Shakun Estates

Completed

Bhusawal (Ct), Jalgaon 425208 |Promoter: Rajesh Raka

7 Jan 2020Registered with MahaRERA
30 Jun 2023Promised completion
11Buildings
46Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Mixed
Status on MahaRERA
Completed
Buildings
11
Unit types
2BHK, Shop46 units in all
Land area for this project
1,030 sq m (11,087 sq ft)
Permissible built-up area
1,545 sq m (16,630 sq ft)
Sanctioned built-up area
1,545 sq m (16,630 sq ft)
Address
196/2b/Ato7, Mahesh Nagar, Wanjola Road Near National Highway 6PIN 425208
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.41490, 76.39670
Shakun Estates is at latitude 21.41490, longitude 76.39670.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2023

The latest completion date on record passed 3 years and 4 months ago.

Registered
7 Jan 2020
Promised
30 Jun 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000238427 Jan 202030 Jun 2023—Rajesh RakaProject page

11 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

46 units registered

2BHK · 28 unitsShop · 18 units
BuildingTypeCarpet areaUnits
Plot No 2 - 2BHK Flat2BHK40.2 sq m · 433 sq ft1
Plot No 2 - 2BHK Flats2BHK43 sq m · 463 sq ft6
Plot No 2 - ShopShop8.13 sq m · 88 sq ft1
Plot No 2 - ShopShop8.15 sq m · 88 sq ft1
Plot No 2 - ShopsShop7.31 sq m · 79 sq ft1
Plot No 2 - ShopsShop12.87 sq m · 139 sq ft1
Plot No 2 - ShopsShop16.64 sq m · 179 sq ft1
Plot No 32 - 2BHK Flats2BHK43 sq m · 463 sq ft7
Plot No 32 - ShopsShop9.08 sq m · 98 sq ft1
Plot No 32 - ShopsShop9.09 sq m · 98 sq ft1
Plot No 32 - ShopsShop11.49 sq m · 124 sq ft1
Plot No 32 - ShopsShop11.5 sq m · 124 sq ft1
Plot No 55 - 2BHK Flats2BHK43 sq m · 463 sq ft7
Plot No 55 - ShopShop7.45 sq m · 80 sq ft1
Plot No 55 - ShopShop7.47 sq m · 80 sq ft1
Plot No 55 - ShopsShop7.46 sq m · 80 sq ft2
Plot No 9 - 2BHK Flats2BHK43 sq m · 463 sq ft7
Plot No 9 - ShopsShop7.31 sq m · 79 sq ft1
Plot No 9 - ShopsShop8.13 sq m · 88 sq ft1
Plot No 9 - ShopsShop8.15 sq m · 88 sq ft1
Plot No 9 - ShopsShop12.87 sq m · 139 sq ft1
Plot No 9 - ShopsShop16.64 sq m · 179 sq ft1

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Plot No 2 - 2BHK FlatClosed/Covered00001
Plot No 2 - 2BHK FlatOpen Space00000
Plot No 2 - 2BHK FlatsClosed/Covered00001
Plot No 2 - 2BHK FlatsOpen Space00000
Plot No 2 - ShopClosed/Covered00001
Plot No 2 - ShopClosed/Covered00001
Plot No 2 - ShopOpen Space00000
Plot No 2 - ShopOpen Space00000
Plot No 2 - ShopsClosed/Covered00001
Plot No 2 - ShopsOpen Space00000
Plot No 32 - 2BHK FlatsClosed/Covered00002
Plot No 32 - 2BHK FlatsOpen Space00005
Plot No 32 - ShopsClosed/Covered00002
Plot No 32 - ShopsOpen Space00005
Plot No 55 - 2BHK FlatsClosed/Covered00002
Plot No 55 - 2BHK FlatsOpen Space00005
Plot No 55 - ShopClosed/Covered00002
Plot No 55 - ShopClosed/Covered00002
Plot No 55 - ShopOpen Space00005
Plot No 55 - ShopOpen Space00005
Plot No 55 - ShopsClosed/Covered00002
Plot No 55 - ShopsOpen Space00005
Plot No 9 - 2BHK FlatsClosed/Covered00000
Plot No 9 - 2BHK FlatsOpen Space00000
Plot No 9 - ShopsClosed/Covered00000
Plot No 9 - ShopsOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Plot No 2 - 2BHK Flat

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 2 - 2BHK Flats

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 2 - Shop

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 2 - Shops

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 32 - 2BHK Flats

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 32 - Shops

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 55 - 2BHK Flats

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 55 - Shop

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 55 - Shops

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 9 - 2BHK Flats

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot No 9 - Shops

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

45 documents held by Deedo, 90 filings listed on MahaRERA's project page

Titles

Encumbrance

Commencement certificates

Form b

Form 2s

Form 5s

Form 1s

Others

Form 2as

Registration certificate

Completion

Form 4

Layout plan

Building plans

Allotment letter

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 3 Jan 2020View
  • Copy of the legal title reportSearch Report plot no 2.pdf · uploaded 3 Jan 2020View
  • Proforma of Allotment letterAGREEMENT FOR RERA.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development2.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development25.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development26.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development27.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development42.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development43.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development44.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development45.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development46.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development47.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development48.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development49.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted development50.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development02.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development25.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development26.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development27.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development42.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development43.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development44.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development45.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development46.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development47.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development48.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development49.pdf · uploaded 3 Jan 2020View
  • Commencement Certificates / NA Order for plotted development50.pdf · uploaded 3 Jan 2020View
  • Details of encumbrancesSD RR.pdf · uploaded 3 Jan 2020View
  • Copy of Layout Approval (in case of layout)app plan 196.pdf · uploaded 3 Jan 2020View
  • Declaration in FORM BForm B RC.pdf · uploaded 3 Jan 2020View
  • Building Plan Approval / NA Order for plotted developmentPlot no 9 plan.pdf · uploaded 12 Feb 2020View
  • Building Plan Approval / NA Order for plotted developmentPlot no 32 plan.pdf · uploaded 12 Feb 2020View
  • Building Plan Approval / NA Order for plotted developmentPlot no 55 plan.pdf · uploaded 12 Feb 2020View
  • Commencement Certificates / NA Order for plotted development9 CERTIFICATE.pdf · uploaded 12 Feb 2020Source
  • Commencement Certificates / NA Order for plotted developmentCertificate 32.pdf · uploaded 12 Feb 2020View
  • Commencement Certificates / NA Order for plotted developmentCertificate 55.pdf · uploaded 12 Feb 2020View
  • Commencement Certificates / NA Order for plotted developmentCertificate 32.pdf · uploaded 12 Feb 2020View
  • Copy of the legal title report93 Title clear certificate.pdf · uploaded 13 Mar 2020View
  • Building Plan Approval / NA Order for plotted development93PLAN.pdf · uploaded 13 Mar 2020View
  • Commencement Certificates / NA Order for plotted development93CERT.pdf · uploaded 13 Mar 2020Source
  • Building Plan Approval / NA Order for plotted development93PLAN.pdf · uploaded 13 Mar 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 2.pdf · uploaded 9 Nov 2020Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 9.pdf · uploaded 9 Nov 2020Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 32.pdf · uploaded 9 Nov 2020Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 -55.pdf · uploaded 9 Nov 2020Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 9 Nov 2020View
  • OtherRera updation .pdf · uploaded 12 Nov 2020View
  • Details of Restarting of Construction work post lockdownRera updation .pdf · uploaded 12 Nov 2020View
  • Details of Restarting of Construction work post lockdownRera updation .pdf · uploaded 12 Nov 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)RERA RAJESH RAKA.pdf · uploaded 24 May 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHI PLOT 2.pdf · uploaded 27 Jun 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHI PLOT 9.pdf · uploaded 27 Jun 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHI PLOT 32.pdf · uploaded 27 Jun 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHI PLOT 55.pdf · uploaded 27 Jun 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)SHAKUN ENGINEER CERT.pdf · uploaded 27 Jun 2021View
  • Disclosure of sold/ booked inventoryDisclosure of sold inventory.pdf · uploaded 27 Jun 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)shubham 2a.pdf · uploaded 5 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)shakun bsl 2a.pdf · uploaded 5 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 SE- 07-02-22.pdf · uploaded 7 Feb 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 7 Feb 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 7 Feb 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentShakun estate 2,9,32,55_compressed.pdf · uploaded 7 Feb 2022View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 ARTICHECTS CERTIFICATE Plot 2 9 32 55.pdf · uploaded 9 Feb 2022View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 3 Jan 2020View
  • Legal Title reportSearch Report plot no 2.pdf · uploaded 3 Jan 2020View
  • Declaration Form BForm B RC.pdf · uploaded 3 Jan 2020View
  • Legal Title report93 Title clear certificate.pdf · uploaded 13 Mar 2020View

Technical documents

  • NA Order for Plotted Development27.pdfView
  • NA Order for Plotted Development42.pdfView
  • NA Order for Plotted Development43.pdfView
  • NA Order for Plotted Development44.pdfView
  • NA Order for Plotted Development45.pdfView
  • NA Order for Plotted Development46.pdfView
  • NA Order for Plotted Development47.pdfView
  • NA Order for Plotted Development48.pdfView
  • NA Order for Plotted Development49.pdfView
  • NA Order for Plotted Development50.pdfView
  • Layout Approvalapp plan 196.pdfView
  • NA Order for Plotted Development2.pdfView
  • NA Order for Plotted Development25.pdfView
  • NA Order for Plotted Development26.pdfView
  • NA Order for Plotted DevelopmentPlot no 9 plan.pdfView
  • NA Order for Plotted DevelopmentPlot no 32 plan.pdfView
  • NA Order for Plotted DevelopmentPlot no 55 plan.pdfView
  • NA Order for Plotted Development93PLAN.pdfView
  • NA Order for Plotted Development93PLAN.pdfView

Other legal documents

  • OtherRera updation .pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT FOR RERA.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhusawal (CT), Bhusawal taluka

Survey, CTS, gat or plot numbers

196/2B/ATO7

As published on MahaRERA's project page

196/2B/ATO7

Boundaries

North
196 2a
South
12 meter wide DP road
East
15 meter wide DP road
West
Remaining part of plot

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDipak Phalak—
Chartered accountantAkshay Jadhav—
EngineerDipak Phalak—
OtherRajesh Raka—

Source: MahaRERA project page. Contact details are not shown.