Skip to content
Deedo home
Menu

Sankalp Residency

Completed

Bhusawal (Ct), Jalgaon 425201 |Promoter: Ravindra Supadu Pawar

Residential / Group HousingRERAP49900008721
19 Aug 2017Registered with MahaRERA
31 Jul 2018Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK, Shop12 units in all
Land area for this project
442 sq m (4,758 sq ft)
Permissible built-up area
614 sq m (6,608 sq ft)
Sanctioned built-up area
614 sq m (6,608 sq ft)
Address
Plot No.2 S.no. 78/1bPIN 425201
Designated bank account
Bandhan Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.12393, 72.90944
Sankalp Residency is at latitude 19.12393, longitude 72.90944.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Jul 2018

The latest completion date on record passed 8 years and 3 months ago.

Registered
19 Aug 2017
Promised
31 Jul 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990000872119 Aug 201731 Jul 2018—Ravindra Supadu PawarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sankalp Residency512

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

2BHK · 10 unitsShop · 2 units
TypeCarpet areaUnits
2BHK42.2 sq m · 454 sq ft10
Shop31.29 sq m · 337 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sankalp Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DONE100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingDONE100%
  • Street LightingDONE100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationMETER ROOM100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 19 filings listed on MahaRERA's project page

Allotment letter (2)

Title report

Encumbrance details

Commencement certificate

Form B

Form 1

Form 2

Show all 35 documentsShow fewer documents

Registration certificate

Form 4

Form 5

Other (3)

Layout plan

Building plan

Document library

  • Commencement Certificates / NA Order for plotted developmentcommencemnrt cert.pdf · uploaded 29 Jul 2017View
  • Copy of the legal title reportRDJ_Scan_29-07-2017 TITLE REPORT.pdf · uploaded 29 Jul 2017View
  • Copy of Layout Approval (in case of layout)LAYOUT COPY.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)SAN PLAN1.pdf · uploaded 29 Jul 2017View
  • Declaration in FORM Bscan_0001 FORM B PROMOTER.pdf · uploaded 29 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)arch cert.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engg cert.pdf · uploaded 29 Jul 2017View
  • Details of encumbrancesNIRVAN 1.pdf · uploaded 29 Jul 2017View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 29 Jul 2017View
  • Proforma of Allotment letterANNEXURE A AFS.pdf · uploaded 30 Jul 2017View
  • OtherCOMPLETION CERTIFICATE.pdf · uploaded 16 Nov 2017View
  • Certificates of Architect (Form 4)FORM 4 RDJ_Scan_30-05-2018.pdf · uploaded 31 May 2018View
  • Certificates of CA (Form 5)FORM 5.pdf · uploaded 22 Jan 2019View

Promoter documents

  • Legal Title reportRDJ_Scan_29-07-2017 TITLE REPORT.pdf · uploaded 29 Jul 2017View
  • Declaration Form Bscan_0001 FORM B PROMOTER.pdf · uploaded 29 Jul 2017View

Technical documents

  • Layout ApprovalLAYOUT COPY.pdfView
  • Building Plan ApprovalSAN PLAN1.pdfView

Other legal documents

  • OtherCOMPLETION CERTIFICATE.pdfView

Proforma allotment letter

  • Proforma allotment letterANNEXURE A AFS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhusawal (CT), Bhusawal taluka

Survey, CTS, gat or plot numbers

278/1BPLOT NO.2 S.NO. 78/1B

As published on MahaRERA's project page

PLOT NO.2 S.NO. 78/1B

Boundaries

North
Plot No 1
South
Plot No 3
East
24 Meter Road
West
Adjoining Open Space And Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMilind Rathi—
EngineerMilind S Rathi—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology