Deedo IDDP-PAL-G017Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 34% of its units are booked.
Man, Palghar 401501 · by Gprs Realty
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 12 Mar 2020, completion promised 30 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
14 buildings
Open a building to see every flat, floor by floor.
- Building No 16 floors · 10 units60% booked
- Building No 26 floors · 28 units18% booked
- Building No 44 floors · 4 units25% booked
- Building No 54 floors · 4 units75% booked
- Building No 64 floors · 6 units83% booked
- Building No 7a5 floors · 1 unit0% booked
- Building No 7b5 floors · 1 unit0% booked
- Building No 7c5 floors · 1 unit0% booked
- Building No 7d5 floors · 1 unit0% booked
- Building No 7e5 floors · 1 unit0% booked
- Building No 7f5 floors · 1 unit0% booked
- Building No 7g5 floors · 1 unit100% booked
- Building No 7h5 floors · 1 unit100% booked
- Builidng No 34 floors · 4 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP99000024943
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P99000024943 | 12 Mar 2020 | 30 Dec 2026 | 30 Apr 2027 | Gprs Realty | Project page |
Documents128
1 document held by Deedo, 127 filings listed on MahaRERA's project page
Finance
- PAN Cardgprs pan card.pdf · uploaded 29 Feb 2020Source
Legal
Migrated
- 1 Details of encumbrancesNO ENCUMBRANCE COPY.pdf · uploaded 12 Jan 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentCC_compressed (1).pdf · uploaded 12 Jan 2020Source
- 1 Declaration in FORM BFORM B.pdf · uploaded 12 Jan 2020Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN COMP.pdf · uploaded 10 Feb 2020Source
Show all 128 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportGPRS SERCH REPORT.PDF · uploaded 26 Feb 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)GPRS A_compressed.pdf · uploaded 26 Feb 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA GP.pdf · uploaded 26 Feb 2020Source
- 1 Proforma of Allotment letterAGRE.pdf · uploaded 26 Feb 2020Source
- 1 PAN Cardgprs pan card.pdf · uploaded 29 Feb 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentNA 01.pdf · uploaded 29 Feb 2020Source
- 2 Building Plan Approval / NA Order for plotted developmentNA 02.pdf · uploaded 29 Feb 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)NO PROGRESS.pdf · uploaded 30 Jun 2020Source
- 1 Details of Restarting of Construction work post lockdownCOVID-19.pdf · uploaded 30 Jun 2020Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)NO PROGRESS LETTER.pdf · uploaded 2 Nov 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)ca form 5 revised.pdf · uploaded 16 Nov 2020Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)GPRS ARCHITECT.pdf · uploaded 29 Jan 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 29 Jan 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)GPRS FORM 2A.PDF · uploaded 30 Jan 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH.pdf · uploaded 24 May 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A.pdf · uploaded 24 May 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A.pdf · uploaded 24 May 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA.pdf · uploaded 24 May 2021Source
- 1 Declaration about Commencement CertificateGPRS CC DECLARATION_compressed.pdf · uploaded 12 Aug 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)arch.pdf · uploaded 12 Aug 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 12 Aug 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SITE ENGINEER CERTIFICATE IV_compressed.pdf · uploaded 12 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryGPRS SOLD UNSOLD_compressed.pdf · uploaded 12 Aug 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 12 Aug 2021Source
- 2 Declaration about Commencement CertificateCC DECL_compressed.pdf · uploaded 12 Oct 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A.pdf · uploaded 12 Oct 2021Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 12 Oct 2021Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH.pdf · uploaded 21 Oct 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 21 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 2021.pdf · uploaded 21 Oct 2021Source
- 3 Declaration about Commencement CertificateDECLARATION OF CC.pdf · uploaded 31 Jan 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM-2A SITE ENGINEER CERTIFICATE.pdf · uploaded 31 Jan 2022Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY.pdf · uploaded 31 Jan 2022Source
- 4 Declaration about Commencement CertificateCC DECLARATION 01.pdf · uploaded 2 May 2022Source
- 5 Declaration about Commencement CertificateCC DECLARATION 02.pdf · uploaded 2 May 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH MARCH.pdf · uploaded 2 May 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH DEC.pdf · uploaded 2 May 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENG DEC.pdf · uploaded 2 May 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENG MARCH.pdf · uploaded 2 May 2022Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A DEC.pdf · uploaded 2 May 2022Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A MARCH.pdf · uploaded 2 May 2022Source
- 1 CERSAI detailsCERSAI REPORT.pdf · uploaded 2 May 2022Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD DEC.pdf · uploaded 2 May 2022Source
- 5 Disclosure of sold/ booked inventorySOLD UNSOLD MARCH.pdf · uploaded 2 May 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA DEC.PDF · uploaded 2 May 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA MARCH.PDF · uploaded 2 May 2022Source
- 6 Declaration about Commencement CertificateCC DECLARATION.pdf · uploaded 25 Jul 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECK CERTIFICATE.pdf · uploaded 25 Jul 2022Source
- 7 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SITE ENGINEER CERTIFICATE.pdf · uploaded 25 Jul 2022Source
- 6 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY.pdf · uploaded 25 Jul 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERT 30062022.pdf · uploaded 6 Aug 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Archt Cert.pdf · uploaded 25 Nov 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE FOR MARATHE COMPLEX 30-09-2022.pdf · uploaded 25 Nov 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 25 Nov 2022Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)20230123 Khetan RERA Completion - 52.pdf · uploaded 7 Feb 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE FOR MARATHE COMPLEX 31-12-2022.pdf · uploaded 7 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)site superviser certificate.pdf · uploaded 7 Feb 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 7 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 8 Feb 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 13 May 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 13 May 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FROM 3.pdf · uploaded 13 May 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 8 Aug 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-06-2023.pdf · uploaded 8 Aug 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 as on 30-06-2023_1 (6 files merged).pdf · uploaded 8 Aug 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-09-2023.pdf · uploaded 20 Oct 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-09-2023.pdf · uploaded 20 Oct 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)GPRS FORM 3.pdf · uploaded 22 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-23.pdf · uploaded 1 Nov 2023Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 15 Feb 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 15 Feb 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIGN.pdf · uploaded 15 Feb 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentPLAN 1.PDF · uploaded 27 May 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentPLAN 2.PDF · uploaded 27 May 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentPLAN 3.PDF · uploaded 27 May 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentPLAN 4.PDF · uploaded 27 May 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentPLAN 5.PDF · uploaded 27 May 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentPLAN 6.PDF · uploaded 27 May 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentPLAN 7.PDF · uploaded 27 May 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentGPRS REWISE CC - converted.pdf · uploaded 27 May 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 signed - converted.pdf · uploaded 27 May 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIGNED.pdf · uploaded 27 May 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 signed.pdf · uploaded 27 May 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 20 Aug 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 20 Aug 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIGNED (2).pdf · uploaded 20 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 22 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 30-09-24 - converted.pdf · uploaded 22 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 22 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 22 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 GPRS REALTY 23-24 - converted.pdf · uploaded 27 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 15 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 15 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 15 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 15 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 15 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 6 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - converted.pdf · uploaded 6 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 6 May 2025Source
Technical
- DocumentLAYOUT PLAN COMP.pdf · uploaded 10 Feb 2020Source
- DocumentNA 01.pdf · uploaded 29 Feb 2020Source
- DocumentNA 02.pdf · uploaded 29 Feb 2020Source
- DocumentPLAN 1.PDF · uploaded 27 May 2024Source
- DocumentPLAN 2.PDF · uploaded 27 May 2024Source
- DocumentPLAN 3.PDF · uploaded 27 May 2024Source
- DocumentPLAN 4.PDF · uploaded 27 May 2024Source
- DocumentPLAN 5.PDF · uploaded 27 May 2024Source
- DocumentPLAN 6.PDF · uploaded 27 May 2024Source
- DocumentPLAN 7.PDF · uploaded 27 May 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel CTS NO 76/5
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —64 units in all
- Address
- Cts No 76/5, Near Shri Niwas Park Boisar, PalgharPIN 401501
- Village
- Man, Palghar taluka
- Location
- 19.77831, 72.79091
- Land area for this project
- 8,460 sq m (91,063 sq ft)
- Permissible built-up area
- 6,853 sq m (73,761 sq ft)
- Sanctioned built-up area
- 6,852 sq m (73,752 sq ft)
- Recreational open space
- 846 sq m (9,106 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
CTS NO 76/5
Boundaries
- North
- 9m Wide Approved Layout Road
- South
- Existing Nala
- East
- 9m Wide Internal Road
- West
- 9m Wide Existing Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking64 units
64 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| Building No 1 | — | — | 10 |
| Building No 2 | — | — | 28 |
| Building No 4 | — | — | 4 |
| Building No 5 | — | — | 4 |
| Building No 6 | — | — | 6 |
| Building No 7a | — | — | 1 |
| Building No 7b | — | — | 1 |
| Building No 7c | — | — | 1 |
Show all 14 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units |
|---|---|---|---|
| Building No 7d | — | — | 1 |
| Building No 7e | — | — | 1 |
| Building No 7f | — | — | 1 |
| Building No 7g | — | — | 1 |
| Building No 7h | — | — | 1 |
| Builidng No 3 | — | — | 4 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Oaa Odyssey Architects & Associates | — |
| Chartered accountant | D P Shejwal And Associates | — |
| Engineer | Awhad Consulting Engineers | — |
Source: MahaRERA project page. Contact details are not shown.