Casa De Royale

Active

Bhusawal (Ct), Jalgaon 425201 |Promoter: Raka Constructions

Residential / Group HousingRERAP49900078963
24 Jan 2025Registered with MahaRERA
31 Dec 2027Promised completion
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
2
Land area for this project
1,906 sq m (20,513 sq ft)
Permissible built-up area
2,896 sq m (31,172 sq ft)
Sanctioned built-up area
1,896 sq m (20,408 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
Bhusaval Municipal Council, Bhusaval
Address
Plot No. 88 + 89, S. No. 196/2B/1 to 7, Mahesh Nagar, BhusawalPIN 425201
Designated bank account
Jalgaon Janata Sahakari Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Casa De Royale is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2027

Registered
24 Jan 2025
Promised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990007896324 Jan 202531 Dec 2027—Raka ConstructionsProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P49900078963)——
Row House1—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Row House

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure75%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
  • Sanitary Fittings within the flats / premises35%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsTo be completed with project0%
  • Water SupplyTo be completed with project0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)To be completed with project0%
  • Storm Water DrainsTo be completed with project0%
  • Landscaping & Tree PlantingTo be completed with project0%
  • Street LightingTo be completed with project0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingTo be completed with project0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationTo be completed with project0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

36 documents held by Deedo, 49 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Commencement certificate (2)

Other (13)

Show all 85 documentsShow fewer documents

Other (13)

Allotment letter (2)

Registration certificate

Form 1 (7)

Form 2 (6)

Layout plan

Building plan

Document library

  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 5 Jan 2025View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 5 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentPlan.pdf · uploaded 5 Jan 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Bank Letter.pdf · uploaded 5 Jan 2025View
  • Other – LegalSale Deed.pdf · uploaded 5 Jan 2025View
  • Other – Legal7-12.pdf · uploaded 5 Jan 2025View
  • Copy of the legal title reportTitle Search Report Annexure.pdf · uploaded 5 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 5 Jan 2025View
  • a Details of encumbrances concerned to FinanceEncumbrance Certificate.pdf · uploaded 5 Jan 2025View
  • CERSAI detailsCERSAI Report.pdf · uploaded 5 Jan 2025View
  • b Details of encumbrances concerned to LegalEncumbrance Certificate.pdf · uploaded 5 Jan 2025View
  • Deviation Report with respect to Allotment letterDeviation Report - Allotment Letter.pdf · uploaded 5 Jan 2025View
  • Deviation Report with respect to model copy of AgreementDeviation Report - Agreement.pdf · uploaded 5 Jan 2025View
  • Disclosure for secured/unsecured finance availed for the projectDisclosure of Finance.pdf · uploaded 5 Jan 2025View
  • Declaration about all RERA Designated Bank Accounts (Format A)Declaration about RERA Bank Account Details.pdf · uploaded 5 Jan 2025View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 5 Jan 2025View
  • Declaration in FORM BForm B.pdf · uploaded 5 Jan 2025View
  • Other – TechnicalAnnexure A.pdf · uploaded 5 Jan 2025View
  • Proforma of Agreement for saleSample Agreement.pdf · uploaded 5 Jan 2025View
  • Other – FinanceSelf Declaration.pdf · uploaded 20 Jan 2025View
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 20 Jan 2025View
  • Other – TechnicalCC.pdf · uploaded 20 Jan 2025View
  • Withdrawal Update Form 1FORM 1 MARCH.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 2FORM 2 MARCH 25.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 1FORM 1 JUNE.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 2FORM 2 JUNE 25.pdf · uploaded 20 Feb 2026View
  • Form 1FORM 1 MARCH.pdf · uploaded 20 Feb 2026View
  • Form 2FORM 2 MARCH 25.pdf · uploaded 20 Feb 2026View
  • Disclosure of Sold and Booked InventoryFORM 1 MARCH.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 1FORM 1 JUNE.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 2FORM 2 JUNE 25.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 1FORM 1 SEPT..pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 2FORM 2 SEPT 25.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 1FORM 1 DECEMBER.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 2FORM 2 DEC 25.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 13 May 2026View
  • Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 13 May 2026View
  • Withdrawal Update Form 1Form 1 March 26.pdf · uploaded 14 May 2026View
  • Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 14 May 2026View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 28 Aug 2026View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 28 Aug 2026View

Promoter documents

  • Legal Title reportTitle Search Report Annexure.pdf · uploaded 5 Jan 2025View
  • Declaration Form BForm B.pdf · uploaded 5 Jan 2025View

Technical documents

  • Building Plan ApprovalPlan.pdfView
  • Layout ApprovalLayout.pdfView

Other legal documents

  • Other – Legal7-12.pdfView
  • Other – LegalSale Deed.pdfView

Financial documents

  • Other – FinanceSelf Declaration.pdf · uploaded 20 Jan 2025View

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhusawal (CT), Bhusawal taluka

Survey, CTS, gat or plot numbers

Plot No. 88 + 89S. No. 196/2B/1 to 7

As published on MahaRERA's project page

Plot No. 88 + 89, S. No. 196/2B/1 to 7

Boundaries

North
By Plot No 87
South
By Plot No 90 91 92
East
By 9 Mtr Wide Road
West
By Adj S No 197

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDipak Phalak—
ArchitectRajesh B Chandan—
Chartered accountantAkshay Jadhav & Co—
EngineerAnil Tulshiram Patil—
EngineerRajesh B Chandan—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology