My Orchid Heights Phase I

Active

Amravati (M Corp.), Amravati 444602 |Promoter: Nitin Bhatkar

Residential / Group HousingRERAP50300056450
31 May 2024Registered with MahaRERA
31 Dec 2028Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Land area for this project
1,568 sq m (16,873 sq ft)
Permissible built-up area
6,270 sq m (67,493 sq ft)
Sanctioned built-up area
6,270 sq m (67,493 sq ft)
Recreational open space
810 sq m (8,719 sq ft)
Planning authority
Amravati Municipal Corporation
Address
PLOT NO. 01 S.NO. 215/1-B, Mouje Rahatgaon, RahatgaonPIN 444602
Designated bank account
Dcb Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.97558, 77.76808
My Orchid Heights Phase I is at latitude 20.97558, longitude 77.76808.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
31 May 2024
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030005645031 May 202431 Dec 2028—Nitin BhatkarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building no 1 Wing A16—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered01001
Open Space0170118

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building no 1 Wing A

  • Excavation100%
  • Basement (if any)80%
  • Podiums (if any)0%
  • Plinth80%
  • Stilt Floor80%
  • Slabs of Super Structure80%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsInternal Road Only0%
  • Water Supplyavailable0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)available0%
  • Storm Water Drainsavailable0%
  • Landscaping & Tree Plantingavailable0%
  • Street Lightingavailable0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingavailable0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsas per sanction map0%
  • Electrical meter room, sub-station, receiving stationas per sanction map0%
  • Aggregate area of recreational Open Spaceas per sanction map0%
  • Open Parkingas per sanction map0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

33 documents held by Deedo, 71 filings listed on MahaRERA's project page

Form b

Others

Encumbrances

Allotment letters

Form 1s

Registration certificate

Form 5

Form 2s

Document library

  • Copy of the legal title reportLegale Title Report My Orchid Heights_compressed.pdf · uploaded 10 Apr 2024Source
  • Proforma of Agreement for saleAgreement of sale rera .pdf · uploaded 17 Apr 2024View
  • Proforma of Allotment letterBhatkar allotment letter.pdf · uploaded 17 Apr 2024View
  • Declaration in FORM BMy Orchid Heights Form B Nitin.pdf · uploaded 17 Apr 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsInterest in other org.pdf · uploaded 17 Apr 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank account declaration.pdf · uploaded 17 Apr 2024View
  • a Details of encumbrances concerned to FinanceFinancial ENcu.pdf · uploaded 17 Apr 2024Source
  • b Details of encumbrances concerned to LegalFinancial ENcu.pdf · uploaded 17 Apr 2024Source
  • Copy of Layout Approval (in case of layout)map 2 for RERA_compressed.pdf · uploaded 17 Apr 2024Source
  • Building Plan Approval / NA Order for plotted developmentmap 2 for RERA_compressed.pdf · uploaded 17 Apr 2024Source
  • Building Plan Approval / NA Order for plotted developmentmap 1_compressed.pdf · uploaded 17 Apr 2024Source
  • a Details of encumbrances concerned to FinanceDeclaration for legal non encumbrance.pdf · uploaded 17 Apr 2024Source
  • b Details of encumbrances concerned to LegalDeclaration for legal non encumbrance.pdf · uploaded 17 Apr 2024Source
  • CERSAI detailsDeclaration about cersai report.pdf · uploaded 17 Apr 2024View
  • Other – Legalannexure A final.pdf · uploaded 17 Apr 2024View
  • Deviation Report with respect to Allotment letterDEVIATION REPORT FOR ALLOTMENT LETTER.pdf · uploaded 17 Apr 2024View
  • Deviation Report with respect to model copy of AgreementDEVIATION REPORT FOR AGREEMENT FOR SALE.pdf · uploaded 17 Apr 2024View
  • Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 22 Apr 2024Source
  • Declaration about Commencement Certificatedecl about commencement certificate.pdf · uploaded 23 Apr 2024Source
  • Commencement Certificates / NA Order for plotted developmentCC verification email.pdf · uploaded 27 Apr 2024Source
  • Commencement Certificates / NA Order for plotted developmentCC verification.pdf · uploaded 17 May 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form no 1.pdf · uploaded 17 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1Architect (1).pdf · uploaded 17 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Eng certificate.pdf · uploaded 17 Jul 2024View
  • Disclosure of sold/ booked inventoryinformation of sold booked inventory.pdf · uploaded 17 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer' certificate.pdf · uploaded 24 Oct 2024View
  • Disclosure of sold/ booked inventoryinformation of sold,booked inventory.pdf · uploaded 24 Oct 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormt A nov 2024.pdf · uploaded 8 Nov 2024View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B.pdf · uploaded 8 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form1.pdf · uploaded 5 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 6 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 Feb 2025View
  • Disclosure of sold/ booked inventorySold booked inventory.pdf · uploaded 6 Feb 2025View
  • Other – LegalLegal encumbrance declaration.pdf · uploaded 21 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 2 May 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 2 May 2025View
  • Disclosure of sold/ booked inventoryBook sold inventory April 2025.pdf · uploaded 2 May 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)MOHPI form 5.pdf · uploaded 6 May 2025View
  • Form 1Form 1.pdf · uploaded 20 Jul 2025View
  • Form 2Form 2 .pdf · uploaded 20 Jul 2025View
  • Disclosure of Sold and Booked InventoryDeclaration June 25.pdf · uploaded 20 Jul 2025View
  • Form 1Form-1Architect (1).pdf · uploaded 1 Oct 2025View
  • Form 2Form 2 Eng certificate.pdf · uploaded 1 Oct 2025View
  • Disclosure of Sold and Booked Inventoryinformation of sold booked inventory.pdf · uploaded 1 Oct 2025View
  • Form 1Form 1.pdf · uploaded 1 Oct 2025View
  • Form 2Engineer' certificate.pdf · uploaded 1 Oct 2025View
  • Disclosure of Sold and Booked Inventoryinformation of sold,booked inventory.pdf · uploaded 1 Oct 2025View
  • Form 1Form 1.pdf · uploaded 1 Oct 2025View
  • Form 2Form 2.pdf · uploaded 1 Oct 2025View
  • Disclosure of Sold and Booked InventorySold booked inventory.pdf · uploaded 1 Oct 2025View
  • Form 1form 1.pdf · uploaded 1 Oct 2025View
  • Form 2form 2.pdf · uploaded 1 Oct 2025View
  • Disclosure of Sold and Booked InventoryBook sold inventory April 2025.pdf · uploaded 1 Oct 2025View
  • Form 5 (FY 2024-2025)Form 5 24_25.pdf · uploaded 7 Oct 2025Source
  • Withdrawal Update Form 1MOH PI Architects certificate DEC 2025.pdf · uploaded 9 Feb 2026Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 9 Feb 2026View
  • Withdrawal Update Form 1MOH PI Architects certificate DEC 2025.pdf · uploaded 9 Feb 2026Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 9 Feb 2026View
  • Withdrawal Update Form 1MOH PI Architect certificate 31march 2026.pdf · uploaded 6 Jun 2026Source
  • Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 6 Jun 2026Source
  • Withdrawal Update Form 1Architects certificate june 2026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 20 Jul 2026View

Promoter documents

  • Legal Title reportLegale Title Report My Orchid Heights_compressed.pdf · uploaded 10 Apr 2024Source
  • Declaration Form BMy Orchid Heights Form B Nitin.pdf · uploaded 17 Apr 2024View

Technical documents

  • Layout Approvalmap 2 for RERA_compressed.pdfSource
  • Building Plan Approvalmap 2 for RERA_compressed.pdfSource
  • Building Plan Approvalmap 1_compressed.pdfSource

Other legal documents

  • Other – Legalannexure A final.pdfView
  • Other – LegalLegal encumbrance declaration.pdfView

Proforma allotment letter

  • Proforma allotment letterBhatkar allotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

01PLOT NO. 01 S.NO. 215/1-B

As published on MahaRERA's project page

PLOT NO. 01 S.NO. 215/1-B

Boundaries

North
Survey No 215 Part
South
Survey No 194
East
18 Mt Wide Road
West
Survey No 215 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr.Rahul Farkade—
Chartered accountantGoyal Parul and Co—
Chartered accountantShyam Zanvar and co.—
EngineerDr. Milind V.Mohod—

Source: MahaRERA project page. Contact details are not shown.