Residential / Group Housing · 1 building · 18 unitsRERA P50500053114

Royal Pride

Deedo IDDP-NGP-3X0M

Completion was pushed back 4 months to Oct 2026, and that date has passed too; no MahaRERA orders on record; 78% of its units are booked.

Besa, Nagpur 440037 · by National Builders And Developers · 67% of its projects kept the RERA date

Delivery5 mo latePromised Jun 2026 · revised Oct 2026 · that date has passed tooRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales78% booked14 of 18 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months to Oct 2026, and that date has passed too

  • This projectRegistered 16 Oct 2023, completion promised 30 Jun 2026, revised to 30 Oct 2026, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP50500053114
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050005311416 Oct 202330 Jun 202630 Oct 2026National Builders And DevelopersProject page
Documents241

52 documents held by Deedo, 189 filings listed on MahaRERA's project page

Registration certificate

Other (16)

  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
Show all 241 documentsShow fewer documents

Other (16)

  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView

Commencement certificate (2)

  • Commencement certificateDate not statedView
  • Commencement certificateDate not statedView

Form 1 (18)

  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView

Allotment letter

  • Allotment letterDate not statedView

Title report

  • Title reportDate not statedView

Encumbrance details (3)

  • Encumbrance detailsDate not statedView
  • Encumbrance detailsDate not statedView
  • Encumbrance detailsDate not statedView

Layout plan

  • Layout planDate not statedView

Form B

  • Form BDate not statedView

Form 2 (7)

  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView

Building plan

  • Building planDate not statedView

Legal

  • Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 7 Jul 2023View
  • Declaration Form B6_FORM 'B'.pdf · uploaded 29 Jul 2023View
  • Other – LegalSale Deed (1).pdf · uploaded 6 Oct 2023View

Migrated

  • 1 PAN CardPAN CARD.pdf · uploaded 7 Jul 2023View
  • 1 Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 7 Jul 2023View
  • 1 a Details of encumbrances concerned to FinanceNON-ENCUMBEANCE CERTIFICATE FOR RERA.pdf · uploaded 7 Jul 2023View
  • 1 b Details of encumbrances concerned to LegalNON-ENCUMBEANCE CERTIFICATE FOR RERA.pdf · uploaded 7 Jul 2023View
  • 1 Copy of Layout Approval (in case of layout)5_MAP(1).pdf · uploaded 7 Jul 2023View
  • 1 CERSAI detailsDECLARATION INSTEAD OF CERSAI REPORT .pdf · uploaded 7 Jul 2023View
  • 1 Disclosure of Interest in Other Real Estate Organizations19_DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATIONS.pdf · uploaded 7 Jul 2023View
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same36_SEPERATE_BANK_ACCOUNT.pdf · uploaded 7 Jul 2023View
  • 1 Deviation Report with respect to Allotment letter12_DEVIATION REPORT WRT ALLOTMENT LETTER.pdf · uploaded 7 Jul 2023View
  • 1 Building Plan Approval / NA Order for plotted development5_MAP(1).pdf · uploaded 28 Jul 2023View
  • 1 Declaration about Commencement Certificate5_DECLARATION ABOUT COMMENCEMNT CERTIFICATE_FORM_D.pdf · uploaded 29 Jul 2023View
  • 1 Declaration in FORM B6_FORM 'B'.pdf · uploaded 29 Jul 2023View
  • 1 Proforma of Agreement for sale10_AGREEMENT- TO SALE_(BLANK) - ROYAL PRIDE (2023)-1.pdf · uploaded 29 Jul 2023View
  • 1 Proforma of Allotment letter11_ALLOTMENT_LETTER.pdf · uploaded 29 Jul 2023View
  • 1 Deviation Report with respect to model copy of Agreement13_DEVIATION REPORT WRT MODEL COPY OF AGREEMENT TO SALE.pdf · uploaded 29 Jul 2023View
  • 2 a Details of encumbrances concerned to FinanceFinancial Encumbrance.pdf · uploaded 19 Aug 2023View
  • 2 b Details of encumbrances concerned to LegalFinancial Encumbrance.pdf · uploaded 19 Aug 2023View
  • 2 CERSAI detailsANNEXURE - 'A' NO ENCUMBRANCE CERTIFICATE .pdf · uploaded 19 Aug 2023View
  • 1 Commencement Certificates / NA Order for plotted developmentBuilding Permit.pdf · uploaded 29 Aug 2023View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)New Form 3.pdf · uploaded 9 Sep 2023View
  • 1 Other – TechnicalCC MAIL 1.pdf · uploaded 9 Sep 2023View
  • 2 Other – TechnicalCC MAIL 2.pdf · uploaded 9 Sep 2023View
  • 3 Other – TechnicalCC MAIL 3.pdf · uploaded 9 Sep 2023View
  • 1 Other – LegalSale Deed (1).pdf · uploaded 6 Oct 2023View
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold booked inventory_DEC2023.pdf · uploaded 2 Feb 2024View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-12-23.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31-03-2024.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-06-24.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31-12-2023.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31-03-24.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-06-2024.pdf · uploaded 6 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryAnnexure 29 31-12-23.pdf · uploaded 6 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryAnnexure 29 31-03-24.pdf · uploaded 6 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryAnnexure 29 30-06-24.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 31-3-24.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-12-23.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-3-24.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-06-2024.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-12-23.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31-03-2024.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-06-24.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31-12-2023.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31-03-24.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-06-2024.pdf · uploaded 6 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryAnnexure 29 31-12-23.pdf · uploaded 6 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryAnnexure 29 31-03-24.pdf · uploaded 6 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryAnnexure 29 30-06-24.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 31-3-24.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-12-23.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-3-24.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-06-2024.pdf · uploaded 6 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-12-23.pdf · uploaded 6 Oct 2024View
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31-03-2024.pdf · uploaded 6 Oct 2024View
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-06-24.pdf · uploaded 6 Oct 2024View
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-12-23.pdf · uploaded 6 Oct 2024View
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-3-24.pdf · uploaded 6 Oct 2024View
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-06-2024.pdf · uploaded 6 Oct 2024View
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31-12-2023.pdf · uploaded 6 Oct 2024View
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-06-2024.pdf · uploaded 6 Oct 2024View
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31-03-24.pdf · uploaded 6 Oct 2024View
  • 2 Disclosure of sold/ booked inventoryAnnexure 29 31-12-23.pdf · uploaded 6 Oct 2024View
  • 3 Disclosure of sold/ booked inventoryAnnexure 29 31-03-24.pdf · uploaded 6 Oct 2024View
  • 4 Disclosure of sold/ booked inventoryAnnexure 29 30-06-24.pdf · uploaded 6 Oct 2024View
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 31-3-24.pdf · uploaded 6 Oct 2024View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 30-9-24.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryAnnexure.pdf · uploaded 19 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 30-9-24.pdf · uploaded 19 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 30-9-24.pdf · uploaded 19 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 30-9-24.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryAnnexure.pdf · uploaded 19 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 30-9-24.pdf · uploaded 19 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 30-9-24.pdf · uploaded 19 Oct 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 30-9-24.pdf · uploaded 19 Oct 2024View
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 30-9-24.pdf · uploaded 19 Oct 2024View
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 30-9-24.pdf · uploaded 19 Oct 2024View
  • 5 Disclosure of sold/ booked inventoryAnnexure.pdf · uploaded 19 Oct 2024View
  • 1 Building Plan Approval / NA Order for plotted developmentNISWADE APPROVAL PLAN.pdf · uploaded 12 Dec 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentNISWADE APPROVAL PLAN.pdf · uploaded 12 Dec 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentNISWADE APPROVAL PLAN.pdf · uploaded 12 Dec 2024View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 31-12-2024.pdf · uploaded 21 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 31-2-2024.pdf · uploaded 21 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryAnnexure-29 sold unsold inventory 31-12-2024.pdf · uploaded 21 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 21 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 31-12-2024.pdf · uploaded 21 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 31-2-2024.pdf · uploaded 21 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryAnnexure-29 sold unsold inventory 31-12-2024.pdf · uploaded 21 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 21 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 31-12-2024.pdf · uploaded 21 Jan 2025View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 21 Jan 2025View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 31-2-2024.pdf · uploaded 21 Jan 2025View
  • 1 Disclosure of sold/ booked inventoryAnnexure-29 sold unsold inventory 31-12-2024.pdf · uploaded 21 Jan 2025View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 31-03-2025.pdf · uploaded 1 May 2025View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 31-03-2025.pdf · uploaded 1 May 2025View
  • 1 Disclosure of sold/ booked inventoryAnnexure-29 31-03-2025.pdf · uploaded 1 May 2025View
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A 31-03-2025.pdf · uploaded 1 May 2025View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM - 3 31-03-2025 Sign.pdf · uploaded 2 May 2025View
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM - 3 31-03-2025 Sign.pdf · uploaded 2 May 2025View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 31-03-2025.pdf · uploaded 2 May 2025View
  • Form 1Form 1 31-12-23.pdf · uploaded 4 Aug 2025Source
  • Form 1form 1 31-03-2024.pdf · uploaded 4 Aug 2025Source
  • Form 1Form 1 30-06-24.pdf · uploaded 4 Aug 2025Source
  • Form 1Form-1 30-9-24.pdf · uploaded 4 Aug 2025Source
  • Form 1Form -1 31-12-2024.pdf · uploaded 4 Aug 2025Source
  • Form 1Form-1 31-03-2025.pdf · uploaded 4 Aug 2025Source
  • Form 2form 2 31-12-2023.pdf · uploaded 4 Aug 2025Source
  • Form 2form 2 31-03-24.pdf · uploaded 4 Aug 2025Source
  • Form 2Form 2 30-06-2024.pdf · uploaded 4 Aug 2025Source
  • Form 2Form-2 30-9-24.pdf · uploaded 4 Aug 2025Source
  • Form 2Form -2 31-2-2024.pdf · uploaded 4 Aug 2025Source
  • Form 2Form-2 31-03-2025.pdf · uploaded 4 Aug 2025Source
  • Form 3Form 3 31-12-23.pdf · uploaded 4 Aug 2025Source
  • Form 3Form 3 31-3-24.pdf · uploaded 4 Aug 2025Source
  • Form 3Form 3 30-06-2024.pdf · uploaded 4 Aug 2025Source
  • Form 3Form-3 30-9-24.pdf · uploaded 4 Aug 2025Source
  • Form 3Form 3 CA Cert 31-12-2024.pdf · uploaded 4 Aug 2025Source
  • Form 3FORM - 3 31-03-2025 Sign.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure 29 31-12-23.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure 29 31-03-24.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure 29 30-06-24.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure-29 sold unsold inventory 31-12-2024.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure-29 31-03-2025.pdf · uploaded 4 Aug 2025Source
  • Withdrawal Update Form 1Form-1 30-06-2025.pdf · uploaded 4 Aug 2025Source
  • Withdrawal Update Form 2Form-2 30-06-2025.pdf · uploaded 4 Aug 2025Source
  • Withdrawal Update Form 3Form-3 30-06-2025 Sign.pdf · uploaded 4 Aug 2025Source
  • Withdrawal Update Form 1Form-1 30-06-2025.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 2Form-2 30-06-2025.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 3Form-3 30-06-2025 Sign.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 1Form-1 30-09-2025.pdf · uploaded 6 Nov 2025Source
  • Withdrawal Update Form 2Form-2 30-09-2025.pdf · uploaded 6 Nov 2025Source
  • Withdrawal Update Form 3Form 3 30-09-2025.pdf · uploaded 6 Nov 2025Source
  • Withdrawal Update Form 1Form-1 31-12-2025.pdf · uploaded 24 Jan 2026Source
  • Withdrawal Update Form 2Form-2 31-12-2025.pdf · uploaded 24 Jan 2026Source
  • Withdrawal Update Form 3FORM -3 31-12-2025_0.pdf · uploaded 24 Jan 2026Source
  • Form 5 (FY 2023-2024)Form 5 31-3-24.pdf · uploaded 29 Jan 2026Source
  • Form 2A (FY 2023-2024)Form 2 A 31-03-2024.pdf · uploaded 12 Feb 2026Source
  • Form 2A (FY 2024-2025)Form 2 A 31-03-2025.pdf · uploaded 12 Feb 2026Source
  • Form 5 (FY 2024-2025)Form 5 31-3-25 Sign.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 1Form-1 31-12-2025.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 1Form-1 31-12-2025.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 2Form-2 31-12-2025.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 2Form-2 31-12-2025.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 3FORM -3 31-12-2025_0.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 3FORM -3 31-12-2025_0.pdf · uploaded 22 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2 A 31-03-2026.pdf · uploaded 8 Sep 2026Source

Technical

  • Document5_MAP(1).pdf · uploaded 7 Jul 2023View
  • Document5_MAP(1).pdf · uploaded 28 Jul 2023View
  • Other – TechnicalCC MAIL 1.pdf · uploaded 9 Sep 2023View
  • Other – TechnicalCC MAIL 2.pdf · uploaded 9 Sep 2023View
  • Other – TechnicalCC MAIL 3.pdf · uploaded 9 Sep 2023View
  • DocumentNISWADE APPROVAL PLAN.pdf · uploaded 12 Dec 2024Source
  • DocumentNISWADE APPROVAL PLAN.pdf · uploaded 12 Dec 2024Source
  • DocumentNISWADE APPROVAL PLAN.pdf · uploaded 12 Dec 2024View

Technical (Architect)

  • DocumentForm 1 31-12-23.pdf · uploaded 6 Oct 2024Source
  • Documentform 1 31-03-2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 30-06-24.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 31-12-23.pdf · uploaded 6 Oct 2024Source
  • Documentform 1 31-03-2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 30-06-24.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 31-12-23.pdf · uploaded 6 Oct 2024View
  • Documentform 1 31-03-2024.pdf · uploaded 6 Oct 2024View
  • DocumentForm 1 30-06-24.pdf · uploaded 6 Oct 2024View
  • DocumentForm-1 30-9-24.pdf · uploaded 19 Oct 2024Source
  • DocumentForm-1 30-9-24.pdf · uploaded 19 Oct 2024Source
  • DocumentForm-1 30-9-24.pdf · uploaded 19 Oct 2024View
  • DocumentForm -1 31-12-2024.pdf · uploaded 21 Jan 2025Source
  • DocumentForm -1 31-12-2024.pdf · uploaded 21 Jan 2025View
  • DocumentForm-1 31-03-2025.pdf · uploaded 1 May 2025View
  • DocumentForm-1 31-12-2025.pdf · uploaded 24 Jan 2026Source

Technical (Engineer)

  • Documentform 2 31-12-2023.pdf · uploaded 6 Oct 2024Source
  • Documentform 2 31-03-24.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 2 30-06-2024.pdf · uploaded 6 Oct 2024Source
  • Documentform 2 31-12-2023.pdf · uploaded 6 Oct 2024Source
  • Documentform 2 31-03-24.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 2 30-06-2024.pdf · uploaded 6 Oct 2024Source
  • Documentform 2 31-12-2023.pdf · uploaded 6 Oct 2024View
  • Documentform 2 31-03-24.pdf · uploaded 6 Oct 2024View
  • DocumentForm 2 30-06-2024.pdf · uploaded 6 Oct 2024View
  • DocumentForm-2 30-9-24.pdf · uploaded 19 Oct 2024Source
  • DocumentForm-2 30-9-24.pdf · uploaded 19 Oct 2024Source
  • DocumentForm-2 30-9-24.pdf · uploaded 19 Oct 2024View
  • DocumentForm -2 31-2-2024.pdf · uploaded 21 Jan 2025Source
  • DocumentForm -2 31-2-2024.pdf · uploaded 21 Jan 2025View
  • DocumentForm-2 31-03-2025.pdf · uploaded 1 May 2025View
  • DocumentForm-2 31-03-2025.pdf · uploaded 2 May 2025View
  • DocumentForm-2 31-12-2025.pdf · uploaded 24 Jan 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 4, 5 Kh No 47

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK18 units in all
Address
Plot No 3, 4 & 5 Kh No 47, PSK No 38, BESA ROAD, BESAPIN 440037
Village
Nagpur (M Corp.), Nagpur (Urban) taluka
Land area for this project
632 sq m (6,806 sq ft)
Permissible built-up area
1,403 sq m (15,102 sq ft)
Sanctioned built-up area
1,403 sq m (15,102 sq ft)
Designated bank account
21
Developed in phases
No

Survey, CTS, gat or plot numbers

45 Kh No 47Plot No 3PSK No 38

Land as published on MahaRERA's project page

Plot No 3, 4 & 5 Kh No 47, PSK No 38

Boundaries

North
Road
South
Plot No 6 - 7 - 8
East
Road
West
Other Layout

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking18 units

14 of 18 units booked (78%), as the promoter reported to MahaRERA

2BHK · 9 units3BHK · 9 units
TypeCarpet areaUnitsBooked
2BHK62.73 sq m · 675 sq ft55
2BHK62.84 sq m · 676 sq ft44
3BHK76.14 sq m · 820 sq ft95

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRavindra Nagpure—
Chartered accountantRoshan Pawar & Co—
EngineerGanesh Ragit—
EngineerRavindra Nagpure—
OtherSuresh Laxman Sarage—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology