G K Market Phase 1

Completed

Walwadi (Ct), Dhule 424002 |Promoter: Gopal Kashinath Kele

15 Jun 2022Registered with MahaRERA
15 Jun 2023Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK, Shop12 units in all
Land area for this project
239 sq m (2,573 sq ft)
Permissible built-up area
218 sq m (2,344 sq ft)
Sanctioned built-up area
218 sq m (2,344 sq ft)
Address
Plot No 01 Survey No 133/2 Walwadi Deopur Dhule, Plot No 01 Survey No 133 2 Walwadi Deopur Dhule, Walwadi ShivarPIN 424002
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
G K Market Phase 1 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 Jun 2023

The latest completion date on record passed 3 years and 4 months ago.

Registered
15 Jun 2022
Promised
15 Jun 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4980004581415 Jun 202215 Jun 2023—Gopal Kashinath KeleProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
G K Market Phase 1312

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

1BHK · 4 unitsShop · 8 units
TypeCarpet areaUnits
1BHK34.46 sq m · 371 sq ft2
1BHK35.96 sq m · 387 sq ft2
Shop6.23 sq m · 67 sq ft1
Shop6.32 sq m · 68 sq ft1
Shop6.54 sq m · 70 sq ft6

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000012

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

G K Market Phase 1

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER DMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER DRAWING100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER DMC100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAS PER RULE100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER DMC100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER RULE100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER DMC100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

25 documents held by Deedo, 28 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificates

Form 1s

Form 2s

Allotment letters

Others

Form b

Registration certificate

Completion

Form 4

Layout plan

Building plan

Document library

  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificates.pdf · uploaded 19 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 19 May 2022View
  • Details of encumbrancesDetails of Encumbrances.pdf · uploaded 19 May 2022View
  • Copy of the legal title reportFormat A Legal Title Report.pdf · uploaded 19 May 2022View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 19 May 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 19 May 2022View
  • Declaration about Commencement Certificatedeclecration cc.pdf · uploaded 19 May 2022View
  • Proforma of Allotment letterAgreement Formet.pdf · uploaded 19 May 2022View
  • CERSAI detailsIMG_20220523_0002_NEW.pdf · uploaded 23 May 2022View
  • Other133-2 POA-20220516105651_compressed.pdf · uploaded 23 May 2022View
  • Declaration in FORM BForm B New_compressed.pdf · uploaded 2 Jun 2022View
  • Copy of Layout Approval (in case of layout)133 Lay Out.pdf · uploaded 2 Jun 2022View
  • Commencement Certificates / NA Order for plotted developmentG K MARKET CC.pdf · uploaded 9 Jun 2022View
  • Commencement Certificates / NA Order for plotted developmentN A ORDER NEW_compressed.pdf · uploaded 9 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentAdobe Scan 14-Oct-2022.pdf · uploaded 2 Nov 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 2 Nov 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form No 2.pdf · uploaded 2 Nov 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Index -ii.pdf · uploaded 2 Nov 2022Source
  • Status of ConveyanceIndex -ii.pdf · uploaded 2 Nov 2022Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 5 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 5 Apr 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form No 4.pdf · uploaded 5 Apr 2023View

Promoter documents

  • Legal Title reportFormat A Legal Title Report.pdf · uploaded 19 May 2022View
  • Declaration Form BForm B New_compressed.pdf · uploaded 2 Jun 2022View

Technical documents

  • Building Plan ApprovalBuilding Plan.pdfView
  • Layout Approval133 Lay Out.pdfView

Other legal documents

  • Other133-2 POA-20220516105651_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Walwadi (CT), Dhule taluka

Survey, CTS, gat or plot numbers

01PLOT NO 01 SURVEY NO 133/2 WALWADI DEOPUR DHULE

As published on MahaRERA's project page

PLOT NO 01 SURVEY NO 133/2 WALWADI DEOPUR DHULE

Boundaries

North
Road
South
Road
East
Road
West
Remaining Poration Of Survey No 133

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNivara Construction—
Chartered accountantBipinchandra jain—
EngineerHemant B Isai—

Source: MahaRERA project page. Contact details are not shown.