Completed

Bhusawal (Ct), Jalgaon 425201 |Promoter: Rajesh Raka

11 Sep 2020Registered with MahaRERA
30 Jun 2023Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK, Shop12 units in all
Land area for this project
253 sq m (2,722 sq ft)
Permissible built-up area
351 sq m (3,781 sq ft)
Sanctioned built-up area
351 sq m (3,781 sq ft)
Address
93, Wanjola Road, Wanjola RoadPIN 425201
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.41490, 76.39670
Tulas is at latitude 21.41490, longitude 76.39670.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2023

The latest completion date on record passed 3 years and 4 months ago.

Registered
11 Sep 2020
Promised
30 Jun 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990002636311 Sep 202030 Jun 2023—Rajesh RakaProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Tulas512

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

2BHK · 7 unitsShop · 5 units
TypeCarpet areaUnits
2BHK38.3 sq m · 412 sq ft4
2BHK40.6 sq m · 437 sq ft3
Shop6.5 sq m · 70 sq ft1
Shop7.4 sq m · 80 sq ft2
Shop8.6 sq m · 93 sq ft1
Shop9.4 sq m · 101 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00007

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Tulas

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingCompleted100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 19 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 1

Form 2

Others

Registration certificate

Form 2a

Completion

Form 4

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title report93 Title clear certificate.pdf · uploaded 9 Sep 2020View
  • Building Plan Approval / NA Order for plotted development93 P.pdf · uploaded 9 Sep 2020View
  • Commencement Certificates / NA Order for plotted development93 CERT.pdf · uploaded 9 Sep 2020View
  • Copy of Layout Approval (in case of layout)app plan 196.pdf · uploaded 9 Sep 2020View
  • Declaration in FORM BForm B Tulas.pdf · uploaded 9 Sep 2020View
  • Details of encumbrancesSD Tulas.pdf · uploaded 9 Sep 2020View
  • Proforma of Allotment letterAGREEMENT FOR RERA _1_.pdf · uploaded 9 Sep 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHI TULAS.pdf · uploaded 27 Jun 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG TULAS.pdf · uploaded 27 Jun 2021View
  • Disclosure of sold/ booked inventoryDisclosure of sold flat.pdf · uploaded 27 Jun 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)tulas 2a.pdf · uploaded 5 Jul 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentTULAS COMPLETION CERTIFICATE.pdf · uploaded 23 Jun 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)tulas 2a.pdf · uploaded 23 Jun 2022View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 23 Jun 2022View

Promoter documents

  • Legal Title report93 Title clear certificate.pdf · uploaded 9 Sep 2020View
  • Declaration Form BForm B Tulas.pdf · uploaded 9 Sep 2020View

Technical documents

  • Building Plan Approval93 P.pdfView
  • Layout Approvalapp plan 196.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT FOR RERA _1_.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhusawal (CT), Bhusawal taluka

Survey, CTS, gat or plot numbers

93

As published on MahaRERA's project page

93

Boundaries

North
196 2a
South
9 Meter Wide Road
East
Plot no 94
West
10 meter wide vanjola road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDipak Phalak—
Chartered accountantAkshay Jadhav—
EngineerDipak Phalak—

Source: MahaRERA project page. Contact details are not shown.