 unitsShowroom · 1 unit
RERABuildingTypeCarpet areaUnitsBooked
P52100024817Vertica Phase 1Food and beverage 1199.2 sq m · 2,144 sq ft10
P52100024817Vertica Phase 1Food and beverage 2159.7 sq m · 1,719 sq ft10
P52100024817Vertica Phase 1Food and beverage 3179.15 sq m · 1,928 sq ft10
P52100024817Vertica Phase 1Food and beverage 4160.32 sq m · 1,726 sq ft10
P52100024817Vertica Phase 1Food and beverage 5142.72 sq m · 1,536 sq ft10
P52100024817Vertica Phase 1Food and beverage 6184.92 sq m · 1,990 sq ft10
P52100024817Vertica Phase 1Office space328.06 sq m · 3,531 sq ft31
P52100024817Vertica Phase 1Office space456.18 sq m · 4,910 sq ft30
Show all 41 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P52100024817Vertica Phase 1Office space485.7 sq m · 5,228 sq ft10
P52100024817Vertica Phase 1Office space493.71 sq m · 5,314 sq ft30
P52100024817Vertica Phase 1Office space500.04 sq m · 5,382 sq ft30
P52100024817Vertica Phase 1Office space551.54 sq m · 5,937 sq ft30
P52100024817Vertica Phase 1Office space564.48 sq m · 6,076 sq ft20
P52100024817Vertica Phase 1Office space844.84 sq m · 9,094 sq ft30
P52100024817Vertica Phase 1Showroom1,331.6 sq m · 14,333 sq ft10
P52100034995Vertica Phase 2Office space318.13 sq m · 3,424 sq ft20
P52100034995Vertica Phase 2Office space328.06 sq m · 3,531 sq ft64
P52100034995Vertica Phase 2Office space446.72 sq m · 4,808 sq ft20
P52100034995Vertica Phase 2Office space456.18 sq m · 4,910 sq ft63
P52100034995Vertica Phase 2Office space478.64 sq m · 5,152 sq ft20
P52100034995Vertica Phase 2Office space483.78 sq m · 5,207 sq ft20
P52100034995Vertica Phase 2Office space485.7 sq m · 5,228 sq ft22
P52100034995Vertica Phase 2Office space493.71 sq m · 5,314 sq ft32
P52100034995Vertica Phase 2Office space493.72 sq m · 5,314 sq ft30
P52100034995Vertica Phase 2Office space500.04 sq m · 5,382 sq ft60
P52100034995Vertica Phase 2Office space528.87 sq m · 5,693 sq ft20
P52100034995Vertica Phase 2Office space551.54 sq m · 5,937 sq ft32
P52100034995Vertica Phase 2Office space551.55 sq m · 5,937 sq ft31
P52100034995Vertica Phase 2Office space555.54 sq m · 5,980 sq ft20
P52100034995Vertica Phase 2Office space564.48 sq m · 6,076 sq ft41
P52100034995Vertica Phase 2Office space694.21 sq m · 7,472 sq ft20
P52100034995Vertica Phase 2Office space714.17 sq m · 7,687 sq ft30
P52100034995Vertica Phase 2Office space844.84 sq m · 9,094 sq ft30
P52100034464Vertica Phase 3Office space318.13 sq m · 3,424 sq ft60
P52100034464Vertica Phase 3Office space446.72 sq m · 4,808 sq ft60
P52100034464Vertica Phase 3Office space476.76 sq m · 5,132 sq ft20
P52100034464Vertica Phase 3Office space478.64 sq m · 5,152 sq ft60
P52100034464Vertica Phase 3Office space483.78 sq m · 5,207 sq ft60
P52100034464Vertica Phase 3Office space528.87 sq m · 5,693 sq ft60
P52100034464Vertica Phase 3Office space555.54 sq m · 5,980 sq ft40
P52100034464Vertica Phase 3Office space694.21 sq m · 7,472 sq ft60

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals9

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectAna Consortium Pvt Ltd Avinash Navate—P52100034464
ArchitectAna Consortium Pvt Ltd Avinash Navate—P52100034995
ArchitectAvinash Nawathe—P52100024817
Chartered accountantCA Niraj Nawandhar—P52100034995
Chartered accountantCA Niraj Nawandhar—P52100024817
Chartered accountantCA Niraj Nawandhar—P52100034464
EngineerAjay T Mahajan—P52100024817
EngineerAjay T Mahajan—P52100034464
EngineerAjay T Mahajan—P52100034995

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology