Skip to content
Deedo home
Menu
BLD_007289Completed5 floors

Block No 4 · The Vidarbha Premier Ambanagri Kiran Nagar Amravti

Amravati (M Corp.) · RERA P50300013412

5Sanctioned habitable floorsregistration certificate
31 Dec 2017Promised completion

Floors

5 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50300013412 · registered 4 Oct 2017
Promised completion
31 Dec 2017
Sanctioned habitable floors
5

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
2 BHK140.6 m² (1,513 sq.ft)2not published
B TYPE148.9 m² (1,603 sq.ft)2not published
C TYPE148.7 m² (1,601 sq.ft)2not published
D TYPE140.1 m² (1,508 sq.ft)2not published
E TYPE140.9 m² (1,517 sq.ft)2not published
F TYPE417.3 m² (4,491 sq.ft)6not published
G TYPE442.1 m² (4,758 sq.ft)6not published
H TYPE441.4 m² (4,752 sq.ft)6not published
I TYPE412.9 m² (4,444 sq.ft)6not published
J TYPE415.4 m² (4,471 sq.ft)6not published
K TYPE416.2 m² (4,480 sq.ft)6not published
Total46

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0001
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology