Wing B · Pushpchhaya River View

Bhusawal (Ct) · RERA P49900006545

IDBLD_0064573 floorsCompleted
3Sanctioned habitable floorsregistration certificate
17 Nov 2019Promised completion

Floors

3 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P49900006545 · registered 14 Aug 2017
Promised completion
17 Nov 2019
Sanctioned habitable floors
3

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
FLAT NO. B154.7 m² (588 sq.ft)1not published
FLAT NO. B1154.7 m² (588 sq.ft)1not published
FLAT NO B1254.7 m² (588 sq.ft)1not published
FLAT NO. B1354.7 m² (588 sq.ft)1not published
FLAT NO. B1454.7 m² (588 sq.ft)1not published
FLAT NO. B1537.4 m² (403 sq.ft)1not published
FLAT NO. B1656.8 m² (611 sq.ft)1not published
FLAT NO. B1756.8 m² (611 sq.ft)1not published
FLAT NO. B254.7 m² (588 sq.ft)1not published
FLAT NO. B2146.7 m² (503 sq.ft)1not published
Show all 21 unit typesShow fewer unit types
TypeCarpet areaUnitsBooked
FLAT NO. B2246.7 m² (503 sq.ft)1not published
FLAT NO. B2346.7 m² (503 sq.ft)1not published
FLAT NO. B2446.7 m² (503 sq.ft)1not published
FLAT NO. B2537.4 m² (403 sq.ft)1not published
FLAT NO. B2648.6 m² (523 sq.ft)1not published
FLAT NO. B2748.6 m² (523 sq.ft)1not published
FLAT NO. B354.7 m² (588 sq.ft)1not published
FLAT NO. B454.7 m² (588 sq.ft)1not published
FLAT NO. B537.4 m² (403 sq.ft)1not published
FLAT NO. B656.8 m² (611 sq.ft)1not published
FLAT NO. B 756.8 m² (611 sq.ft)1not published
Total21

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure66%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises16%
  • Sanitary Fittings within the flats / premises0%
Show all 11 activitiesShow fewer activities
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology