Golok Dham

Completed

Warud, Aurangabad 431154 |Promoter: Shakti Lifespaces Pvt Ltd

15 Feb 2022Registered with MahaRERA
31 Dec 2027Promised completion
4Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
4
Land area for this project
5,801 sq m (62,442 sq ft)
Permissible built-up area
19,857 sq m (2,13,734 sq ft)
Sanctioned built-up area
19,857 sq m (2,13,734 sq ft)
Address
Plot No 02 Gut No 231 P Warud Kazi, Jalna Road, Warud KaziPIN 431154
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Golok Dham is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2027

Registered
15 Feb 2022
Promised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150003328915 Feb 202231 Dec 2027—Shakti Lifespaces Pvt LtdProject page

4 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A Type Row House Block IClosed/Covered00000
A Type Row House Block IOpen Space00000
A Type Row House Block IIClosed/Covered00000
A Type Row House Block IIOpen Space00000
B Type BuildingClosed/Covered000053
B Type BuildingOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A Type Row House Block I

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A Type Row House Block II

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B Type Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & Footpathscompleted100%
  • Water SupplyCompleted100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingCompleted100%
  • Street LightingCompleted100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCompleted100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

66 documents held by Deedo, 76 filings listed on MahaRERA's project page

Title report

Encumbrance details (2)

Commencement certificate (2)

Form B

Other (15)

Show all 142 documentsShow fewer documents

Other (15)

Allotment letter (2)

Form 1 (10)

Form 2A (9)

Form 2 (10)

Form 5 (3)

Registration certificate

Form 4

Occupancy / completion certificate

  • Occupancy / completion certificate27 Nov 2024ViewSource

Layout plan

Building plan (7)

Document library

  • Details of encumbrancesNON ENCUMBRANCE.pdf · uploaded 8 Feb 2022View
  • Declaration about Commencement CertificateDECLERATION.pdf · uploaded 8 Feb 2022View
  • Declaration in FORM BFORM B.pdf · uploaded 8 Feb 2022View
  • CERSAI detailsAsset Based Search.pdf · uploaded 8 Feb 2022View
  • CERSAI detailsUNDERTAKING.pdf · uploaded 8 Feb 2022View
  • Commencement Certificates / NA Order for plotted developmentREV BP ORDER.pdf · uploaded 8 Feb 2022View
  • Copy of the legal title reportSEARCH CUM TITLE REPORT (MAHA RERA) CREDENCE (1).pdf · uploaded 8 Feb 2022View
  • Proforma of Allotment letterAFS.pdf · uploaded 8 Feb 2022View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 8 Feb 2022View
  • Copy of Layout Approval (in case of layout)1 (1).pdf · uploaded 8 Feb 2022View
  • Building Plan Approval / NA Order for plotted development1 (1).pdf · uploaded 8 Feb 2022View
  • Building Plan Approval / NA Order for plotted development1 (2).pdf · uploaded 8 Feb 2022View
  • Building Plan Approval / NA Order for plotted development1 (3).pdf · uploaded 8 Feb 2022View
  • Building Plan Approval / NA Order for plotted development1 (4).pdf · uploaded 8 Feb 2022View
  • Building Plan Approval / NA Order for plotted development1 (5).pdf · uploaded 8 Feb 2022View
  • Building Plan Approval / NA Order for plotted development1 (6).pdf · uploaded 8 Feb 2022View
  • Building Plan Approval / NA Order for plotted development1 (7).pdf · uploaded 8 Feb 2022View
  • Building Plan Approval / NA Order for plotted development1 (8).pdf · uploaded 8 Feb 2022View
  • Details of encumbrancesindex 2.pdf · uploaded 15 Oct 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC JUN 22.pdf · uploaded 20 Oct 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC MAR 22.pdf · uploaded 20 Oct 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A MAR 22.pdf · uploaded 14 Nov 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A JUN 22.pdf · uploaded 14 Nov 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Mar-22.pdf · uploaded 2 Dec 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Mar-22.pdf · uploaded 2 Dec 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate June-22.pdf · uploaded 2 Dec 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Sept-22.pdf · uploaded 2 Dec 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Dec-22.pdf · uploaded 7 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Site Supervisor Dec-22.pdf · uploaded 7 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Certificate Dec-22.pdf · uploaded 7 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 21-22.pdf · uploaded 13 Jul 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)GD Architect Certificate Mar-23.pdf · uploaded 21 Sep 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)GD Engineer Certificate Mar-23(1).pdf · uploaded 21 Sep 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)GD Supervisor Certificate march-23.pdf · uploaded 21 Sep 2023View
  • Disclosure of sold/ booked inventoryDISCLOSUR MARCH 2022.pdf · uploaded 21 Sep 2023View
  • Disclosure of sold/ booked inventoryDISCLOSUR JUNE-2022.pdf · uploaded 21 Sep 2023View
  • Disclosure of sold/ booked inventoryDISCLOSUR SEPT 2022.pdf · uploaded 21 Sep 2023View
  • Disclosure of sold/ booked inventoryDISCLOSUR DEC-2022.pdf · uploaded 21 Sep 2023View
  • Disclosure of sold/ booked inventoryDISCLOSUR MARCH 2023.pdf · uploaded 21 Sep 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)GD Architect Certificate June-23.pdf · uploaded 25 Sep 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)GD Engineer Certificate June-23.pdf · uploaded 25 Sep 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)GD Superwisor Certificate June-23.pdf · uploaded 25 Sep 2023View
  • Disclosure of sold/ booked inventoryDISCLOSUR JUNE-2023.pdf · uploaded 25 Sep 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)GD Architect Certeficate Sept-23.pdf · uploaded 21 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)GD Engineer Certificate Sept-23.pdf · uploaded 21 Nov 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)GD Supervisor Certificate Sept-23.pdf · uploaded 21 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)GD Arch Cer Q-3.pdf · uploaded 31 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)GD Engineer's Certificate.pdf · uploaded 31 Jan 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)GD Supervisor's Certificate.pdf · uploaded 31 Jan 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Documnets .pdf · uploaded 6 Feb 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Mar-24 GD ARCH CERTIFICATE.pdf · uploaded 27 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)MAR-24 GD ENGINEER CERTIFICATE.pdf · uploaded 27 Apr 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)MAR-24 GD SITE SUPERVISOR.pdf · uploaded 27 Apr 2024View
  • Disclosure of sold/ booked inventoryGOLOK DHAM 30-09-2023 - converted.pdf · uploaded 25 May 2024View
  • Disclosure of sold/ booked inventoryGOLOK DHAM 31-12-2023 - converted.pdf · uploaded 25 May 2024View
  • Disclosure of sold/ booked inventoryGD Mar-24 Discloser - converted (1).pdf · uploaded 25 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)GD JUNE-24 Form 1 - Architect's Certificate.pdf · uploaded 14 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)GD June-24 GD 2 Form 2 - Engineer's Certificate.pdf · uploaded 14 Jul 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)GD June-24 New Foemat Form - 2A.pdf · uploaded 14 Jul 2024View
  • Disclosure of sold/ booked inventoryJune-2024 Q1 - converted.pdf · uploaded 15 Jul 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGOLOK DHAM FULL OCCUPANCY CERTIFICATE FINAL.pdf · uploaded 27 Nov 2024View
  • Architect’s Certificate on Completion of Project (Form 4)ARCHITECT'S CERTIFICATE.pdf · uploaded 27 Nov 2024View
  • Status of Formation of Legal Entity (Society/Co Op etc.)GD Association Certificate.pdf · uploaded 27 Nov 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5_GOLOK DHAM_Mar2024.pdf · uploaded 3 Apr 2025View

Promoter documents

  • Declaration Form BFORM B.pdf · uploaded 8 Feb 2022View
  • Legal Title reportSEARCH CUM TITLE REPORT (MAHA RERA) CREDENCE (1).pdf · uploaded 8 Feb 2022View

Technical documents

  • Layout Approval1 (1).pdfView
  • Building Plan Approval1 (1).pdfView
  • Building Plan Approval1 (2).pdfView
  • Building Plan Approval1 (3).pdfView
  • Building Plan Approval1 (4).pdfView
  • Building Plan Approval1 (5).pdfView
  • Building Plan Approval1 (6).pdfView
  • Building Plan Approval1 (7).pdfView
  • Building Plan Approval1 (8).pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Warud, Aurangabad taluka

Survey, CTS, gat or plot numbers

Plot No 02 Gut No 231 P Warud Kazi

As published on MahaRERA's project page

Plot No 02 Gut No 231 P Warud Kazi

Boundaries

North
12 Mtr DP Road And Gut No 230
South
Gut No 231 P
East
45 Mtr DP Road
West
Plot No 1 Gut No 231 P

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectEthque Architect and Associates—
Chartered accountantNarendra Navandar & Co—
EngineerShriniwas Karanjikar—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology