Wing B · Pushpchhaya River View
Bhusawal (Ct) · RERA P49900006545
IDBLD_0064573 floorsCompleted
3Sanctioned habitable floorsregistration certificate
17 Nov 2019Promised completion
Floors
3 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 3
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| FLAT NO. B1 | 54.7 m² (588 sq.ft) | 1 | not published |
| FLAT NO. B11 | 54.7 m² (588 sq.ft) | 1 | not published |
| FLAT NO B12 | 54.7 m² (588 sq.ft) | 1 | not published |
| FLAT NO. B13 | 54.7 m² (588 sq.ft) | 1 | not published |
| FLAT NO. B14 | 54.7 m² (588 sq.ft) | 1 | not published |
| FLAT NO. B15 | 37.4 m² (403 sq.ft) | 1 | not published |
| FLAT NO. B16 | 56.8 m² (611 sq.ft) | 1 | not published |
| FLAT NO. B17 | 56.8 m² (611 sq.ft) | 1 | not published |
| FLAT NO. B2 | 54.7 m² (588 sq.ft) | 1 | not published |
| FLAT NO. B21 | 46.7 m² (503 sq.ft) | 1 | not published |
Show all 21 unit typesShow fewer unit types
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| FLAT NO. B22 | 46.7 m² (503 sq.ft) | 1 | not published |
| FLAT NO. B23 | 46.7 m² (503 sq.ft) | 1 | not published |
| FLAT NO. B24 | 46.7 m² (503 sq.ft) | 1 | not published |
| FLAT NO. B25 | 37.4 m² (403 sq.ft) | 1 | not published |
| FLAT NO. B26 | 48.6 m² (523 sq.ft) | 1 | not published |
| FLAT NO. B27 | 48.6 m² (523 sq.ft) | 1 | not published |
| FLAT NO. B3 | 54.7 m² (588 sq.ft) | 1 | not published |
| FLAT NO. B4 | 54.7 m² (588 sq.ft) | 1 | not published |
| FLAT NO. B5 | 37.4 m² (403 sq.ft) | 1 | not published |
| FLAT NO. B6 | 56.8 m² (611 sq.ft) | 1 | not published |
| FLAT NO. B 7 | 56.8 m² (611 sq.ft) | 1 | not published |
| Total | 21 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor0%
- Slabs of Super Structure66%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises16%
- Sanitary Fittings within the flats / premises0%
Show all 11 activitiesShow fewer activities
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology