Completion was pushed back 4 months, to Jul 2028; no MahaRERA orders on record; 14% of its units are booked.

Balewadi, Pune 411045 · Property rates in Balewadi · Promoter: M/S Srk Constructions

DeliveryExtended 4 moPromised Mar 2028 · now due Jul 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales14% booked2 of 14 units · as the promoter reported to MahaRERA

Completion was pushed back 4 months, to Jul 2028

  • This projectRegistered 9 May 2023, completion promised 31 Mar 2028, revised to 31 Jul 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100050855
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000508559 May 202331 Mar 202831 Jul 2028M/S Srk ConstructionsProject page
Documents129

1 document held by Deedo, 128 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardSRK Construction Pan.pdf · uploaded 31 Mar 2023Source

Legal

  • Legal Title reportFormat A Title Report Flow.pdf · uploaded 31 Mar 2023Source
  • Legal Title reportSearch Report - 2023.pdf · uploaded 14 Apr 2023Source
  • Declaration Form BForm B.pdf · uploaded 14 Apr 2023Source

Migrated

  • 1 PAN CardSRK Construction Pan.pdf · uploaded 31 Mar 2023Source
  • 1 Copy of the legal title reportFormat A Title Report Flow.pdf · uploaded 31 Mar 2023Source
  • 1 Copy of Layout Approval (in case of layout)Updated Plan - March 2023.pdf · uploaded 31 Mar 2023Source
Show all 129 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentUpdated Sections - March 2023.pdf · uploaded 31 Mar 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentUpdated Commencement Certificate - March 2023.pdf · uploaded 31 Mar 2023Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance Certificate.pdf · uploaded 13 Apr 2023Source
  • 2 a Details of encumbrances concerned to FinanceLegal Encum.pdf · uploaded 13 Apr 2023Source
  • 1 b Details of encumbrances concerned to LegalEncumbrance Certificate.pdf · uploaded 13 Apr 2023Source
  • 2 b Details of encumbrances concerned to LegalLegal Encum.pdf · uploaded 13 Apr 2023Source
  • 2 Copy of the legal title reportSearch Report - 2023.pdf · uploaded 14 Apr 2023Source
  • 1 Declaration about Commencement CertificateCCD.pdf · uploaded 14 Apr 2023Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 14 Apr 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Certificate.pdf · uploaded 14 Apr 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng CErtificate.pdf · uploaded 14 Apr 2023Source
  • 1 CERSAI detailsCERSAI Declaration.pdf · uploaded 14 Apr 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CErtificate - SRK_compressed.pdf · uploaded 14 Apr 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsSalil Bhat Anex A.pdf · uploaded 14 Apr 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsRAM Kolapkar Anex A.pdf · uploaded 14 Apr 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsShubhangi Bhat Anex A.pdf · uploaded 14 Apr 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsKrishna Patil Anex A.pdf · uploaded 14 Apr 2023Source
  • 1 Proforma of Agreement for saleAFS.pdf · uploaded 14 Apr 2023Source
  • 1 Proforma of Allotment letterAllot Letter.pdf · uploaded 14 Apr 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Ac details.pdf · uploaded 14 Apr 2023Source
  • 1 Deviation Report with respect to Allotment letterAL DEV Report.pdf · uploaded 14 Apr 2023Source
  • 1 Deviation Report with respect to model copy of AgreementAFS -DEV Report.pdf · uploaded 14 Apr 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 SRK Gold 30-06-2023.pdf · uploaded 14 Sep 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 SRK GOLD 30-06-2023.pdf · uploaded 14 Sep 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SRK GOLD 30-06-2023.pdf · uploaded 14 Sep 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate 15-09-23.pdf · uploaded 16 Sep 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 16 Sep 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 16 Sep 2023Source
  • 1 Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 16 Sep 2023Source
  • 2 Disclosure of sold/ booked inventoryInventory Sold Unsold RERA Qtry Update v1 (Apr -June).pdf · uploaded 20 Sep 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SRK GOLD.pdf · uploaded 12 Oct 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA Qtr 5-11.pdf · uploaded 12 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)RERA 12-14.pdf · uploaded 12 Oct 2023Source
  • 3 Disclosure of sold/ booked inventorySRK GOLD SOLD UNSOLD SEPTEMBER.pdf · uploaded 12 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Qtr 15-20.pdf · uploaded 12 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 (2).pdf · uploaded 12 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)SRK GOLD FORM 1.pdf · uploaded 27 Jan 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)SRF GOLD FORM 2.pdf · uploaded 27 Jan 2024Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD SRK.pdf · uploaded 27 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)241_compressed.pdf · uploaded 27 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 3 May 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 3 May 2024Source
  • 5 Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 3 May 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 3 May 2024Source
  • 1 Copy of Layout Approval (in case of layout)Revised Sanction Plan 12-04-2024.pdf · uploaded 8 Feb 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentRevised CC 12-04-2024.pdf · uploaded 8 Feb 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentRevised Sanction Plan2 12-04-2024.pdf · uploaded 8 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q1 Jun 2024.pdf · uploaded 15 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q2 Sep 2024.pdf · uploaded 15 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q3 Dec 2024.pdf · uploaded 15 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Q1 Jun 2024.pdf · uploaded 15 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Q2 Sep 2024.pdf · uploaded 15 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Q3 Dec 2024.pdf · uploaded 15 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Q3 Dec 2024.pdf · uploaded 15 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Q2 Sep 2024.pdf · uploaded 15 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Q1 Jun 2024.pdf · uploaded 15 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory Q1 JUN 2024.pdf · uploaded 15 Feb 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory Q2 SEP 2024.pdf · uploaded 15 Feb 2025Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory Q3 DEC 2024.pdf · uploaded 15 Feb 2025Source
  • 1 Declaration about Commencement CertificateFormat D - SRK Commencement Declaration 2024.pdf · uploaded 15 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A 2023 2024.pdf · uploaded 15 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 20 Feb 2025Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023 2024.pdf · uploaded 22 Feb 2025Source
  • Form 1Form-1 Q1 Jun 2024.pdf · uploaded 9 Jun 2026Source
  • Form 2Form-2 Q1 Jun 2024.pdf · uploaded 9 Jun 2026Source
  • Form 3Form-3 Q1 Jun 2024.pdf · uploaded 9 Jun 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory Q1 JUN 2024.pdf · uploaded 9 Jun 2026Source
  • Form 1Form-1 Q2 Sep 2024.pdf · uploaded 9 Jun 2026Source
  • Form 2Form-2 Q2 Sep 2024.pdf · uploaded 9 Jun 2026Source
  • Form 3Form-3 Q2 Sep 2024.pdf · uploaded 9 Jun 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory Q2 SEP 2024.pdf · uploaded 9 Jun 2026Source
  • Form 1Form-1 Q3 Dec 2024.pdf · uploaded 9 Jun 2026Source
  • Form 2Form-2 Q3 Dec 2024.pdf · uploaded 9 Jun 2026Source
  • Form 3Form-3 Q3 Dec 2024.pdf · uploaded 9 Jun 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory Q3 DEC 2024.pdf · uploaded 9 Jun 2026Source
  • Form 1Form-1 Q1 Jun 2023.pdf · uploaded 9 Jun 2026Source
  • Form 2Form-2 Q1 Jun 2023.pdf · uploaded 9 Jun 2026Source
  • Form 3Form-3 Q1 Jun 2023.pdf · uploaded 9 Jun 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory Q1 Jun 2023.pdf · uploaded 9 Jun 2026Source
  • Form 1Form-1 Q2 Sep 2023.pdf · uploaded 9 Jun 2026Source
  • Form 2Form-2 Q2 Sep 2023.pdf · uploaded 9 Jun 2026Source
  • Form 3Form-3 Q2 Sep 2023.pdf · uploaded 9 Jun 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory Q2 Sep 2023.pdf · uploaded 9 Jun 2026Source
  • Form 1Form-1 Q3 Dec 2023.pdf · uploaded 9 Jun 2026Source
  • Form 2Form-2 Q3 Dec 2023.pdf · uploaded 9 Jun 2026Source
  • Form 3Form-3 Q3 Dec 2023.pdf · uploaded 9 Jun 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory Q3 Dec 2023.pdf · uploaded 9 Jun 2026Source
  • Form 1Form-1 Q4 Mar 2024.pdf · uploaded 9 Jun 2026Source
  • Form 2Form-2 Q4 Mar 2024.pdf · uploaded 9 Jun 2026Source
  • Form 3Form-3 Q4 Mar 2024.pdf · uploaded 9 Jun 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory Q4 Mar 2024.pdf · uploaded 9 Jun 2026Source
  • Form 1Form-1 Q4 Mar 2025.pdf · uploaded 9 Jun 2026Source
  • Form 2Form-2 Q4 Mar 2025.pdf · uploaded 9 Jun 2026Source
  • Form 3Form-3 Q4 Mar 2025..pdf · uploaded 9 Jun 2026Source
  • Disclosure of Sold and Booked InventoryInventory Sold Unsold format MAR 25.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 1Form-1 Q1 Jun 2025.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 1Form-1 Q2 Sep 2025.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 2Form-2 Q1 Jun 2025.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 2Form-2 Q2 Sep 2025.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 3Form-3 Q2 Sep 2025..pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 1Form-1 Q3 Dec 2025.pdf · uploaded 11 Jun 2026Source
  • Withdrawal Update Form 2Form-2 Q3 Dec 2025.pdf · uploaded 11 Jun 2026Source
  • Withdrawal Update Form 3Form-3 Q3 Dec 2025..pdf · uploaded 11 Jun 2026Source
  • Form 5 (FY 2023-2024)FORM 5 23-24.pdf · uploaded 11 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Q4 Mar 2026.pdf · uploaded 18 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Q4 Mar 2026.pdf · uploaded 18 Jun 2026Source
  • Withdrawal Update Form 3Form 3 Q4 Mar 2026.pdf · uploaded 18 Jun 2026Source
  • Form 5 (FY 2024-2025)Form 5 FY 24-25.pdf · uploaded 18 Jun 2026Source

Technical

  • DocumentUpdated Plan - March 2023.pdf · uploaded 31 Mar 2023Source
  • DocumentUpdated Sections - March 2023.pdf · uploaded 31 Mar 2023Source
  • DocumentRevised Sanction Plan 12-04-2024.pdf · uploaded 8 Feb 2025Source
  • DocumentRevised Sanction Plan2 12-04-2024.pdf · uploaded 8 Feb 2025Source

Technical (Architect)

  • DocumentForm-1 Q1 Jun 2024.pdf · uploaded 15 Feb 2025Source
  • DocumentForm-1 Q2 Sep 2024.pdf · uploaded 15 Feb 2025Source
  • DocumentForm-1 Q3 Dec 2024.pdf · uploaded 15 Feb 2025Source
  • DocumentForm 1 Q4 Mar 2026.pdf · uploaded 18 Jun 2026Source

Technical (Engineer)

  • DocumentForm-2 Q1 Jun 2024.pdf · uploaded 15 Feb 2025Source
  • DocumentForm-2 Q2 Sep 2024.pdf · uploaded 15 Feb 2025Source
  • DocumentForm-2 Q3 Dec 2024.pdf · uploaded 15 Feb 2025Source
  • DocumentForm 2 Q4 Mar 2026.pdf · uploaded 18 Jun 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsSURVEY NO. 22/3(P) + 22/3/21

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
Office space14 units in all
Address
Survey No. 22/3(P) + 22/3/21, Balewadi High Street Road, BalewadiPIN 411045
Village
Balewadi, Haveli taluka
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

SURVEY NO. 22/3(P) + 22/3/21

Boundaries

North
By Remaining Part Of S No 22-3
South
By Remaining Parts No 22-3
East
By Remaining Part Of S No 22-3
West
By Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking14 units

2 of 14 units booked (14%), as the promoter reported to MahaRERA

Office space · 14 units
TypeCarpet areaUnitsBooked
Office space94.66 sq m · 1,019 sq ft71
Office space97.03 sq m · 1,044 sq ft71

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDipali Bharam—
Chartered accountantRaj Anand Mhatre—
Chartered accountantSatish S Borkar—
EngineerRohit S Kamble—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology