Skip to content
Deedo home
Menu

Jayshree Building

Lapsed

Motala, Buldana 443103 |Promoter: Rajesh Gulabchand Rathi

23 Feb 2021Registered with MahaRERA
15 Dec 2023Promised completion
1Building
20Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Lapsed
Buildings
1
Unit types
Shop20 units in all
Land area for this project
453 sq m (4,876 sq ft)
Permissible built-up area
262 sq m (2,820 sq ft)
Sanctioned built-up area
262 sq m (2,820 sq ft)
Address
8, Malkapur Road, Motala, At Post Motala Tq Motala Dist Buldnaa Pinb 443103, Malkapur RoadPIN 443103
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Jayshree Building is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 Dec 2023

The latest completion date on record passed 2 years and 10 months ago.

Registered
23 Feb 2021
Promised
15 Dec 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5000002838823 Feb 202115 Dec 2023—Rajesh Gulabchand RathiProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Jayshree Building120

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

20 units registered

Shop · 20 units
TypeCarpet areaUnits
Shop7.5 sq m · 81 sq ft2
Shop8.46 sq m · 91 sq ft2
Shop11.16 sq m · 120 sq ft2
Shop13.2 sq m · 142 sq ft12
Shop13.86 sq m · 149 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Jayshree Building

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure1%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
  • Sanitary Fittings within the flats / premises10%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

10 documents held by Deedo, 12 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Registration certificate

Others

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportSearch.pdf · uploaded 15 Feb 2021View
  • Copy of Layout Approval (in case of layout)NA.pdf · uploaded 15 Feb 2021View
  • Building Plan Approval / NA Order for plotted developmentMAP.pdf · uploaded 15 Feb 2021View
  • Commencement Certificates / NA Order for plotted developmentPermission.pdf · uploaded 15 Feb 2021View
  • Proforma of Allotment letterAGREEMENT PROFARMA.pdf · uploaded 15 Feb 2021View
  • Details of encumbrancesimg021-converted.pdf · uploaded 15 Feb 2021View
  • Declaration in FORM Bform b.pdf · uploaded 17 Feb 2021View

Promoter documents

  • Legal Title reportSearch.pdf · uploaded 15 Feb 2021View
  • Declaration Form Bform b.pdf · uploaded 17 Feb 2021View

Technical documents

  • Layout ApprovalNA.pdfView
  • Building Plan ApprovalMAP.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT PROFARMA.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Motala, Motala taluka

Survey, CTS, gat or plot numbers

8

As published on MahaRERA's project page

8

Boundaries

North
Land Of Pandhari Patil
South
Malkapur Buldana Road
East
Plot No 9
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPawan Rupchand Rathi—
Chartered accountantSneha Rohan Chaudhari—
EngineerAmol Pandhari Kiroche—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology