Skip to content
Residential / Group Housing · 2 buildings · 468 unitsRERA P51700001555

The Helios

Deedo IDDP-THN-KXNM

It is due for completion in Dec 2031, with no extension on record; no MahaRERA orders on record; 0% of its units are booked.

Thane (M Corp.), Thane 400607 · Promoter: Raj Laxmi Developers

DeliveryDue Dec 2031No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 468 units · as the promoter reported to MahaRERA
The Helios project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

It is due for completion in Dec 2031, with no extension on record

  • This projectRegistered 28 Jul 2017, completion promised 31 Dec 2031.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700001555
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170000155528 Jul 201731 Dec 203131 Dec 2031Raj Laxmi DevelopersProject page
Documents274

2 documents held by Deedo, 272 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardRLD pan card.pdf · uploaded 21 Jul 2017Source
  • PAN CardPAN CARD.pdf · uploaded 29 May 2024Source

Legal

  • Legal Title reportTitle Certificate dt 200717 by Adv CM Vithlani Rajlaxmi Dev.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BB form - Declaration - Copy.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BPartnership Deed dt 01072013 Supplementary.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BExtract of Rajlaxmi Developers firm.pdf · uploaded 21 Jul 2017Source
Show all 274 documentsShow fewer documents

Legal

  • Declaration Form B7 12 extract.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BIndex II Deed of Conveyance dt 09092008 Pankaj Rajlaxmi.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BDeed of Conveyance dt 09092008 Pankaj Rajlaxmi 1.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BDeed of Conveyance dt 09092008 Pankaj Rajlaxmi 2.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BPOA dt 21102013 by Rajlaxmi to NAS Mehul Vasavada 1.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BPOA dt 21102013 by Rajlaxmi to NAS Mehul Vasavada 2.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BOrder of Collector 05122012.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BSale Deed dt 03071961.pdf · uploaded 21 Jul 2017Source
  • Declaration Form BCorrect Form B.pdf · uploaded 18 Jun 2024Source
  • Declaration Form BForm B.pdf · uploaded 25 Jul 2024Source
  • Declaration Form BForm B.pdf · uploaded 26 Jul 2024Source
  • Declaration Form BFORM B ON 500 STAMP PAPER.pdf · uploaded 10 Oct 2025Source

Migrated

  • 1 PAN CardRLD pan card.pdf · uploaded 21 Jul 2017Source
  • 1 Copy of the legal title reportTitle Certificate dt 200717 by Adv CM Vithlani Rajlaxmi Dev.pdf · uploaded 21 Jul 2017Source
  • 1 Details of encumbrancesINDEX 2 MORTGAGE1.pdf · uploaded 21 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)CC with amended plan 050517 part a.pdf · uploaded 21 Jul 2017Source
  • 2 Copy of Layout Approval (in case of layout)CC with amended plan 050517 part b.pdf · uploaded 21 Jul 2017Source
  • 1 Building Plan Approval (IOD)CC with amended plan 050517 part a.pdf · uploaded 21 Jul 2017Source
  • 2 Building Plan Approval (IOD)CC with amended plan 050517 part b.pdf · uploaded 21 Jul 2017Source
  • 3 Building Plan Approval (IOD)CC with amended plan 050517 part b.pdf · uploaded 21 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC with amended plan 050517 part a.pdf · uploaded 21 Jul 2017Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC with amended plan 050517 part b.pdf · uploaded 21 Jul 2017Source
  • 1 Declaration in FORM BB form - Declaration - Copy.pdf · uploaded 21 Jul 2017Source
  • 2 Declaration in FORM BPartnership Deed dt 01072013 Supplementary.pdf · uploaded 21 Jul 2017Source
  • 3 Declaration in FORM BExtract of Rajlaxmi Developers firm.pdf · uploaded 21 Jul 2017Source
  • 4 Declaration in FORM B7 12 extract.pdf · uploaded 21 Jul 2017Source
  • 5 Declaration in FORM BIndex II Deed of Conveyance dt 09092008 Pankaj Rajlaxmi.pdf · uploaded 21 Jul 2017Source
  • 6 Declaration in FORM BDeed of Conveyance dt 09092008 Pankaj Rajlaxmi 1.pdf · uploaded 21 Jul 2017Source
  • 7 Declaration in FORM BDeed of Conveyance dt 09092008 Pankaj Rajlaxmi 2.pdf · uploaded 21 Jul 2017Source
  • 8 Declaration in FORM BPOA dt 21102013 by Rajlaxmi to NAS Mehul Vasavada 1.pdf · uploaded 21 Jul 2017Source
  • 9 Declaration in FORM BPOA dt 21102013 by Rajlaxmi to NAS Mehul Vasavada 2.pdf · uploaded 21 Jul 2017Source
  • 10 Declaration in FORM BOrder of Collector 05122012.pdf · uploaded 21 Jul 2017Source
  • 11 Declaration in FORM BSale Deed dt 03071961.pdf · uploaded 21 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT'S CERTIFICATE.pdf · uploaded 21 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER'S CERTIFICATE.pdf · uploaded 21 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA certificate by M D Dumasia Co.pdf · uploaded 21 Jul 2017Source
  • 1 Proforma of Allotment letterAGREEMENT FOR SALE.pdf · uploaded 21 Jul 2017Source
  • 2 Proforma of Allotment letterdraft provisional allotment Letter.pdf · uploaded 21 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate RLD.pdf · uploaded 31 Mar 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate RLD.pdf · uploaded 31 Mar 2018Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate RLD.pdf · uploaded 31 Mar 2018Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate RLD.pdf · uploaded 31 Mar 2018Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate RLD.pdf · uploaded 31 Mar 2018Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate RLD.pdf · uploaded 31 Mar 2018Source
  • 2 Certificates of CA (Form 3)CA Certificate RLD.pdf · uploaded 31 Mar 2018Source
  • 3 Certificates of CA (Form 3)CA Certificate_RLD.pdf · uploaded 31 Mar 2018Source
  • 4 Certificates of CA (Form 3)CA Certificate_RLD.pdf · uploaded 31 Mar 2018Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLDArchitectCertificate31032018.pdf · uploaded 30 May 2018Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLDEngineeringCertificate31032018.pdf · uploaded 30 May 2018Source
  • 5 Certificates of CA (Form 3)RLDCACertificate31032018.pdf · uploaded 30 May 2018Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Work Completion Certificate 31 05 2018.pdf · uploaded 8 Sep 2018Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate 31052018.pdf · uploaded 8 Sep 2018Source
  • 6 Certificates of CA (Form 3)RLD CA Certificate 31052018.pdf · uploaded 8 Sep 2018Source
  • 1 Certificates of CA (Form 5)RLD form No 5.pdf · uploaded 29 Sep 2018Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 31july18.pdf · uploaded 13 Oct 2018Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate RLD 31JULY18.pdf · uploaded 13 Oct 2018Source
  • 7 Certificates of CA (Form 3)RLD CA Certificate 31july18.pdf · uploaded 13 Oct 2018Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate RLD 31102018.pdf · uploaded 20 Dec 2018Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate RLD 31102018.pdf · uploaded 20 Dec 2018Source
  • 8 Certificates of CA (Form 3)CA Certificate RLD 31102018.pdf · uploaded 20 Dec 2018Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate 31Dec2018.pdf · uploaded 30 Mar 2019Source
  • 9 Certificates of CA (Form 3)CA Certificate 31Dec2018.pdf · uploaded 30 Mar 2019Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 15 Apr 2019Source
  • 2 Certificates of CA (Form 5)RLD RERA Audit Report March 2019.pdf · uploaded 24 Apr 2019Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate RLD 31March19.pdf · uploaded 6 May 2019Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate RLD 31March19.pdf · uploaded 6 May 2019Source
  • 10 Certificates of CA (Form 3)CACertificateRLD31032019.pdf · uploaded 6 May 2019Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate.pdf · uploaded 14 Aug 2019Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate.pdf · uploaded 14 Aug 2019Source
  • 11 Certificates of CA (Form 3)RLD CA Certificate.pdf · uploaded 14 Aug 2019Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 30 Sept 19.pdf · uploaded 5 Nov 2019Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate 30 Sept 19.pdf · uploaded 5 Nov 2019Source
  • 12 Certificates of CA (Form 3)RLD CA Certificate 30 Sept 19.pdf · uploaded 5 Nov 2019Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 31 Dec 19.pdf · uploaded 19 Feb 2020Source
  • 13 Certificates of CA (Form 3)RLD CA Certificate 31 Dec 19.pdf · uploaded 22 Feb 2020Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate 31 Dec 2019.pdf · uploaded 27 Feb 2020Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Mira Pride Architect Certificate 31 march 2020.pdf · uploaded 31 Aug 2020Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Helios Architect Certificate 31 March 2020.pdf · uploaded 31 Aug 2020Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Helios Engineer Certificate 31 March 2020.pdf · uploaded 31 Aug 2020Source
  • 14 Certificates of CA (Form 3)Helios CA Certificate 31 march 2020.pdf · uploaded 31 Aug 2020Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Helios Architect Certificate 30June2020.pdf · uploaded 18 Nov 2020Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Helios Engineer Certificate 30June2020.pdf · uploaded 18 Nov 2020Source
  • 15 Certificates of CA (Form 3)Helios CA Certificate 30June2020.pdf · uploaded 18 Nov 2020Source
  • 3 Certificates of CA (Form 5)Helios CA Certificate 30June2020.pdf · uploaded 18 Nov 2020Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 30Sept2020.pdf · uploaded 29 Dec 2020Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineers Certificate 30Sept2020.pdf · uploaded 29 Dec 2020Source
  • 16 Certificates of CA (Form 3)RLD CA Certificate 30Sept2020.pdf · uploaded 29 Dec 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)RLD RERA Audit Report 31March2020.pdf · uploaded 29 Dec 2020Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Helios Architect Certificate 31Dec2020.pdf · uploaded 10 Mar 2021Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Helios Engineer Certificate 31Dec2020.pdf · uploaded 10 Mar 2021Source
  • 17 Certificates of CA (Form 3)Helios CA Certificate 31Dec2020.pdf · uploaded 10 Mar 2021Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 31March2021.pdf · uploaded 3 Sep 2021Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineers Certificate 31March2021.pdf · uploaded 3 Sep 2021Source
  • 18 Certificates of CA (Form 3)RLD CA Certificate 31March2021.pdf · uploaded 3 Sep 2021Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 30June2021.pdf · uploaded 15 Dec 2021Source
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 30Sept2021.pdf · uploaded 15 Dec 2021Source
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate 30June2021.pdf · uploaded 15 Dec 2021Source
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate 30Sept2021.pdf · uploaded 15 Dec 2021Source
  • 1 Disclosure of sold/ booked inventoryRLD Disclosure of Sold Inventory 30June2021.pdf · uploaded 15 Dec 2021Source
  • 19 Certificates of CA (Form 3)RLD CA Certificate 30June2021.pdf · uploaded 15 Dec 2021Source
  • 20 Certificates of CA (Form 3)RLD CA Certificate 30Sept2021.pdf · uploaded 15 Dec 2021Source
  • 21 Certificates of CA (Form 3)RLD Disclosure of Sold Inventory 30Sept2021.pdf · uploaded 15 Dec 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)RLD RERA Audit Report 31March2021.pdf · uploaded 23 Dec 2021Source
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate MMD 31Dec2021.pdf · uploaded 16 Feb 2022Source
  • 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate RLD 31Dec2021.pdf · uploaded 16 Feb 2022Source
  • 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate RLD 31Dec2021.pdf · uploaded 16 Feb 2022Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Inventory RLD 31Dec2021.pdf · uploaded 16 Feb 2022Source
  • 22 Certificates of CA (Form 3)CA Certificate RLD 31Dec2021.pdf · uploaded 16 Feb 2022Source
  • 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)23 Architect Certificate_RLD_31032022.pdf · uploaded 16 Jun 2022Source
  • 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)21Engineer Certificate_RLD_31032022.pdf · uploaded 16 Jun 2022Source
  • 3 Disclosure of sold/ booked inventory05 Helios_Disclosure of Sold Inventory_31032022.pdf · uploaded 16 Jun 2022Source
  • 23 Certificates of CA (Form 3)21 CA Certificate_RLD_31032022.pdf · uploaded 16 Jun 2022Source
  • 4 Certificates of CA (Form 5)15 RLD RERA Audit Report 31st March 2022 md nas.pdf · uploaded 5 Jul 2022Source
  • 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Mayfair Helios as on 30062022.pdf · uploaded 15 Jul 2022Source
  • 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 30June2022.pdf · uploaded 1 Sep 2022Source
  • 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate 30June2022.pdf · uploaded 1 Sep 2022Source
  • 4 Disclosure of sold/ booked inventoryRLD Disclosure of Inventory 30June2022.pdf · uploaded 1 Sep 2022Source
  • 24 Certificates of CA (Form 3)RLD CA Certificate 30June2022.pdf · uploaded 1 Sep 2022Source
  • 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Mayfair Helios 30092022.pdf · uploaded 5 Dec 2022Source
  • 25 Certificates of CA (Form 3)CA Certificate Helios 30Sep2022.pdf · uploaded 5 Dec 2022Source
  • 5 Disclosure of sold/ booked inventoryRLD Disclosure of Inventory 30Sep2022.pdf · uploaded 6 Dec 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RLD RERA Audit Report 31st March 2022.pdf · uploaded 23 Jan 2023Source
  • 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 31Dec2022.pdf · uploaded 25 Jan 2023Source
  • 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate 31Dec2022.pdf · uploaded 25 Jan 2023Source
  • 6 Disclosure of sold/ booked inventoryRLD Disclosure of Sold Inventory 31Dec2022.pdf · uploaded 25 Jan 2023Source
  • 26 Certificates of CA (Form 3)RLD CA Certificate 31Dec2022.pdf · uploaded 25 Jan 2023Source
  • 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate RLD 30Sep2022.pdf · uploaded 25 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)RLD RERA Audit Report Form 5.pdf · uploaded 25 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Certificate No 18_RERA Audit Report 31st March 2023 RLD.pdf · uploaded 28 Jun 2023Source
  • 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate 31Mar2023.pdf · uploaded 29 Jun 2023Source
  • 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate 31Mar2023.pdf · uploaded 29 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)RLD Quality Assurance Certificate Form 31Mar2023.pdf · uploaded 29 Jun 2023Source
  • 7 Disclosure of sold/ booked inventoryRLD Disclosure of Inventory 31Mar2023.pdf · uploaded 29 Jun 2023Source
  • 27 Certificates of CA (Form 3)RLD CA Certificate 31Mar2023.pdf · uploaded 29 Jun 2023Source
  • 8 Disclosure of sold/ booked inventory03 Helios_Disclosure of Sold Inventory_30 09 2021.pdf · uploaded 1 Jul 2023Source
  • 1 Proforma of Agreement for sale1 Proforma Agreement for Sale.pdf · uploaded 3 Jul 2023Source
  • 30 Certificates of Architect (Form 1)(Mandatory for only ongoing project)5 Architect’s Certificate of Percentage of Completion of Work (Form 1)_MAYFAIR HELIOS 2 sd.pdf · uploaded 8 Jul 2023Source
  • 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate 30June2023.pdf · uploaded 17 Jul 2023Source
  • 9 Disclosure of sold/ booked inventoryHelios_Disclosure of Sold Inventory_30 06 2023.pdf · uploaded 17 Jul 2023Source
  • 28 Certificates of CA (Form 3)RLD CA Certificate 30June2023.pdf · uploaded 17 Jul 2023Source
  • 31 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect RLD 30Sep23.pdf · uploaded 20 Oct 2023Source
  • 32 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate RLD Sep 23.pdf · uploaded 14 Dec 2023Source
  • 28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Spe 23.pdf · uploaded 14 Dec 2023Source
  • 10 Disclosure of sold/ booked inventorySold - Unsold Circular1.pdf · uploaded 20 Dec 2023Source
  • 29 Certificates of CA (Form 3)Form 3 Q2_compressed.pdf · uploaded 20 Dec 2023Source
  • 33 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RLD Architect Certificate.pdf · uploaded 2 Feb 2024Source
  • 29 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RLD Engineer Certificate.pdf · uploaded 2 Feb 2024Source
  • 11 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory.pdf · uploaded 2 Feb 2024Source
  • 30 Certificates of CA (Form 3)RERA-Mayfair Helios Cost Statement form 3_compressed.pdf · uploaded 2 Feb 2024Source
  • 34 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Helios Architect Certificate 31Mar2024.pdf · uploaded 30 Apr 2024Source
  • 30 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Helios Engineers Certificate 31Mar2024.pdf · uploaded 30 Apr 2024Source
  • 12 Disclosure of sold/ booked inventoryHelios Disclosure of Inventory 31Mar2024.pdf · uploaded 30 Apr 2024Source
  • 31 Certificates of CA (Form 3)Helios CA Certificate 31Mar2024.pdf · uploaded 30 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Assurance Certificate 31Mar2024.pdf · uploaded 28 May 2024Source
  • 13 Disclosure of sold/ booked inventoryDisclosure of Inventory 31Mar2024.pdf · uploaded 28 May 2024Source
  • 2 PAN CardPAN CARD.pdf · uploaded 29 May 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Aditya Nayan Shah.pdf · uploaded 29 May 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Anay Nayan Shah.pdf · uploaded 29 May 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Anuradha Shah.pdf · uploaded 29 May 2024Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Ashwin Vasavda.pdf · uploaded 29 May 2024Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Kiran Mukhi.pdf · uploaded 29 May 2024Source
  • 6 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Kushal Vasavda.pdf · uploaded 29 May 2024Source
  • 7 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Mehul Vasavda.pdf · uploaded 29 May 2024Source
  • 8 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Nayan Arvind Shah.pdf · uploaded 29 May 2024Source
  • 12 Declaration in FORM BCorrect Form B.pdf · uploaded 18 Jun 2024Source
  • 2 a Details of encumbrances concerned to FinanceLegal encumbrance.pdf · uploaded 18 Jul 2024Source
  • 1 b Details of encumbrances concerned to LegalLegal encumbrance.pdf · uploaded 18 Jul 2024Source
  • 1 CERSAI detailsCERSAI declaration.pdf · uploaded 18 Jul 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A Bank Declaration.pdf · uploaded 18 Jul 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC 02022024.pdf · uploaded 19 Jul 2024Source
  • 1 Declaration about Commencement CertificateCC declaration.pdf · uploaded 19 Jul 2024Source
  • 35 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate RLD 30062024.pdf · uploaded 19 Jul 2024Source
  • 31 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate_RLD_30062024.pdf · uploaded 19 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)01 Quality Assurance Certificate Form 2A RLD_31032020.pdf · uploaded 19 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)02 Quality Assurance Certificate Form 2A RLD_31032021.pdf · uploaded 19 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)03 Quality Assurance Certificate Form 2A RLD_31032022.pdf · uploaded 19 Jul 2024Source
  • 14 Disclosure of sold/ booked inventoryHelios Disclosure of Sold Inventory 30062024.pdf · uploaded 19 Jul 2024Source
  • 32 Certificates of CA (Form 3)Form 3 Q2 2023-24.pdf · uploaded 19 Jul 2024Source
  • 33 Certificates of CA (Form 3)Form 3 Q3 2023-24.pdf · uploaded 19 Jul 2024Source
  • 34 Certificates of CA (Form 3)Form 3 Q4 2023-24_compressed.pdf · uploaded 19 Jul 2024Source
  • 35 Certificates of CA (Form 3)Form 3 Q1 2024-25_compressed.pdf · uploaded 19 Jul 2024Source
  • 13 Declaration in FORM BForm B.pdf · uploaded 25 Jul 2024Source
  • 15 Disclosure of sold/ booked inventoryDisclosure of inventory 25072024_compressed.pdf · uploaded 25 Jul 2024Source
  • 36 Certificates of CA (Form 3)Form 3 Q1 2024-25_compressed.pdf · uploaded 25 Jul 2024Source
  • 14 Declaration in FORM BForm B.pdf · uploaded 26 Jul 2024Source
  • 3 Copy of Layout Approval (in case of layout)HELIOS Approved Plan Page No 1 02 Feb 2024.pdf · uploaded 12 Aug 2024Source
  • 4 Building Plan Approval (IOD)LOI - 08 Nov 2023.pdf · uploaded 12 Aug 2024Source
  • 5 Building Plan Approval (IOD)Plan Page 1-2.pdf · uploaded 12 Aug 2024Source
  • 6 Building Plan Approval (IOD)Plan Pg 3-5A.pdf · uploaded 12 Aug 2024Source
  • 7 Building Plan Approval (IOD)Plan Pg 6.pdf · uploaded 12 Aug 2024Source
  • 8 Building Plan Approval (IOD)Plan Pg 7.pdf · uploaded 12 Aug 2024Source
  • 9 Building Plan Approval (IOD)Plan Pg 8-9.pdf · uploaded 12 Aug 2024Source
  • Form 5 (FY 2023-2024)form 5.pdf · uploaded 30 Sep 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate September 2024 quarterly .pdf · uploaded 30 Oct 2024Source
  • 2 Certificates of CA (Form 3)CA certificate September-compressed (1).pdf · uploaded 30 Oct 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate September 2024 quarterly _compressed.pdf · uploaded 30 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RLD Form 5 FY 202324.pdf · uploaded 30 Dec 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold - Booked Inventory as on 31-09-24.pdf · uploaded 16 Jan 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect 31122024.pdf · uploaded 20 Jan 2025Source
  • 1 Certificates of CA (Form 3)Form 3 RLD Q-3_compressed.pdf · uploaded 20 Jan 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer 31122024_compressed.pdf · uploaded 20 Jan 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold - Booked Inventory as on 31-12-24.pdf · uploaded 20 Jan 2025Source
  • 1 Declaration about Commencement CertificateDeclaration about CC - 02022024.pdf · uploaded 29 Jan 2025Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)5 Format A Declaration about Separate Bank Account.pdf · uploaded 13 Feb 2025Source
  • 2 Declaration about all RERA Designated Bank Accounts (Format A)5 Format A Declaration about Separate Bank Account.pdf · uploaded 13 Feb 2025Source
  • 1 a Details of encumbrances concerned to FinanceFinancial Encumbrance - 04-03-2025_compressed.pdf · uploaded 4 Mar 2025Source
  • 1 b Details of encumbrances concerned to LegalFinancial Encumbrance - 04-03-2025_compressed.pdf · uploaded 4 Mar 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 16 Apr 2025Source
  • 1 Certificates of CA (Form 3)FORM-3.pdf · uploaded 16 Apr 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM-2.pdf · uploaded 16 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold,Booked Inventory.pdf · uploaded 16 Apr 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 21 Apr 2025Source
  • 1 Certificates of CA (Form 3)FORM 3.pdf · uploaded 21 Apr 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 21 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold,Booked Inventory.pdf · uploaded 21 Apr 2025Source
  • Form 2A (FY 2024-2025)Form 2A Sysytem Generated - RLD Signed.pdf · uploaded 30 Jun 2025Source
  • Form 1Form 1.pdf · uploaded 18 Jul 2025Source
  • Form 2Form 2.pdf · uploaded 18 Jul 2025Source
  • Form 3Form 3_compressed.pdf · uploaded 18 Jul 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD Inventory_Signed.pdf · uploaded 18 Jul 2025Source
  • Withdrawal Update Form 1ARCHITECT CERTIFICATE20250822_13383228.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE20250822_13325255.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 23 Aug 2025Source
  • Form 5 (FY 2024-2025)Form 5- RLD System Generated - 24-25- to be uploaded.pdf · uploaded 20 Sep 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 3FORM 3_compressed.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 1Form 1 Q4.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 2Form 2 Q4.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 3Form 3 Q4_compressed.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Q4.pdf · uploaded 6 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Q4.pdf · uploaded 6 Jun 2026Source
  • Withdrawal Update Form 3Form 3 Q4_compressed.pdf · uploaded 6 Jun 2026Source
  • Form 5 (FY 2025-2026)Form 5 RLD 2025-26.pdf · uploaded 23 Sep 2026Source

Planning Authority

  • DocumentCert_RB_638083_4073eGKtSign.pdf · uploaded 6 Jun 2026Source
  • DocumentVfedywEWUQ7.12_EXTRACT.pdf · uploaded 6 Jun 2026Source
  • Document1769758214_TMCB-25-ENTRY-08377_R1.html · uploaded 6 Jun 2026Source
  • Document1769758214_TMCB-25-ENTRY-08377_R1.pdf_8_11DSE_Sign.pdfSign.pdf · uploaded 6 Jun 2026Source
  • DocumentwqtVd9IvlkPERMISSION-C.C._dt.02-02-2024.pdf · uploaded 6 Jun 2026Source
  • DocumentwqtVd9Ivlksanction_plan.pdf · uploaded 6 Jun 2026Source
  • DocumentwqtVd9IvlkREPORT.pdf · uploaded 6 Jun 2026Source

Technical

  • DocumentCC with amended plan 050517 part a.pdf · uploaded 21 Jul 2017Source
  • DocumentCC with amended plan 050517 part b.pdf · uploaded 21 Jul 2017Source
  • DocumentCC with amended plan 050517 part a.pdf · uploaded 21 Jul 2017Source
  • DocumentCC with amended plan 050517 part b.pdf · uploaded 21 Jul 2017Source
  • DocumentCC with amended plan 050517 part b.pdf · uploaded 21 Jul 2017Source
  • DocumentHELIOS Approved Plan Page No 1 02 Feb 2024.pdf · uploaded 12 Aug 2024Source
  • DocumentLOI - 08 Nov 2023.pdf · uploaded 12 Aug 2024Source
  • DocumentPlan Page 1-2.pdf · uploaded 12 Aug 2024Source
  • DocumentPlan Pg 3-5A.pdf · uploaded 12 Aug 2024Source
  • DocumentPlan Pg 6.pdf · uploaded 12 Aug 2024Source
  • DocumentPlan Pg 7.pdf · uploaded 12 Aug 2024Source
  • DocumentPlan Pg 8-9.pdf · uploaded 12 Aug 2024Source

Technical (Architect)

  • DocumentArchitect certificate September 2024 quarterly .pdf · uploaded 30 Oct 2024Source
  • DocumentForm 1 Architect 31122024.pdf · uploaded 20 Jan 2025Source
  • DocumentFORM 1.pdf · uploaded 16 Apr 2025Source
  • DocumentFORM 1.pdf · uploaded 21 Apr 2025Source
  • DocumentForm 1 Q4.pdf · uploaded 28 Apr 2026Source

Technical (Engineer)

  • DocumentEngineer Certificate September 2024 quarterly _compressed.pdf · uploaded 30 Oct 2024Source
  • DocumentForm 2 Engineer 31122024_compressed.pdf · uploaded 20 Jan 2025Source
  • DocumentFORM-2.pdf · uploaded 16 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 21 Apr 2025Source
  • DocumentForm 2 Q4.pdf · uploaded 28 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsNew Survey No 104/17 of

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK468 units in all
Address
New Survey No 104/17 of VILLAGE BALKUM THANE, Kolshet Road, KolshetPIN 400607
Village
Thane (M Corp.), Thane taluka
Designated bank account
109
Developed in phases
Yes

Survey, CTS, gat or plot numbers

New Survey No 104/17 of

Boundaries

North
Survey No 197
South
Survey No 235 A pt 235 B pt Survey No 198 199 200
East
Survey No 235 B Pt and Survey No 197
West
Kolshet Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking468 units

0 of 468 units booked (0%), as the promoter reported to MahaRERA

1BHK · 388 units2BHK · 80 units
TypeCarpet areaUnitsBooked
1BHK33.82 sq m · 364 sq ft1590
1BHK36.37 sq m · 391 sq ft780
1BHK50 sq m · 538 sq ft1510
2BHK49.36 sq m · 531 sq ft800

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals8

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnil Jagwani—
ArchitectJai Mistry—
Chartered accountantAshish Ramavatar Kumawat—
Chartered accountantJ P M S & Associates LLP—
EngineerJagabandhu Jogi Dalai—
EngineerRatnakar Namdevrao Devade—
EngineerSameer Satish Kasegaonkar—
EngineerSanjeev Basavantappa Tigadi—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology