Nandan Ace
Its promised completion date, Mar 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 83% of its units are booked.
Balewadi, Pune 411045 · Property rates in Balewadi · Promoter: Jhamtani Realty Private Limited
Its promised completion date, Mar 2026, has passed and MahaRERA does not show it completed
- This projectRegistered 22 Feb 2022, completion promised 31 Mar 2026, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100033562
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100033562 | 22 Feb 2022 | 31 Mar 2026 | 31 Mar 2026 | Jhamtani Realty Private Limited | Project page |
Documents142
1 document held by Deedo, 141 filings listed on MahaRERA's project page
Finance
- PAN CardJRPLT_compressed.pdf · uploaded 11 Feb 2022Source
Legal
- Declaration Form BNandanAce - From B Promoter Jamtani.pdf · uploaded 8 Feb 2022Source
- Legal Title report1 Title Report _ Nandan Ace.pdf · uploaded 10 Feb 2022Source
- Legal Title report2 Title Report _ Nandan Ace.pdf · uploaded 10 Feb 2022Source
- Legal Title report3 Title Report _ Nandan Ace.pdf · uploaded 10 Feb 2022Source
- Other – LegalIndex II - Mortgage 2024.pdf · uploaded 11 Oct 2024Source
- Other – LegalIndex II - Mortgage 2023.pdf · uploaded 11 Oct 2024Source
Show all 142 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesNandanAce - No Encumbrances Letter _ Nandan Ace.pdf · uploaded 8 Feb 2022Source
- 1 Declaration in FORM BNandanAce - From B Promoter Jamtani.pdf · uploaded 8 Feb 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)NandanAce - Form 2 Engineers Certificate - Balewadi.pdf · uploaded 8 Feb 2022Source
- 1 Proforma of Allotment letterNandanAce - Draft Allotment Letter Nandan Ace.pdf · uploaded 8 Feb 2022Source
- 1 Copy of Layout Approval (in case of layout)Sanction Plan 1.pdf · uploaded 9 Feb 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentSanction Plan 1.pdf · uploaded 9 Feb 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentBuilding CC 20-01-2022.pdf · uploaded 9 Feb 2022Source
- 1 Declaration about Commencement CertificateDeclaration about CC _ Nandan Ace.pdf · uploaded 9 Feb 2022Source
- 2 Proforma of Allotment letterNandan Ace _ ATS Draft.pdf · uploaded 9 Feb 2022Source
- 1 Copy of the legal title report1 Title Report _ Nandan Ace.pdf · uploaded 10 Feb 2022Source
- 2 Copy of the legal title report2 Title Report _ Nandan Ace.pdf · uploaded 10 Feb 2022Source
- 3 Copy of the legal title report3 Title Report _ Nandan Ace.pdf · uploaded 10 Feb 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Revised.pdf · uploaded 10 Feb 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200229874313_For_Asset_Based_Search_09_02_2022_16_36_45_298.pdf · uploaded 10 Feb 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final CA Certificate With Signature_compressed.pdf · uploaded 10 Feb 2022Source
- 1 PAN CardJRPLT_compressed.pdf · uploaded 11 Feb 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nandan Ace.pdf · uploaded 20 Jul 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nandan Ace.pdf · uploaded 20 Jul 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nandan Ace Sept 22.pdf · uploaded 12 Oct 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nandan Ace.pdf · uploaded 12 Oct 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nandhan ACE.pdf · uploaded 18 Oct 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nandan Ace Form 1.pdf · uploaded 6 Jan 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nandan Ace.pdf · uploaded 14 Jan 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nandan Ace2.pdf · uploaded 14 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)NANDAN.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)NANDAN.pdf · uploaded 16 Feb 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed_Nandan Ace_compressed.pdf · uploaded 7 Apr 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nandan Ace.pdf · uploaded 11 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nandan Ace.pdf · uploaded 14 Apr 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nandan Ace.pdf · uploaded 6 Jul 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Nandan Ace.pdf · uploaded 7 Jul 2023Source
- 2 Details of encumbrancesEncumbrance Declaration Herofincorp.pdf · uploaded 21 Aug 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nandan Ace.pdf · uploaded 23 Aug 2023Source
- 1 Proforma of Agreement for saleATS_ Nandan Ace _ Blank Draft.pdf · uploaded 23 Aug 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nandan Form 1.pdf · uploaded 29 Sep 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nandan.pdf · uploaded 30 Sep 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Nandan_11zon.pdf · uploaded 30 Sep 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)JRPL NANDAN ACE DSC_11zon.pdf · uploaded 7 Oct 2023Source
- 2 Copy of Layout Approval (in case of layout)01_compressed.pdf · uploaded 11 Oct 2023Source
- 2 Building Plan Approval / NA Order for plotted development27_compressed.pdf · uploaded 11 Oct 2023Source
- 3 Building Plan Approval / NA Order for plotted development28_compressed.pdf · uploaded 11 Oct 2023Source
- 4 Building Plan Approval / NA Order for plotted development29_compressed.pdf · uploaded 11 Oct 2023Source
- 5 Building Plan Approval / NA Order for plotted development30_compressed.pdf · uploaded 11 Oct 2023Source
- 6 Building Plan Approval / NA Order for plotted development31_compressed.pdf · uploaded 11 Oct 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 11 Oct 2023Source
- 2 Declaration about Commencement CertificateCC.pdf · uploaded 11 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)NANDAN ACE MAR 23.pdf · uploaded 27 Dec 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)NANDAN ACE FORM 1.pdf · uploaded 22 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)ACE NANDAN BUILDING E.pdf · uploaded 22 Jan 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)ACE NANDAN FORM-3.pdf · uploaded 22 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryNandan Ace.pdf · uploaded 3 Feb 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)NANDAN ACE.pdf · uploaded 18 Apr 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)NANDAN ACE BUILDING E.pdf · uploaded 18 Apr 2024Source
- 2 Disclosure of sold/ booked inventoryNANDAN ACE.pdf · uploaded 19 Apr 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)NANDAN ACE.pdf · uploaded 19 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Nandan Ace.pdf · uploaded 24 May 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)NANDAN ACE.pdf · uploaded 15 Jul 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)NANDAN ACE.pdf · uploaded 15 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nandan Ace.pdf · uploaded 17 Jul 2024Source
- 3 Disclosure of sold/ booked inventoryNANDAN ACE.pdf · uploaded 18 Jul 2024Source
- 3 Details of encumbrancesFinancial and Legal Encumbrances.pdf · uploaded 11 Oct 2024Source
- 4 a Details of encumbrances concerned to FinanceFinancial and Legal Encumbrances.pdf · uploaded 11 Oct 2024Source
- 1 Other – LegalIndex II - Mortgage 2024.pdf · uploaded 11 Oct 2024Source
- 2 Other – LegalIndex II - Mortgage 2023.pdf · uploaded 11 Oct 2024Source
- 2 CERSAI detailsCERSAI Declaration.pdf · uploaded 11 Oct 2024Source
- 3 b Details of encumbrances concerned to LegalFinancial and Legal Encumbrances.pdf · uploaded 11 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)NANDAN ACE.pdf · uploaded 17 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)NANDAN ACE BUILDING - E.pdf · uploaded 17 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)NANDAN ACE.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryNandan Ace.pdf · uploaded 18 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)NANDAN ACE FORM 5 2023-24.pdf · uploaded 3 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nandan Ace.pdf · uploaded 18 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)NANDAN ACE FORM 3 Q3 2425.pdf · uploaded 18 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nandan Ace.pdf · uploaded 18 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryNandan Ace.pdf · uploaded 18 Jan 2025Source
- 2 a Details of encumbrances concerned to FinanceFinancial and Legal Encumbrance.pdf · uploaded 21 Jan 2025Source
- 1 a Details of encumbrances concerned to FinanceFinancial and Legal Encumbrance.pdf · uploaded 21 Jan 2025Source
- 1 CERSAI detailsCERSAI Declaration and Finance and Legal Encumbrance.pdf · uploaded 21 Jan 2025Source
- 1 b Details of encumbrances concerned to LegalFinancial and Legal Encumbrance.pdf · uploaded 21 Jan 2025Source
- 2 b Details of encumbrances concerned to LegalFinancial and Legal Encumbrance.pdf · uploaded 21 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nandan Ace.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nandan Ace Form 2.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryNANDAN ACE.pdf · uploaded 19 Apr 2025Source
- 2 Disclosure of sold/ booked inventory7) NANDAN ACE.pdf · uploaded 19 Apr 2025Source
- Form 1Nandan Ace.pdf · uploaded 4 Jul 2025Source
- Form 2Nandan Ace Form 2.pdf · uploaded 4 Jul 2025Source
- Form 3Nandan Ace Form 3_Final.pdf · uploaded 4 Jul 2025Source
- Disclosure of Sold and Booked Inventory7) NANDAN ACE.pdf · uploaded 4 Jul 2025Source
- Withdrawal Update Form 1Nandan ace.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 1Nandan ace.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 2Nandan Ace Form 2.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 2Nandan Ace Form 2.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 3Nandan Ace Form 3.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 3Nandan Ace Form 3.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 1Nandan ace.pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 1Nandan ace.pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 2Nandan Ace Form 2.pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 2Nandan Ace Form 2.pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 3Nandan Ace Form 3.pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 3Nandan Ace Form 3.pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 1_Nandan Ace Form 1.pdf · uploaded 19 Oct 2025Source
- Withdrawal Update Form 2Nandan Ace.pdf · uploaded 19 Oct 2025Source
- Withdrawal Update Form 3NANDAN ACE FORM 3 Q2.pdf · uploaded 19 Oct 2025Source
- Form 5 (FY 2024-2025)NANDAN ACE FORM5 2024-25.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Nandan Ace Form 1 Q3 25-26 FINAL.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Nandan Ace Form 2 Q3 25-26_organized.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Nandan Ace Form 3 Q3 25-26.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Nandan Ace Form-1.pdf · uploaded 22 Apr 2026Source
- Withdrawal Update Form 2Nandan Ace Form-2.pdf · uploaded 22 Apr 2026Source
- Withdrawal Update Form 3Nandan Ace Form 3 Q4 25-26 (1).pdf · uploaded 22 Apr 2026Source
- Form 2A (FY 2024-2025)Nandan Ace Form 2A 2024-25.pdf · uploaded 9 Sep 2026Source
Technical
- DocumentSanction Plan 1.pdf · uploaded 9 Feb 2022Source
- DocumentSanction Plan 1.pdf · uploaded 9 Feb 2022Source
- Document01_compressed.pdf · uploaded 11 Oct 2023Source
- Document27_compressed.pdf · uploaded 11 Oct 2023Source
- Document28_compressed.pdf · uploaded 11 Oct 2023Source
- Document29_compressed.pdf · uploaded 11 Oct 2023Source
- Document30_compressed.pdf · uploaded 11 Oct 2023Source
- Document31_compressed.pdf · uploaded 11 Oct 2023Source
- DocumentSheet No 12.pdf · uploaded 17 Nov 2025Source
- DocumentSheet No 17.pdf · uploaded 17 Nov 2025Source
- DocumentSheet No 18.pdf · uploaded 17 Nov 2025Source
- DocumentSheet No 19.pdf · uploaded 17 Nov 2025Source
- DocumentSheet No 20.pdf · uploaded 17 Nov 2025Source
- DocumentSheet No 21.pdf · uploaded 17 Nov 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsSURVEY NO 23 (PART)
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK142 units in all
- Address
- Survey No 23 (Part), University Road, BalewadiPIN 411045
- Village
- Balewadi, Haveli taluka
- Location
- 18.57289, 73.77249
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- By Survey No 4
- South
- By Existing 4 N Half Mtr Road And Proposed 12 Mtr
- East
- By Survey No 4 And Plot Of Bharti Vidyapeeth
- West
- By Building Nandan Spectra 1 Yashwant And 8 Mtr Dw
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking142 units
118 of 142 units booked (83%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 42.56 sq m · 458 sq ft | 2 | 0 |
| 1BHK | 42.72 sq m · 460 sq ft | 2 | 0 |
| 1BHK | 43.29 sq m · 466 sq ft | 2 | 0 |
| 1BHK | 44.99 sq m · 484 sq ft | 2 | 0 |
| 1BHK | 45.11 sq m · 486 sq ft | 1 | 0 |
| 1BHK | 45.43 sq m · 489 sq ft | 1 | 0 |
| 2BHK | 72.38 sq m · 779 sq ft | 4 | 4 |
| 3BHK | 96.21 sq m · 1,036 sq ft | 18 | 18 |
Show all 11 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 3BHK | 97.06 sq m · 1,045 sq ft | 22 | 19 |
| 3BHK | 113.77 sq m · 1,225 sq ft | 44 | 42 |
| 3BHK | 114.72 sq m · 1,235 sq ft | 44 | 35 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Milind Chaudhari | — |
| Engineer | Pranav Shantaram Patil | — |
Source: MahaRERA project page. Contact details are not shown.