Shrihari Residency

Completed

Wani (M Cl), Yavatmal 445304 |Promoter: Vijaya Infraventures

Residential / Group HousingRERAP51000014550
12 Dec 2017Registered with MahaRERA
31 Dec 2018Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential12 units in all
Land area for this project
598 sq m (6,434 sq ft)
Permissible built-up area
716 sq m (7,708 sq ft)
Sanctioned built-up area
716 sq m (7,708 sq ft)
Address
15/54-56, Deshmukh Wadi, Near Lions ConventPIN 445304
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.87879, 75.36513
Shrihari Residency is at latitude 19.87879, longitude 75.36513.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
12 Dec 2017
Promised
31 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5100001455012 Dec 201731 Dec 2018—Vijaya InfraventuresProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shrihari Residency412

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

Residential · 12 units
TypeCarpet areaUnits
Residential54.59 sq m · 588 sq ft12

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shrihari Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure4%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

29 documents held by Deedo, 37 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrancesNo encumbrance.pdf · uploaded 30 Nov 2017View
  • Commencement Certificates / NA Order for plotted developmentCommenment Cer.pdf · uploaded 30 Nov 2017View
  • Declaration in FORM BSTAM FRONT.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 30 Nov 2017View
  • Declaration in FORM BSTAM BACK SIDE.pdf · uploaded 30 Nov 2017View
  • Commencement Certificates / NA Order for plotted development1.pdf · uploaded 30 Nov 2017View
  • Commencement Certificates / NA Order for plotted developmentNAGAR PARISHAD.pdf · uploaded 30 Nov 2017View
  • Copy of the legal title report10.pdf · uploaded 30 Nov 2017View
  • Copy of the legal title report20.pdf · uploaded 30 Nov 2017View
  • Copy of the legal title report30.pdf · uploaded 30 Nov 2017View
  • Copy of the legal title report40.pdf · uploaded 30 Nov 2017View
  • Copy of the legal title report50.pdf · uploaded 30 Nov 2017View
  • Copy of Layout Approval (in case of layout)1111.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter101.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter102.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter103.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter104.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter105.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter106.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter107.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter108.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter109.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter110.pdf · uploaded 30 Nov 2017View
  • Proforma of Allotment letter111.pdf · uploaded 30 Nov 2017View
  • Building Plan Approval (IOD)1109.pdf · uploaded 30 Nov 2017View
  • Certificates of Architect (Form 4)FORM 4.pdf · uploaded 11 Dec 2018View
  • Certificates of CA (Form 5)FORM 5.pdf · uploaded 11 Dec 2018View

Promoter documents

  • Declaration Form BSTAM FRONT.pdf · uploaded 30 Nov 2017View
  • Declaration Form BSTAM BACK SIDE.pdf · uploaded 30 Nov 2017View
  • Legal Title report10.pdf · uploaded 30 Nov 2017View
  • Legal Title report20.pdf · uploaded 30 Nov 2017View
  • Legal Title report30.pdf · uploaded 30 Nov 2017View
  • Legal Title report40.pdf · uploaded 30 Nov 2017View
  • Legal Title report50.pdf · uploaded 30 Nov 2017View

Technical documents

  • Layout Approval1111.pdfView
  • Building Plan Approval1109.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

Survey, CTS, gat or plot numbers

15/54-5615/5456 at Wani

As published on MahaRERA's project page

15/54-56

Boundaries

North
House Of Borde
South
Road
East
House Of Shri Vijanand Shripatwar
West
House Of Sunita Thakurwar

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKiran Dikundwar—
EngineerDilipkumar Agrawal—
OtherVinendra Gharde—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology