Construction of 30 HIG T/s. on plots of S. No. 299/1C and 299/2 at Sakegaon, Bhusawal, Dist. Jalgaon

Lapsed

Sakegaon, Jalgaon 425201 |Promoter: Nashik Housing And Area Development Board

Residential / Group HousingRERAP49900010896
31 Aug 2017Registered with MahaRERA
31 Dec 2019Promised completion
30 Dec 2021Revised completionPushed back 2 years
1Building
30Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
G plus One Row House30 units in all
Land area for this project
4,632 sq m (49,853 sq ft)
Permissible built-up area
3,591 sq m (38,655 sq ft)
Sanctioned built-up area
3,591 sq m (38,655 sq ft)
Recreational open space
2,106 sq m (22,673 sq ft)
Address
S No 299-1C and 299-2PIN 425201
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.17145, 73.11907
Construction of 30 HIG T/s. on plots of S. No. 299/1C and 299/2 at Sakegaon, Bhusawal, Dist. Jalgaon is at latitude 19.17145, longitude 73.11907.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years

The latest completion date on record passed 4 years and 10 months ago.

Registered
31 Aug 2017
Promised
31 Dec 2019
Revised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990001089631 Aug 201731 Dec 201930 Dec 2021Nashik Housing And Area Development BoardProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
HIG Type Row Houses1830

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

30 units registered

G plus One Row House · 30 units
TypeCarpet areaUnits
G plus One Row House2,908.2 sq m · 31,304 sq ft30

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000030

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

HIG Type Row Houses

  • Excavation40%
  • Basement (if any)20%
  • Podiums (if any)0%
  • Plinth20%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAvailable on adjoining Roads90%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Individual septic tanks with soak pit are Propose0%
  • Storm Water DrainsYet to be provided0%
  • Landscaping & Tree PlantingPlantation yet to be done0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceAlready provided in layout100%
  • Open ParkingYet to be provided0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 24 filings listed on MahaRERA's project page

Titles

Encumbrance

Commencement certificates

Form b

Registration certificate

Completion

Extension certificate

Others

Allotment letter

Layout plans

Building plan

Document library

  • Declaration in FORM BAfaidavit.pdf · uploaded 3 Aug 2017View
  • Copy of the legal title reportPossession Receipts Panchnama and Notification of S No 299 1C 299 2 Bhusawal 2.pdf · uploaded 3 Aug 2017View
  • Copy of the legal title reportSatbara 299 1C Bhusawal.pdf · uploaded 3 Aug 2017View
  • Copy of the legal title reportSatbara 299 2 Bhusawal.pdf · uploaded 3 Aug 2017View
  • Details of encumbrancesTitle Certificate.pdf · uploaded 3 Aug 2017View
  • Building Plan Approval (IOD)Approved Building Plan.pdf · uploaded 3 Aug 2017View
  • Copy of Layout Approval (in case of layout)Approved Layot of S No 299 1C 299 2.pdf · uploaded 3 Aug 2017View
  • Copy of Layout Approval (in case of layout)Approved Ammalgamation of Plots.pdf · uploaded 3 Aug 2017View
  • Copy of Layout Approval (in case of layout)Revised Approved Layout.pdf · uploaded 3 Aug 2017View
  • Copy of Layout Approval (in case of layout)Original Approval Letter of Layout.pdf · uploaded 3 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCC of Bhusawal MC.pdf · uploaded 3 Aug 2017View
  • Proforma of Allotment letterAllotement Letter.pdf · uploaded 3 Aug 2017View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC (2).pdf · uploaded 12 Jul 2021View
  • Declaration about Commencement CertificateArchitetCertificateSakegaon.pdf · uploaded 23 Jul 2021View

Promoter documents

  • Declaration Form BAfaidavit.pdf · uploaded 3 Aug 2017View
  • Legal Title reportPossession Receipts Panchnama and Notification of S No 299 1C 299 2 Bhusawal 2.pdf · uploaded 3 Aug 2017View
  • Legal Title reportSatbara 299 1C Bhusawal.pdf · uploaded 3 Aug 2017View
  • Legal Title reportSatbara 299 2 Bhusawal.pdf · uploaded 3 Aug 2017View

Technical documents

  • Building Plan ApprovalApproved Building Plan.pdfView
  • Layout ApprovalApproved Layot of S No 299 1C 299 2.pdfView
  • Layout ApprovalApproved Ammalgamation of Plots.pdfView
  • Layout ApprovalRevised Approved Layout.pdfView
  • Layout ApprovalOriginal Approval Letter of Layout.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotement Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sakegaon, Bhusawal taluka

Survey, CTS, gat or plot numbers

2992S No 2991C

As published on MahaRERA's project page

S No 299-1C and 299-2

Boundaries

North
S No 299-1 part
South
S No 299-3
East
Bhusawal Shiv
West
S No 300-2-1B and S No 300-1B-2

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHemantkumar Patil—
EngineerUjval R Choudhari—

Source: MahaRERA project page. Contact details are not shown.