Bait E Muhammad
Deedo IDDP-NSK-C8GGCompletion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 1% of its units are booked.
Nashik 422006 · by Onyx Constructions
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2030
- P51600077618Registered 15 Oct 2024, completion promised 31 Dec 2029, revised to 30 Apr 2030.
- PR1221012602301Registered 14 Oct 2026, completion promised 31 Dec 2031.
No extension certificate on record.
2 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
10 buildings
Open a building to see every flat, floor by floor.
- Building A5 floors · 20 units5% booked
- Building B5 floors · 20 units0% booked
- Building C5 floors · 20 units0% booked
- Building D5 floors · 20 units0% booked
- Building E5 floors · 20 units0% booked
- Building F5 floors · 20 units0% booked
- Residential Building Wing G114 floors · 56 units
- Residential Building Wing G214 floors · 56 units
- Wing G1Size not on record0% booked
- Wing G2Size not on record0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations2
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600077618 | 15 Oct 2024 | 31 Dec 2029 | 30 Apr 2030 | Onyx Constructions | Project page |
| PR1221012602301 | 14 Oct 2026 | 31 Dec 2031 | — | Onyx Constructions | Project page |
Documents188
3 documents held by Deedo, 185 filings listed on MahaRERA's project page
Registration certificate (3)
Finance
Show all 188 documentsShow fewer documents
Legal
- Legal Title reportP51600077618 · Title Report.pdf · uploaded 9 Aug 2024Source
- Declaration Form BP51600077618 · Form B - Promoter.pdf · uploaded 9 Aug 2024Source
- Declaration Form BP51600077618 · Form B - Promoter.pdf · uploaded 9 Aug 2024Source
- Declaration Form BP51600077618 · Form B - Promoter.pdf · uploaded 9 Aug 2024Source
- Other – LegalP51600077618 · 7-12.pdf · uploaded 11 Oct 2024Source
- Other – LegalP51600077618 · 7-12.pdf · uploaded 11 Oct 2024Source
- Other – LegalP51600077618 · 7-12.pdf · uploaded 11 Oct 2024Source
- Other – LegalP51600077618 · 7-12.pdf · uploaded 11 Oct 2024Source
Migrated
- 1 PAN CardP51600077618 · PAN.pdf · uploaded 9 Aug 2024Source
- 1 Copy of the legal title reportP51600077618 · Title Report.pdf · uploaded 9 Aug 2024Source
- 1 a Details of encumbrances concerned to FinanceP51600077618 · No Encumbrance - Financial.pdf · uploaded 9 Aug 2024Source
- 2 a Details of encumbrances concerned to FinanceP51600077618 · No Encumbrance - Legal.pdf · uploaded 9 Aug 2024Source
- 1 Copy of Layout Approval (in case of layout)P51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- 1 Declaration in FORM BP51600077618 · Form B - Promoter.pdf · uploaded 9 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600077618 · Form 1.pdf · uploaded 9 Aug 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600077618 · Form 3.pdf · uploaded 9 Aug 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600077618 · Form 2.pdf · uploaded 9 Aug 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP51600077618 · Commencement Certificate.pdf · uploaded 9 Aug 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP4.pdf · uploaded 9 Aug 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP2.pdf · uploaded 9 Aug 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP3.pdf · uploaded 9 Aug 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP7.pdf · uploaded 9 Aug 2024Source
- 1 Declaration about Commencement CertificateP51600077618 · Declaration About CC.pdf · uploaded 9 Aug 2024Source
- 1 CERSAI detailsP51600077618 · Cersai Declaration.pdf · uploaded 9 Aug 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)P51600077618 · Format A - Bank Accounts.pdf · uploaded 9 Aug 2024Source
- 1 Deviation Report with respect to Allotment letterP51600077618 · No Deviation - Allotment Letter.pdf · uploaded 9 Aug 2024Source
- 1 b Details of encumbrances concerned to LegalP51600077618 · No Encumbrance - Financial.pdf · uploaded 9 Aug 2024Source
- 2 b Details of encumbrances concerned to LegalP51600077618 · No Encumbrance - Legal.pdf · uploaded 9 Aug 2024Source
- 1 Other – TechnicalP51600077618 · Annexure A Order No 50.pdf · uploaded 9 Aug 2024Source
- 1 Deviation Report with respect to model copy of AgreementP51600077618 · Deviation - Agreement For Sale.pdf · uploaded 9 Aug 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP51600077618 · Disclosure of Interest.pdf · uploaded 9 Aug 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectP51600077618 · Secured Unsecured Finance.pdf · uploaded 9 Aug 2024Source
- 1 PAN CardP51600077618 · PAN.pdf · uploaded 9 Aug 2024Source
- 1 Copy of the legal title reportP51600077618 · Title Report.pdf · uploaded 9 Aug 2024Source
- 1 a Details of encumbrances concerned to FinanceP51600077618 · No Encumbrance - Financial.pdf · uploaded 9 Aug 2024Source
- 2 a Details of encumbrances concerned to FinanceP51600077618 · No Encumbrance - Legal.pdf · uploaded 9 Aug 2024Source
- 1 Copy of Layout Approval (in case of layout)P51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- 1 Declaration in FORM BP51600077618 · Form B - Promoter.pdf · uploaded 9 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600077618 · Form 1.pdf · uploaded 9 Aug 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600077618 · Form 3.pdf · uploaded 9 Aug 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600077618 · Form 2.pdf · uploaded 9 Aug 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP51600077618 · Commencement Certificate.pdf · uploaded 9 Aug 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP4.pdf · uploaded 9 Aug 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP2.pdf · uploaded 9 Aug 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP3.pdf · uploaded 9 Aug 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP7.pdf · uploaded 9 Aug 2024Source
- 1 Declaration about Commencement CertificateP51600077618 · Declaration About CC.pdf · uploaded 9 Aug 2024Source
- 1 CERSAI detailsP51600077618 · Cersai Declaration.pdf · uploaded 9 Aug 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)P51600077618 · Format A - Bank Accounts.pdf · uploaded 9 Aug 2024Source
- 1 Deviation Report with respect to Allotment letterP51600077618 · No Deviation - Allotment Letter.pdf · uploaded 9 Aug 2024Source
- 1 b Details of encumbrances concerned to LegalP51600077618 · No Encumbrance - Financial.pdf · uploaded 9 Aug 2024Source
- 2 b Details of encumbrances concerned to LegalP51600077618 · No Encumbrance - Legal.pdf · uploaded 9 Aug 2024Source
- 1 Other – TechnicalP51600077618 · Annexure A Order No 50.pdf · uploaded 9 Aug 2024Source
- 1 Deviation Report with respect to model copy of AgreementP51600077618 · Deviation - Agreement For Sale.pdf · uploaded 9 Aug 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP51600077618 · Disclosure of Interest.pdf · uploaded 9 Aug 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectP51600077618 · Secured Unsecured Finance.pdf · uploaded 9 Aug 2024Source
- 1 PAN CardP51600077618 · PAN.pdf · uploaded 9 Aug 2024Source
- 1 Copy of the legal title reportP51600077618 · Title Report.pdf · uploaded 9 Aug 2024Source
- 1 a Details of encumbrances concerned to FinanceP51600077618 · No Encumbrance - Financial.pdf · uploaded 9 Aug 2024Source
- 2 a Details of encumbrances concerned to FinanceP51600077618 · No Encumbrance - Legal.pdf · uploaded 9 Aug 2024Source
- 1 Copy of Layout Approval (in case of layout)P51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- 1 Declaration in FORM BP51600077618 · Form B - Promoter.pdf · uploaded 9 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600077618 · Form 1.pdf · uploaded 9 Aug 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600077618 · Form 3.pdf · uploaded 9 Aug 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600077618 · Form 2.pdf · uploaded 9 Aug 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP51600077618 · Commencement Certificate.pdf · uploaded 9 Aug 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP4.pdf · uploaded 9 Aug 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP2.pdf · uploaded 9 Aug 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP3.pdf · uploaded 9 Aug 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP51600077618 · SP7.pdf · uploaded 9 Aug 2024Source
- 1 Declaration about Commencement CertificateP51600077618 · Declaration About CC.pdf · uploaded 9 Aug 2024Source
- 1 CERSAI detailsP51600077618 · Cersai Declaration.pdf · uploaded 9 Aug 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)P51600077618 · Format A - Bank Accounts.pdf · uploaded 9 Aug 2024Source
- 1 Deviation Report with respect to Allotment letterP51600077618 · No Deviation - Allotment Letter.pdf · uploaded 9 Aug 2024Source
- 1 b Details of encumbrances concerned to LegalP51600077618 · No Encumbrance - Financial.pdf · uploaded 9 Aug 2024Source
- 2 b Details of encumbrances concerned to LegalP51600077618 · No Encumbrance - Legal.pdf · uploaded 9 Aug 2024Source
- 1 Other – TechnicalP51600077618 · Annexure A Order No 50.pdf · uploaded 9 Aug 2024Source
- 1 Deviation Report with respect to model copy of AgreementP51600077618 · Deviation - Agreement For Sale.pdf · uploaded 9 Aug 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP51600077618 · Disclosure of Interest.pdf · uploaded 9 Aug 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectP51600077618 · Secured Unsecured Finance.pdf · uploaded 9 Aug 2024Source
- 1 Proforma of Allotment letterP51600077618 · Allotement Letter.pdf · uploaded 11 Oct 2024Source
- 1 Other – LegalP51600077618 · 7-12.pdf · uploaded 11 Oct 2024Source
- 2 Other – TechnicalP51600077618 · UD Resolution.pdf · uploaded 11 Oct 2024Source
- 1 Proforma of Agreement for saleP51600077618 · Agreement For Sale.pdf · uploaded 11 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P51600077618 · Format B - Bank Accounts.pdf · uploaded 11 Oct 2024Source
- 1 Proforma of Allotment letterP51600077618 · Allotement Letter.pdf · uploaded 11 Oct 2024Source
- 1 Other – LegalP51600077618 · 7-12.pdf · uploaded 11 Oct 2024Source
- 2 Other – TechnicalP51600077618 · UD Resolution.pdf · uploaded 11 Oct 2024Source
- 1 Proforma of Agreement for saleP51600077618 · Agreement For Sale.pdf · uploaded 11 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P51600077618 · Format B - Bank Accounts.pdf · uploaded 11 Oct 2024Source
- 1 Proforma of Allotment letterP51600077618 · Allotement Letter.pdf · uploaded 11 Oct 2024Source
- 1 Other – LegalP51600077618 · 7-12.pdf · uploaded 11 Oct 2024Source
- 2 Other – TechnicalP51600077618 · UD Resolution.pdf · uploaded 11 Oct 2024Source
- 1 Proforma of Agreement for saleP51600077618 · Agreement For Sale.pdf · uploaded 11 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P51600077618 · Format B - Bank Accounts.pdf · uploaded 11 Oct 2024Source
- 1 Proforma of Agreement for saleP51600077618 · Agreement For Sale.pdf · uploaded 11 Oct 2024Source
- 1 Proforma of Allotment letterP51600077618 · Allotement Letter.pdf · uploaded 11 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P51600077618 · Format B - Bank Accounts.pdf · uploaded 11 Oct 2024Source
- 1 Other – TechnicalP51600077618 · UD Resolution.pdf · uploaded 11 Oct 2024Source
- 1 Other – LegalP51600077618 · 7-12.pdf · uploaded 11 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600077618 · Form 1 24-25 Q3.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600077618 · Form 3 SD 24-25 Q3.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600077618 · Form 2 24-25 Q3.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP51600077618 · Inventory 24-25 Q3.pdf · uploaded 20 Jan 2025Source
- DocumentP51600077618 · Form 1 24-25 Q4.pdf · uploaded 29 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600077618 · Form 3 SD 24-25 Q4.pdf · uploaded 29 Apr 2025Source
- DocumentP51600077618 · Form 2 24-25 Q4.pdf · uploaded 29 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP51600077618 · Inventory 31-03-2025.pdf · uploaded 29 Apr 2025Source
- Form 1P51600077618 · Form 1 24-25 Q3.pdf · uploaded 29 Jul 2025Source
- Form 1P51600077618 · Form 1 24-25 Q4.pdf · uploaded 29 Jul 2025Source
- Form 2P51600077618 · Form 2 24-25 Q3.pdf · uploaded 29 Jul 2025Source
- Form 2P51600077618 · Form 2 24-25 Q4.pdf · uploaded 29 Jul 2025Source
- Form 3P51600077618 · Form 3 SD 24-25 Q3.pdf · uploaded 29 Jul 2025Source
- Form 3P51600077618 · Form 3 SD 24-25 Q4.pdf · uploaded 29 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51600077618 · Inventory 24-25 Q3.pdf · uploaded 29 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51600077618 · Inventory 31-03-2025.pdf · uploaded 29 Jul 2025Source
- Form 5 (FY 2024-2025)P51600077618 · Form 5 - 2024-25.pdf · uploaded 29 Jul 2025Source
- Withdrawal Update Form 1P51600077618 · Form 1.pdf · uploaded 2 Aug 2025Source
- Withdrawal Update Form 2P51600077618 · Form 2.pdf · uploaded 2 Aug 2025Source
- Withdrawal Update Form 3P51600077618 · Form 3.pdf · uploaded 2 Aug 2025Source
- Withdrawal Update Form 1P51600077618 · Form 1.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 2P51600077618 · Form 2.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 3P51600077618 · Form 3.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 1P51600077618 · Form 1 25-26 Q2.pdf · uploaded 23 Mar 2026Source
- Withdrawal Update Form 1P51600077618 · Form 1 25-26 Q3.pdf · uploaded 23 Mar 2026Source
- Withdrawal Update Form 2P51600077618 · Form 2 25-26 Q2.pdf · uploaded 23 Mar 2026Source
- Withdrawal Update Form 2P51600077618 · Form 2 25-26 Q3.pdf · uploaded 23 Mar 2026Source
- Withdrawal Update Form 3P51600077618 · Form 3 SD 25-26 Q2.pdf · uploaded 23 Mar 2026Source
- Withdrawal Update Form 3P51600077618 · Form 3 25-26 Q3.pdf · uploaded 23 Mar 2026Source
- Withdrawal Update Form 1P51600077618 · Form 1 25-26 Q4.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 1P51600077618 · Form 1 25-26 Q4.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 2P51600077618 · Form 2 25-26 Q3.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 2P51600077618 · Form 2 25-26 Q4.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 3P51600077618 · Form 3 25-26 Q4.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 3P51600077618 · Form 3 25-26 Q4.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 1P51600077618 · Form 1 26-27 Q1.pdf · uploaded 8 Oct 2026Source
- Withdrawal Update Form 1P51600077618 · Form 1 26-27 Q2.pdf · uploaded 8 Oct 2026Source
- Withdrawal Update Form 2P51600077618 · Form 2 26-27 Q1.pdf · uploaded 8 Oct 2026Source
- Withdrawal Update Form 2P51600077618 · Form 2 26-27 Q2.pdf · uploaded 8 Oct 2026Source
- Withdrawal Update Form 3P51600077618 · Form 3 SD 26-27 Q1.pdf · uploaded 8 Oct 2026Source
- Withdrawal Update Form 3P51600077618 · Form 3 26-27 Q2.pdf · uploaded 8 Oct 2026Source
Technical
- DocumentP51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP7.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP4.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP3.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP2.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP7.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP4.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP3.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP2.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP7.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP4.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP3.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP2.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · SP1.pdf · uploaded 9 Aug 2024Source
- Other – TechnicalP51600077618 · Annexure A Order No 50.pdf · uploaded 9 Aug 2024Source
- Other – TechnicalP51600077618 · Annexure A Order No 50.pdf · uploaded 9 Aug 2024Source
- Other – TechnicalP51600077618 · Annexure A Order No 50.pdf · uploaded 9 Aug 2024Source
- Other – TechnicalP51600077618 · UD Resolution.pdf · uploaded 11 Oct 2024Source
- Other – TechnicalP51600077618 · UD Resolution.pdf · uploaded 11 Oct 2024Source
- Other – TechnicalP51600077618 · UD Resolution.pdf · uploaded 11 Oct 2024Source
- Other – TechnicalP51600077618 · UD Resolution.pdf · uploaded 11 Oct 2024Source
- DocumentP51600077618 · Annexure A Order No 50.pdf · uploaded 29 Jul 2025Source
Technical (Architect)
- DocumentP51600077618 · Form 1.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · Form 1.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · Form 1 24-25 Q3.pdf · uploaded 20 Jan 2025Source
- DocumentP51600077618 · Form 1 24-25 Q4.pdf · uploaded 29 Apr 2025Source
- DocumentP51600077618 · Form 1 26-27 Q2.pdf · uploaded 8 Oct 2026Source
Technical (Engineer)
- DocumentP51600077618 · Form 2.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · Form 2.pdf · uploaded 9 Aug 2024Source
- DocumentP51600077618 · Form 2 24-25 Q3.pdf · uploaded 20 Jan 2025Source
- DocumentP51600077618 · Form 2 24-25 Q4.pdf · uploaded 29 Apr 2025Source
- DocumentP51600077618 · Form 2 26-27 Q2.pdf · uploaded 8 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Survey No. 3/1/5/2 to 3/1/8/2, Survey No. 3/1/5/2 to 3/1/8/2
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 2
- Unit types
- 3BHK, Landowner Flats, 2BHK120 units in all
- Address
- Survey No. 3/1/5/2 to 3/1/8/2, Wadala Shiwar, Nashik, SANT SAVTA MALI MARG, WADALA-DGP NAGAR ROAD, RAHMAT NAGAR, OPP. VITTHAL RUKMINI TEMPLE, WADALAPIN 422006
- Village
- Nashik, Nashik taluka
- Location
- 19.97182, 73.79686
- Land area for this project
- 6,340 sq m (68,243 sq ft)
- Permissible built-up area
- 7,632 sq m (82,153 sq ft)
- Sanctioned built-up area
- 6,632 sq m (71,389 sq ft)
- Recreational open space
- 1,050 sq m (11,307 sq ft)
- Designated bank account
- 109
- Developed in phases
- Yes
- Also registered as
- Bait E Muhammad Phase 1, Bait E Muhammad Phase 2
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No. 3/1/5/2 to 3/1/8/2, Wadala Shiwar, Nashik
Boundaries
- North
- Proposed Phase 2 Building G and 12 Meter Road
- South
- Survey No 67
- East
- Survey No 3-1-9
- West
- Survey No 3-1-5 to 8-1
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking120 units
1 of 120 units booked (1%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51600077618 | Building A | 3BHK | 66.8 sq m · 719 sq ft | 12 | 1 |
| P51600077618 | Building A | Landowner Flats | 66.8 sq m · 719 sq ft | 8 | 0 |
| P51600077618 | Building B | 2BHK | 46.39 sq m · 499 sq ft | 12 | 0 |
| P51600077618 | Building B | Landowner Flats | 46.39 sq m · 499 sq ft | 8 | 0 |
| P51600077618 | Building C | 2BHK | 46.39 sq m · 499 sq ft | 14 | 0 |
| P51600077618 | Building C | Landowner Flats | 46.39 sq m · 499 sq ft | 6 | 0 |
| P51600077618 | Building D | 2BHK | 46.39 sq m · 499 sq ft | 12 | 0 |
| P51600077618 | Building D | Landowner Flats | 46.39 sq m · 499 sq ft | 8 | 0 |
Show all 11 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51600077618 | Building E | 2BHK | 46.39 sq m · 499 sq ft | 20 | 0 |
| P51600077618 | Building F | 2BHK | 46.39 sq m · 499 sq ft | 12 | 0 |
| P51600077618 | Building F | Landowner Flats | 46.39 sq m · 499 sq ft | 8 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Sumit Kumath | — | P51600077618 |
| Chartered accountant | Nirav Shah | — | P51600077618 |
| Engineer | Milind Rathi | — | P51600077618 |
| Engineer | Sagar Shah | — | P51600077618 |
Source: MahaRERA project page. Contact details are not shown.