Construction of 33 Ts MIG on S. No. 300/1 B at Sakegaon, Bhusawal, Dist. Jalgaon

Completed

Sakegaon, Jalgaon 425201 |Promoter: Nashik Housing And Area Development Board

Residential / Group HousingRERAP49900007208
17 Aug 2017Registered with MahaRERA
5 Oct 2018Promised completion
1Building
33Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Ground Plus One33 units in all
Land area for this project
4,085 sq m (43,971 sq ft)
Permissible built-up area
2,788 sq m (30,009 sq ft)
Sanctioned built-up area
2,788 sq m (30,009 sq ft)
Recreational open space
2,673 sq m (28,772 sq ft)
Address
S. No. 300/1BPIN 425201
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.12393, 72.90944
Construction of 33 Ts MIG on S. No. 300/1 B at Sakegaon, Bhusawal, Dist. Jalgaon is at latitude 19.12393, longitude 72.90944.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 5 Oct 2018

The latest completion date on record passed 8 years ago.

Registered
17 Aug 2017
Promised
5 Oct 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990000720817 Aug 20175 Oct 2018—Nashik Housing And Area Development BoardProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Mig Type Bunglows4233

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

33 units registered

Ground Plus One · 33 units
TypeCarpet areaUnits
Ground Plus One2,222.17 sq m · 23,919 sq ft33

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Mig Type Bunglows

  • Excavation90%
  • Basement (if any)90%
  • Podiums (if any)0%
  • Plinth90%
  • Stilt Floor0%
  • Slabs of Super Structure90%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises10%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAvailable on adjoining Roads.90%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Individual septic tank with soak pit are being pro50%
  • Storm Water DrainsYet to be upgraded.0%
  • Landscaping & Tree Planting0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceAlready provided in layout.100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

27 documents held by Deedo, 44 filings listed on MahaRERA's project page

Titles

Commencement certificates

Form b

Form 1

Form 2

Registration certificate

Completion

Others

Layout plans

Building plans

Allotment letter

Document library

  • Details of encumbrancesLand Title Clearance Certificate.pdf · uploaded 2 Aug 2017View
  • Declaration in FORM BAfadavit 1.pdf · uploaded 2 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate 1.pdf · uploaded 2 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCC of Type A.pdf · uploaded 2 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCC of Type A1.pdf · uploaded 2 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCC of Type B.pdf · uploaded 2 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCC of Type B1.pdf · uploaded 2 Aug 2017View
  • Copy of the legal title reportLand Title Clearance Certificate.pdf · uploaded 2 Aug 2017View
  • Building Plan Approval (IOD)Bldg Plan Type A.pdf · uploaded 2 Aug 2017View
  • Building Plan Approval (IOD)Bldg Plan Type A1.pdf · uploaded 2 Aug 2017View
  • Building Plan Approval (IOD)Bldg Plan Type B.pdf · uploaded 2 Aug 2017View
  • Building Plan Approval (IOD)Bldg Plan Type B1.pdf · uploaded 2 Aug 2017View
  • Copy of Layout Approval (in case of layout)Layout of Type A.pdf · uploaded 2 Aug 2017View
  • Copy of Layout Approval (in case of layout)Layout of Type A1.pdf · uploaded 2 Aug 2017View
  • Copy of Layout Approval (in case of layout)Layout of Type B.pdf · uploaded 2 Aug 2017View
  • Copy of Layout Approval (in case of layout)Layout of Type B1.pdf · uploaded 2 Aug 2017View
  • Copy of Layout Approval (in case of layout)Approved Layout.pdf · uploaded 2 Aug 2017View
  • Proforma of Allotment letterAllotement Letter.pdf · uploaded 2 Aug 2017View
  • Copy of the legal title reportLegal title possession receipts.pdf · uploaded 2 Aug 2017View
  • OtherWork Order.pdf · uploaded 2 Aug 2017View
  • OtherBank Adress.pdf · uploaded 2 Aug 2017View
  • Copy of the legal title reportSatbara extract.pdf · uploaded 2 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 2 Aug 2017View
  • OtherOccupationCertificate.pdf · uploaded 20 Dec 2018View
  • Certificates of Architect (Form 4)ArchitechCertificate.pdf · uploaded 20 Dec 2018View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC1.pdf · uploaded 12 Jul 2021View
  • Declaration about Commencement Certificate33MIG Architect.pdf · uploaded 23 Jul 2021View

Promoter documents

  • Declaration Form BAfadavit 1.pdf · uploaded 2 Aug 2017View
  • Legal Title reportLand Title Clearance Certificate.pdf · uploaded 2 Aug 2017View
  • Legal Title reportLegal title possession receipts.pdf · uploaded 2 Aug 2017View
  • Legal Title reportSatbara extract.pdf · uploaded 2 Aug 2017View

Technical documents

  • Building Plan ApprovalBldg Plan Type A.pdfView
  • Building Plan ApprovalBldg Plan Type A1.pdfView
  • Building Plan ApprovalBldg Plan Type B.pdfView
  • Building Plan ApprovalBldg Plan Type B1.pdfView
  • Layout ApprovalLayout of Type A.pdfView
  • Layout ApprovalLayout of Type A1.pdfView
  • Layout ApprovalLayout of Type B.pdfView
  • Layout ApprovalLayout of Type B1.pdfView
  • Layout ApprovalApproved Layout.pdfView

Other legal documents

  • OtherWork Order.pdfView
  • OtherBank Adress.pdfView
  • OtherOccupationCertificate.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotement Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sakegaon, Bhusawal taluka

Survey, CTS, gat or plot numbers

300/1BS. No. 300/1B

As published on MahaRERA's project page

S. No. 300/1B

Boundaries

North
S No 300-1A
South
S No 300-2-1A
East
S No 300-2-1A and S No 300-2B-1-2
West
S No 296

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVastu Chaitanya Chetan V Sonar—
EngineerDeltacom Consultants Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology