BLD_006466Completed42 floors
Mig Type Bunglows · Construction of 33 Ts MIG on S. No. 300/1 B at Sakegaon, Bhusawal, Dist. Jalgaon
Sakegaon · RERA P49900007208
42Sanctioned habitable floorsregistration certificate
5 Oct 2018Promised completion
Floors
42 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 42
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Ground Plus One | 2,222.2 m² (23,919 sq.ft) | 33 | not published |
| Total | 33 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation90%
- Basement (if any)90%
- Podiums (if any)0%
- Plinth90%
- Stilt Floor0%
- Slabs of Super Structure90%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
- Sanitary Fittings within the flats / premises10%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology