Odysseus
Deedo IDDP-THN-X8T6Completion was pushed back 4 months, to Jan 2027; no MahaRERA orders on record; 42% of its units are booked.
Thane (M Corp.), Thane 400607 · Promoter: Sagar Enterprise
Completion was pushed back 4 months, to Jan 2027
- This projectRegistered 21 Apr 2023, completion promised 30 Sep 2026, revised to 30 Jan 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700050539
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700050539 | 21 Apr 2023 | 30 Sep 2026 | 30 Jan 2027 | Sagar Enterprise | Project page |
Documents114
2 documents held by Deedo, 112 filings listed on MahaRERA's project page
Finance
- PAN CardSagar Enterprise Pan Card.pdf · uploaded 30 Jan 2023Source
Legal
Show all 114 documentsShow fewer documents
Migrated
- 2 a Details of encumbrances concerned to FinanceLegal Encumbrances Letter.pdf · uploaded 1 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalFinance Encumbrances Letter.pdf · uploaded 1 Feb 2023Source
- 2 b Details of encumbrances concerned to LegalLegal Encumbrances Letter.pdf · uploaded 1 Feb 2023Source
- 1 Declaration in FORM BFORM -B (Promoter).pdf · uploaded 1 Feb 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Merged.pdf · uploaded 1 Feb 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A Sagar Enterprise.pdf · uploaded 1 Feb 2023Source
- 1 Copy of the legal title reportMahaRera Title Report oDYSSEUS.pdf · uploaded 6 Feb 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM III.pdf · uploaded 11 Feb 2023Source
- 1 Proforma of Allotment letterAllotment Letter_Odysseeus_Sagar Enterprises.pdf · uploaded 1 Mar 2023Source
- 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 3 Mar 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200261910245_For_Asset_Based_Search_03_03_2023_11_48_49_852.pdf · uploaded 3 Mar 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report-Allotment Letter.pdf · uploaded 3 Mar 2023Source
- 1 Copy of Layout Approval (in case of layout)Odysseus copy of layout.pdf · uploaded 21 Mar 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentCC Plan Copy.pdf · uploaded 21 Mar 2023Source
- 1 Proforma of Agreement for saleRERA AGREEMENT_Odysseeus_Sagar Enterprises_19042023 (1).pdf · uploaded 19 Apr 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report_Odysseus_11zon.pdf · uploaded 20 Apr 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Odysseus as on June 2023.pdf · uploaded 22 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Odysseus as on September 2023.pdf · uploaded 22 Dec 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on June 2023.pdf · uploaded 26 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on September 2023.pdf · uploaded 26 Dec 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Odysseus as on June 2023.pdf · uploaded 26 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Odysseus as on September 2023.pdf · uploaded 26 Dec 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Odysseus as on Dec 2023.pdf · uploaded 5 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 of Odysseus as on Dec 2023.pdf · uploaded 13 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 31-12-2023.pdf · uploaded 13 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 19 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 2023.pdf · uploaded 19 Jan 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 31 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Odysseus as on March 2024.pdf · uploaded 8 Apr 2024Source
- 2 Copy of Layout Approval (in case of layout)1.pdf · uploaded 6 Jul 2024Source
- 2 Building Plan Approval / NA Order for plotted development2-4.pdf · uploaded 6 Jul 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCC - Odysseus.pdf · uploaded 6 Jul 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM I.pdf · uploaded 6 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 6 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on March 2024.pdf · uploaded 9 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 31-03-2024.pdf · uploaded 9 Jul 2024Source
- 2 Declaration about Commencement CertificateFormat D.pdf · uploaded 10 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form II.pdf · uploaded 10 Jul 2024Source
- 2 Disclosure of sold/ booked inventorySold-Unsold Inventory.pdf · uploaded 10 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form III.pdf · uploaded 10 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on June 2024.pdf · uploaded 27 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 27 Jul 2024Source
- 1 a Details of encumbrances concerned to FinanceENCUMBRANCES CERTIFICATE.pdf · uploaded 12 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 12 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM I - ODYSSEUS as on Sep 2024.pdf · uploaded 12 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 12 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 12 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 12 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 12 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 12 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalENCUMBRANCES CERTIFICATE.pdf · uploaded 12 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Odysseus as on Sep 2024.pdf · uploaded 22 Nov 2024Source
- 1 Proforma of Agreement for saleOdysseus AFS.pdf · uploaded 27 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on Sep 2024.pdf · uploaded 11 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 19 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 19 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 31st December 2024.pdf · uploaded 20 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 31st March 2025.pdf · uploaded 20 Apr 2025Source
- Form 5 (FY 2023-2024)Form 5 Odysseus for FY 2023-24.pdf · uploaded 27 Feb 2026Source
- Form 5 (FY 2024-2025)Form 5 - Odysseus for FY 2024-25.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
- Withdrawal Update Form 1Form 1 - Odysseus as on March 2026.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 2Form 2 - Odysseus as on March 2026.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 3Form 3 - Odysseus as on March 2026.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 1ODYSSEUS-FORM -1 (1).pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Form 2 - Odysseus June 2026.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Odysseus_Form3_Q1_2026-27_18-07-2026_11-14_doc1.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1ODYSSEUS-FORM -1 (1).pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 2Form 2 - Odysseus June 2026.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 3Odysseus_Form3_Q1_2026-27_18-07-2026_11-14_doc1.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 1ODYSSEUS-FORM -1 (1).pdf · uploaded 1 Sep 2026Source
- Withdrawal Update Form 2Form 2 - Odysseus June 2026.pdf · uploaded 1 Sep 2026Source
- Withdrawal Update Form 3Odysseus_Form3_Q1_2026-27_18-07-2026_11-14_doc1.pdf · uploaded 1 Sep 2026Source
- Form 2A (FY 2024-2025)Form -2A Year 2024-2025.pdf · uploaded 9 Oct 2026Source
- Form 2A (FY 2025-2026)Form -2A Year 2025-2026.pdf · uploaded 9 Oct 2026Source
- Form 5 (FY 2025-2026)Form 5 - Odysseus for FY 2025-26.pdf · uploaded 9 Oct 2026Source
Technical
- DocumentOdysseus copy of layout.pdf · uploaded 21 Mar 2023Source
- DocumentCC Plan Copy.pdf · uploaded 21 Mar 2023Source
- Document1.pdf · uploaded 6 Jul 2024Source
- Document2-4.pdf · uploaded 6 Jul 2024Source
- DocumentPlan 1.pdf · uploaded 12 Nov 2024Source
- DocumentPlan 2.pdf · uploaded 12 Nov 2024Source
- DocumentPlan 3.pdf · uploaded 12 Nov 2024Source
- DocumentPlan 4.pdf · uploaded 12 Nov 2024Source
- DocumentPlan 5.pdf · uploaded 12 Nov 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsHissa No.5, Survey No.180
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Landowner Unit, Landowner Units, Office space, —125 units in all
- Address
- Survey No.180, Hissa No.5, Kolshet, KolshetPIN 400607
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.25433, 72.98730
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- New Horizon School
- South
- Survey No-189 Hissa No-5
- East
- Nalah
- West
- Villa Grand Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking125 units
53 of 125 units booked (42%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | Landowner Unit | 45.61 sq m · 491 sq ft | 2 | 2 |
| Wing A | Landowner Unit | 46.25 sq m · 498 sq ft | 1 | 1 |
| Wing A | Landowner Unit | 47.89 sq m · 515 sq ft | 2 | 2 |
| Wing A | Landowner Unit | 48.62 sq m · 523 sq ft | 2 | 2 |
| Wing A | Landowner Unit | 49.02 sq m · 528 sq ft | 1 | 1 |
| Wing A | Landowner Unit | 61.64 sq m · 663 sq ft | 1 | 1 |
| Wing A | Landowner Unit | 62.35 sq m · 671 sq ft | 2 | 2 |
| Wing A | Landowner Unit | 106.44 sq m · 1,146 sq ft | 2 | 2 |
Show all 51 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | Landowner Unit | 109.59 sq m · 1,180 sq ft | 3 | 3 |
| Wing A | Landowner Units | 39.32 sq m · 423 sq ft | 2 | 2 |
| Wing A | Landowner Units | 40.91 sq m · 440 sq ft | 2 | 2 |
| Wing A | Landowner Units | 44.72 sq m · 481 sq ft | 2 | 2 |
| Wing A | Landowner Units | 45.85 sq m · 494 sq ft | 2 | 2 |
| Wing A | Landowner Units | 49.14 sq m · 529 sq ft | 1 | 1 |
| Wing A | Landowner Units | 49.33 sq m · 531 sq ft | 2 | 2 |
| Wing A | Landowner Units | 49.92 sq m · 537 sq ft | 2 | 2 |
| Wing A | Landowner Units | 50.09 sq m · 539 sq ft | 2 | 2 |
| Wing A | Landowner Units | 72.01 sq m · 775 sq ft | 2 | 2 |
| Wing A | Landowner Units | 82.62 sq m · 889 sq ft | 2 | 2 |
| Wing A | Office space | 38.42 sq m · 414 sq ft | 1 | 0 |
| Wing A | Office space | 39.32 sq m · 423 sq ft | 5 | 1 |
| Wing A | Office space | 40.91 sq m · 440 sq ft | 5 | 1 |
| Wing A | Office space | 43.72 sq m · 471 sq ft | 2 | 0 |
| Wing A | Office space | 44.66 sq m · 481 sq ft | 1 | 0 |
| Wing A | Office space | 44.72 sq m · 481 sq ft | 5 | 1 |
| Wing A | Office space | 45.42 sq m · 489 sq ft | 1 | 0 |
| Wing A | Office space | 45.61 sq m · 491 sq ft | 5 | 1 |
| Wing A | Office space | 45.85 sq m · 494 sq ft | 4 | 1 |
| Wing A | Office space | 46.99 sq m · 506 sq ft | 2 | 0 |
| Wing A | Office space | 47.72 sq m · 514 sq ft | 2 | 0 |
| Wing A | Office space | 47.89 sq m · 515 sq ft | 5 | 1 |
| Wing A | Office space | 48.38 sq m · 521 sq ft | 2 | 0 |
| Wing A | Office space | 48.62 sq m · 523 sq ft | 5 | 2 |
| Wing A | Office space | 48.98 sq m · 527 sq ft | 1 | 0 |
| Wing A | Office space | 49.11 sq m · 529 sq ft | 1 | 0 |
| Wing A | Office space | 49.17 sq m · 529 sq ft | 1 | 0 |
| Wing A | Office space | 49.33 sq m · 531 sq ft | 4 | 2 |
| Wing A | Office space | 49.92 sq m · 537 sq ft | 4 | 2 |
| Wing A | Office space | 50.09 sq m · 539 sq ft | 5 | 2 |
| Wing A | Office space | 62.35 sq m · 671 sq ft | 5 | 1 |
| Wing A | Office space | 67.27 sq m · 724 sq ft | 1 | 0 |
| Wing A | Office space | 72.01 sq m · 775 sq ft | 3 | 1 |
| Wing A | Office space | 81.54 sq m · 878 sq ft | 1 | 0 |
| Wing A | Office space | 82.62 sq m · 889 sq ft | 5 | 1 |
| Wing A | Office space | 83.14 sq m · 895 sq ft | 1 | 0 |
| Wing A | Office space | 105.36 sq m · 1,134 sq ft | 1 | 0 |
| Wing A | Office space | 106.44 sq m · 1,146 sq ft | 5 | 1 |
| Wing A | Office space | 107.72 sq m · 1,159 sq ft | 1 | 0 |
| Wing A | Office space | 109.59 sq m · 1,180 sq ft | 5 | 0 |
| Wing A | Office space | 387.49 sq m · 4,171 sq ft | 1 | 0 |
| — | — | — | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | CA Parth Gada | — |
| Engineer | Sarvesh Patil | — |
Source: MahaRERA project page. Contact details are not shown.