White House
Its promised completion date, Dec 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 33% of its units are booked.
Thane (M Corp.), Thane 400615 · Promoter: Laabh Samruddhi Enterprises
Its promised completion date, Dec 2025, has passed and MahaRERA does not show it completed
- This projectRegistered 9 Aug 2017, completion promised 30 Dec 2025, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700004612
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700004612 | 9 Aug 2017 | 30 Dec 2025 | 30 Dec 2025 | Laabh Samruddhi Enterprises | Project page |
Documents130
1 document held by Deedo, 129 filings listed on MahaRERA's project page
Finance
- PAN CardEPSON006.pdf · uploaded 12 Jun 2019Source
Legal
- Legal Title reportLEGAL TITAL REPORT.pdf · uploaded 25 Jul 2017Source
- Declaration Form BLAABH SAMRUDDHI ENTERPRISES - FORM B.pdf · uploaded 26 Jul 2017Source
- OtherWH letter with proposed plan - 2.pdf · uploaded 31 Jul 2017Source
- OtherRecd from SPC - Letter of Proposed Plan Change_with Plans - 31072017.pdf · uploaded 31 Jul 2017Source
- OtherLSE.pdf · uploaded 21 Feb 2018Source
- OtherFIRE NOC_compressed.pdf · uploaded 17 Oct 2020Source
Show all 130 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportLEGAL TITAL REPORT.pdf · uploaded 25 Jul 2017Source
- 1 Details of encumbrancesEncumbrances_WhiteHouse.pdf · uploaded 25 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)MYSCAN_20170719_0008- WHITE HOUSE-ilovepdf-compressed.pdf · uploaded 25 Jul 2017Source
- 1 Building Plan Approval (IOD)C C.pdf · uploaded 25 Jul 2017Source
- 1 Declaration in FORM BLAABH SAMRUDDHI ENTERPRISES - FORM B.pdf · uploaded 26 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Letter L Samruddhi.pdf · uploaded 28 Jul 2017Source
- 1 Proforma of Allotment letterL Samruddhi.pdf · uploaded 28 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER_CERTIFICATE_-_WHITE_HOUSE.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of CA (Form 3)CA CERTIFICATE - Whitehouse.pdf · uploaded 31 Jul 2017Source
- 1 OtherRecd from SPC - Letter of Proposed Plan Change_with Plans - 31072017.pdf · uploaded 31 Jul 2017Source
- 2 OtherWH letter with proposed plan - 2.pdf · uploaded 31 Jul 2017Source
- 2 Proforma of Allotment letterUploaded on RERA - Whitehouse - RERA AFS - 01112017.pdf · uploaded 1 Nov 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentWhite House01.pdf · uploaded 21 Feb 2018Source
- 3 OtherLSE.pdf · uploaded 21 Feb 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentWHITE HOUSE.pdf · uploaded 13 Mar 2018Source
- 1 Certificates of CA (Form 5)white hse form 5.pdf · uploaded 14 Oct 2018Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS CERTIFICATE LAABH SAMRUDHI ENT.pdf · uploaded 2 Mar 2019Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE LAABH SAMRUDHI ENT.pdf · uploaded 2 Mar 2019Source
- 2 Certificates of CA (Form 3)RERA LAABH SAMRUDHI ENT.pdf · uploaded 2 Mar 2019Source
- 1 PAN CardEPSON006.pdf · uploaded 12 Jun 2019Source
- 3 Commencement Certificates / NA Order for plotted developmentCC-White House dt 6-7-19.pdf · uploaded 10 Jul 2019Source
- 3 Proforma of Allotment letterWH_AFS_Draft_22072019.pdf · uploaded 12 Aug 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form-5.pdf · uploaded 23 Dec 2019Source
- 2 Building Plan Approval (IOD)WH_PlinthCC_5725.pdf · uploaded 28 Jul 2020Source
- 4 OtherFIRE NOC_compressed.pdf · uploaded 17 Oct 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)ANNUAL REPORT 2019-20.pdf · uploaded 12 Jan 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)LSE From 5 March 2021.pdf · uploaded 27 Jan 2022Source
- 1 Disclosure of sold/ booked inventoryDec -2021 Sold and Unsold.pdf · uploaded 1 Apr 2022Source
- 2 Disclosure of sold/ booked inventorySold- Unsold- White House- March 22.pdf · uploaded 14 Jun 2022Source
- 1 Proforma of Agreement for saleWH_AFS_Uploaded on RERA_01_22112022.pdf · uploaded 9 Dec 2022Source
- 3 Disclosure of sold/ booked inventory2023 01 04 - Sold-Unsold-Whitehouse.pdf · uploaded 13 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Laabh Samruddhi Enterprises.pdf · uploaded 2 Feb 2023Source
- 4 Disclosure of sold/ booked inventory2023 04 10 - Sold Unsold White House.pdf · uploaded 19 Apr 2023Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate June 2022.pdf · uploaded 4 Jan 2024Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Sept 2022.pdf · uploaded 4 Jan 2024Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Dec 2022.pdf · uploaded 4 Jan 2024Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate March 2023.pdf · uploaded 4 Jan 2024Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate June 2023.pdf · uploaded 4 Jan 2024Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Sept 2023.pdf · uploaded 4 Jan 2024Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate Dec 2023.pdf · uploaded 15 Jan 2024Source
- 5 Disclosure of sold/ booked inventoryWH SOLD and UNSOLD June 2022.pdf · uploaded 19 Jan 2024Source
- 6 Disclosure of sold/ booked inventoryWH SOLD and UNSOLD Sept 2022.pdf · uploaded 19 Jan 2024Source
- 7 Disclosure of sold/ booked inventoryWH SOLD and UNSOLD Dec 2022.pdf · uploaded 19 Jan 2024Source
- 8 Disclosure of sold/ booked inventoryWH SOLD and UNSOLD march 2023.pdf · uploaded 19 Jan 2024Source
- 9 Disclosure of sold/ booked inventoryWH SOLD and UNSOID June 2023.pdf · uploaded 19 Jan 2024Source
- 10 Disclosure of sold/ booked inventoryWH SOLD and UNSOLD Sept 2023.pdf · uploaded 19 Jan 2024Source
- 11 Disclosure of sold/ booked inventorySOLD and UNSOLD Dec 2023.pdf · uploaded 19 Jan 2024Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate June 2022.pdf · uploaded 20 Jan 2024Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Sept 2022.pdf · uploaded 20 Jan 2024Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate Dec 2022.pdf · uploaded 20 Jan 2024Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate March 2023.pdf · uploaded 20 Jan 2024Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate June 2023.pdf · uploaded 20 Jan 2024Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Sept 2023.pdf · uploaded 20 Jan 2024Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Dec 2023.pdf · uploaded 20 Jan 2024Source
- 3 Certificates of CA (Form 3)Form 3 June 2022.pdf · uploaded 20 Jan 2024Source
- 4 Certificates of CA (Form 3)Form 3 Sept 2022.pdf · uploaded 20 Jan 2024Source
- 5 Certificates of CA (Form 3)Form 3 Dec 2022.pdf · uploaded 20 Jan 2024Source
- 6 Certificates of CA (Form 3)Form 3 March 2023.pdf · uploaded 20 Jan 2024Source
- 7 Certificates of CA (Form 3)Form 3 June 2023.pdf · uploaded 20 Jan 2024Source
- 8 Certificates of CA (Form 3)Form 3 Sept 2023.pdf · uploaded 20 Jan 2024Source
- 9 Certificates of CA (Form 3)Form 3 Dec 2023.pdf · uploaded 20 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM2A LSE 22-23.pdf · uploaded 6 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 March 2023.pdf · uploaded 6 Mar 2024Source
- 1 Home Buyer /Allottee Grievance Redressal CellInvestor Grievance Cell.pdf · uploaded 25 Jun 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS -LSE-31-03-2024.pdf · uploaded 25 Mar 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)LSE Architects June 2024.pdf · uploaded 25 Mar 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)LSE Architects Sept 2024.pdf · uploaded 25 Mar 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)LSE Architects Dec 2024.pdf · uploaded 25 Mar 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC_LSE_March 24.pdf · uploaded 25 Mar 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate June 2024.pdf · uploaded 25 Mar 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Sept 2024.pdf · uploaded 25 Mar 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC_LSE_DEC_24.pdf · uploaded 25 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QAC_LSE_23-24 - sing.pdf · uploaded 29 Apr 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)AC_LSE_March 2025 - sing.pdf · uploaded 6 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC_LSE_March_25.pdf · uploaded 6 May 2025Source
- 1 Disclosure of sold/ booked inventoryWH- SOLD and UNSOLD March 2024.pdf · uploaded 6 May 2025Source
- 2 Disclosure of sold/ booked inventoryWH-SOLD and UNSOLD June 2024.pdf · uploaded 6 May 2025Source
- 3 Disclosure of sold/ booked inventoryWH SOLD and UNSOLD Sept 2024.pdf · uploaded 6 May 2025Source
- 4 Disclosure of sold/ booked inventoryWH SOLD and UNSOLD Dec 2024.pdf · uploaded 6 May 2025Source
- 5 Disclosure of sold/ booked inventoryWH SOLD and UNSOLD March 2025.pdf · uploaded 6 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)LSE -FORM -5 DT-31-03-24 (1).pdf · uploaded 6 May 2025Source
- 1 Certificates of CA (Form 3)LSE Form 3 March 2024.pdf · uploaded 13 May 2025Source
- 2 Certificates of CA (Form 3)LSE Form 3 June - 2024.pdf · uploaded 13 May 2025Source
- 3 Certificates of CA (Form 3)LSE Form 3 Sept -2024.pdf · uploaded 13 May 2025Source
- 4 Certificates of CA (Form 3)LSE Form 3 Dec 2024.pdf · uploaded 13 May 2025Source
- 5 Certificates of CA (Form 3)LSE Form-3 Final March 2025_compressed.pdf · uploaded 13 May 2025Source
- Form 1AC_LSE_March 2025 - sing.pdf · uploaded 23 May 2025Source
- Form 2LSE_Form2_March 2025.pdf · uploaded 23 May 2025Source
- Form 3LSE_Form3_March 2025_compressed.pdf · uploaded 23 May 2025Source
- Disclosure of Sold and Booked InventoryWH SOLD and UNSOLD March 2025.pdf · uploaded 23 May 2025Source
- 1 Certificates of CA (Form 3)LSE_Form3_March 2025_compressed.pdf · uploaded 28 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)LSE_Form2_March 2025.pdf · uploaded 28 May 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)LSE - form2 march 2025.pdf · uploaded 28 May 2025Source
- Form 1LSE Architects June 2025.pdf · uploaded 19 Jan 2026Source
- Form 2EC_LSE_JUNE_25.pdf · uploaded 19 Jan 2026Source
- Form 3LSE Form 3 June 2025.pdf · uploaded 19 Jan 2026Source
- Disclosure of Sold and Booked InventoryLH Sold and unsold June 2025.pdf · uploaded 19 Jan 2026Source
- Form 1WH-RERA-ARCHITECTS-DT-30-09-2025.pdf · uploaded 19 Jan 2026Source
- Form 2EC _LSE-FORM-2 DT-30-09-2025.pdf · uploaded 19 Jan 2026Source
- Form 3LSE Form 3 Sept 2025.pdf · uploaded 19 Jan 2026Source
- Disclosure of Sold and Booked InventoryLH Sold and unsold Sept 2025.pdf · uploaded 19 Jan 2026Source
- Form 1LSE-ARCHITECT LETTAR DT-31-12-2025.pdf · uploaded 19 Jan 2026Source
- Form 2EC_LSE_DEC_25.pdf · uploaded 19 Jan 2026Source
- Form 3LSE-ARCHITECT LETTAR DT-31-12-2025.pdf · uploaded 19 Jan 2026Source
- Disclosure of Sold and Booked InventoryLH Sold and unsold Dec 2025.pdf · uploaded 19 Jan 2026Source
Technical
Technical (Architect)
- DocumentArchitects Certificate Dec 2023.pdf · uploaded 15 Jan 2024Source
- DocumentARCHITECTS -LSE-31-03-2024.pdf · uploaded 25 Mar 2025Source
- DocumentLSE Architects June 2024.pdf · uploaded 25 Mar 2025Source
- DocumentLSE Architects Sept 2024.pdf · uploaded 25 Mar 2025Source
- DocumentLSE Architects Dec 2024.pdf · uploaded 25 Mar 2025Source
- DocumentAC_LSE_March 2025 - sing.pdf · uploaded 6 May 2025Source
Technical (Engineer)
- DocumentEngineer Certificate Dec 2023.pdf · uploaded 20 Jan 2024Source
- DocumentEC_LSE_March 24.pdf · uploaded 25 Mar 2025Source
- DocumentEngineer Certificate June 2024.pdf · uploaded 25 Mar 2025Source
- DocumentEngineer Certificate Sept 2024.pdf · uploaded 25 Mar 2025Source
- DocumentEC_LSE_DEC_24.pdf · uploaded 25 Mar 2025Source
- DocumentEC_LSE_March_25.pdf · uploaded 6 May 2025Source
- DocumentLSE_Form2_March 2025.pdf · uploaded 28 May 2025Source
- DocumentLSE - form2 march 2025.pdf · uploaded 28 May 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals9/1, 9/4
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1 BHK, 2BHK, 2BHK TYPE1, 2BHK TYPE 2, Office 101, Office 102, Office 103, Office 104, Office 105, Office 106, Office 107, Office 108, Office 109, Office 110, Office 112, Office 113, Office 114, Office 115, Office 116, Office 117, Shop 01, Shop 02, Shop 03, Shop 04, Shop 05, Shop 06, Shop 07, Shop 08, Shop 09, Shop 10, Shop 11, Shop 12, Shop 13, Shop 14, Shop15, Shop16, Shop 17, Shop 18, Type 1, Type 2135 units in all
- Address
- 9/1 And 9/4, Ghodbunder Road, KasarvadavliPIN 400615
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.27039, 72.96954
- Designated bank account
- 200
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- 40 M Wide Dp Road
- South
- 12 M Wide Road
- East
- Sn 9 Hs 2
- West
- Sn 10 Hs 1
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking135 units
45 of 135 units booked (33%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A and A1 | 1 BHK | 36.5 sq m · 393 sq ft | 43 | 10 |
| A and A1 | 2BHK | 48.18 sq m · 519 sq ft | 2 | 0 |
| A and A1 | 2BHK | 48.42 sq m · 521 sq ft | 24 | 10 |
| A and A1 | 2BHK | 48.83 sq m · 526 sq ft | 22 | 6 |
| A and A1 | 2BHK TYPE1 | 47.66 sq m · 513 sq ft | 1 | 0 |
| A and A1 | 2BHK TYPE 2 | 46.31 sq m · 498 sq ft | 1 | 0 |
| A and A1 | Office 101 | 30.74 sq m · 331 sq ft | 1 | 0 |
| A and A1 | Office 102 | 25.25 sq m · 272 sq ft | 1 | 0 |
Show all 42 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A and A1 | Office 103 | 27.55 sq m · 297 sq ft | 1 | 0 |
| A and A1 | Office 104 | 27.55 sq m · 297 sq ft | 1 | 0 |
| A and A1 | Office 105 | 25.25 sq m · 272 sq ft | 1 | 0 |
| A and A1 | Office 106 | 30.74 sq m · 331 sq ft | 1 | 0 |
| A and A1 | Office 107 | 20.4 sq m · 220 sq ft | 1 | 0 |
| A and A1 | Office 108 | 13.13 sq m · 141 sq ft | 1 | 0 |
| A and A1 | Office 109 | 14.21 sq m · 153 sq ft | 1 | 1 |
| A and A1 | Office 110 | 12.92 sq m · 139 sq ft | 1 | 1 |
| A and A1 | Office 112 | 17.13 sq m · 184 sq ft | 1 | 1 |
| A and A1 | Office 113 | 27.05 sq m · 291 sq ft | 1 | 0 |
| A and A1 | Office 114 | 33.72 sq m · 363 sq ft | 1 | 0 |
| A and A1 | Office 115 | 22.63 sq m · 244 sq ft | 1 | 1 |
| A and A1 | Office 116 | 22.63 sq m · 244 sq ft | 1 | 0 |
| A and A1 | Office 117 | 21.2 sq m · 228 sq ft | 1 | 0 |
| A and A1 | Shop 01 | 15.91 sq m · 171 sq ft | 1 | 1 |
| A and A1 | Shop 02 | 29.82 sq m · 321 sq ft | 1 | 1 |
| A and A1 | Shop 03 | 25.25 sq m · 272 sq ft | 1 | 1 |
| A and A1 | Shop 04 | 27.55 sq m · 297 sq ft | 1 | 1 |
| A and A1 | Shop 05 | 27.55 sq m · 297 sq ft | 1 | 1 |
| A and A1 | Shop 06 | 25.25 sq m · 272 sq ft | 1 | 1 |
| A and A1 | Shop 07 | 30.74 sq m · 331 sq ft | 1 | 0 |
| A and A1 | Shop 08 | 20.4 sq m · 220 sq ft | 1 | 1 |
| A and A1 | Shop 09 | 13.13 sq m · 141 sq ft | 1 | 1 |
| A and A1 | Shop 10 | 14.21 sq m · 153 sq ft | 1 | 0 |
| A and A1 | Shop 11 | 12.92 sq m · 139 sq ft | 1 | 1 |
| A and A1 | Shop 12 | 15.82 sq m · 170 sq ft | 1 | 1 |
| A and A1 | Shop 13 | 17.13 sq m · 184 sq ft | 1 | 0 |
| A and A1 | Shop 14 | 27.05 sq m · 291 sq ft | 1 | 1 |
| A and A1 | Shop15 | 33.72 sq m · 363 sq ft | 1 | 1 |
| A and A1 | Shop16 | 18.99 sq m · 204 sq ft | 1 | 1 |
| A and A1 | Shop 17 | 18.99 sq m · 204 sq ft | 1 | 1 |
| A and A1 | Shop 18 | 17.78 sq m · 191 sq ft | 1 | 1 |
| Building B | Type 1 | 34.71 sq m · 374 sq ft | 4 | 0 |
| Building B | Type 2 | 42.9 sq m · 462 sq ft | 4 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals1
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Akruti Consultants | — |
Source: MahaRERA project page. Contact details are not shown.