Commercial · 1 building · 125 unitsRERA P51700050539

Odysseus

Deedo IDDP-THN-X8T6

Completion was pushed back 4 months, to Jan 2027; no MahaRERA orders on record; 42% of its units are booked.

Thane (M Corp.), Thane 400607 · Promoter: Sagar Enterprise

DeliveryExtended 4 moPromised Sep 2026 · now due Jan 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales42% booked53 of 125 units · as the promoter reported to MahaRERA
Odysseus project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Jan 2027

  • This projectRegistered 21 Apr 2023, completion promised 30 Sep 2026, revised to 30 Jan 2027.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700050539
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170005053921 Apr 202330 Sep 202630 Jan 2027Sagar EnterpriseProject page
Documents114

2 documents held by Deedo, 112 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardSagar Enterprise Pan Card.pdf · uploaded 30 Jan 2023Source

Legal

  • Declaration Form BFORM -B (Promoter).pdf · uploaded 1 Feb 2023Source
  • Legal Title reportMahaRera Title Report oDYSSEUS.pdf · uploaded 6 Feb 2023Source

Migrated

  • 1 PAN CardSagar Enterprise Pan Card.pdf · uploaded 30 Jan 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 30 Jan 2023Source
  • 1 a Details of encumbrances concerned to FinanceFinance Encumbrances Letter.pdf · uploaded 1 Feb 2023Source
Show all 114 documentsShow fewer documents

Migrated

  • 2 a Details of encumbrances concerned to FinanceLegal Encumbrances Letter.pdf · uploaded 1 Feb 2023Source
  • 1 b Details of encumbrances concerned to LegalFinance Encumbrances Letter.pdf · uploaded 1 Feb 2023Source
  • 2 b Details of encumbrances concerned to LegalLegal Encumbrances Letter.pdf · uploaded 1 Feb 2023Source
  • 1 Declaration in FORM BFORM -B (Promoter).pdf · uploaded 1 Feb 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Merged.pdf · uploaded 1 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A Sagar Enterprise.pdf · uploaded 1 Feb 2023Source
  • 1 Copy of the legal title reportMahaRera Title Report oDYSSEUS.pdf · uploaded 6 Feb 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM III.pdf · uploaded 11 Feb 2023Source
  • 1 Proforma of Allotment letterAllotment Letter_Odysseeus_Sagar Enterprises.pdf · uploaded 1 Mar 2023Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 3 Mar 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_200261910245_For_Asset_Based_Search_03_03_2023_11_48_49_852.pdf · uploaded 3 Mar 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report-Allotment Letter.pdf · uploaded 3 Mar 2023Source
  • 1 Copy of Layout Approval (in case of layout)Odysseus copy of layout.pdf · uploaded 21 Mar 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentCC Plan Copy.pdf · uploaded 21 Mar 2023Source
  • 1 Proforma of Agreement for saleRERA AGREEMENT_Odysseeus_Sagar Enterprises_19042023 (1).pdf · uploaded 19 Apr 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report_Odysseus_11zon.pdf · uploaded 20 Apr 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Odysseus as on June 2023.pdf · uploaded 22 Dec 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Odysseus as on September 2023.pdf · uploaded 22 Dec 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on June 2023.pdf · uploaded 26 Dec 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on September 2023.pdf · uploaded 26 Dec 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Odysseus as on June 2023.pdf · uploaded 26 Dec 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Odysseus as on September 2023.pdf · uploaded 26 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Odysseus as on Dec 2023.pdf · uploaded 5 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 of Odysseus as on Dec 2023.pdf · uploaded 13 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 31-12-2023.pdf · uploaded 13 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 19 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 2023.pdf · uploaded 19 Jan 2024Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 31 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Odysseus as on March 2024.pdf · uploaded 8 Apr 2024Source
  • 2 Copy of Layout Approval (in case of layout)1.pdf · uploaded 6 Jul 2024Source
  • 2 Building Plan Approval / NA Order for plotted development2-4.pdf · uploaded 6 Jul 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC - Odysseus.pdf · uploaded 6 Jul 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM I.pdf · uploaded 6 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 6 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on March 2024.pdf · uploaded 9 Jul 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 31-03-2024.pdf · uploaded 9 Jul 2024Source
  • 2 Declaration about Commencement CertificateFormat D.pdf · uploaded 10 Jul 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form II.pdf · uploaded 10 Jul 2024Source
  • 2 Disclosure of sold/ booked inventorySold-Unsold Inventory.pdf · uploaded 10 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form III.pdf · uploaded 10 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on June 2024.pdf · uploaded 27 Jul 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 27 Jul 2024Source
  • 1 a Details of encumbrances concerned to FinanceENCUMBRANCES CERTIFICATE.pdf · uploaded 12 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 12 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM I - ODYSSEUS as on Sep 2024.pdf · uploaded 12 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 12 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 12 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 12 Nov 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 12 Nov 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 12 Nov 2024Source
  • 1 b Details of encumbrances concerned to LegalENCUMBRANCES CERTIFICATE.pdf · uploaded 12 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Odysseus as on Sep 2024.pdf · uploaded 22 Nov 2024Source
  • 1 Proforma of Agreement for saleOdysseus AFS.pdf · uploaded 27 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Odysseus as on Sep 2024.pdf · uploaded 11 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 19 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf · uploaded 19 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 19 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 31st December 2024.pdf · uploaded 20 Apr 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Odysseus as on 31st March 2025.pdf · uploaded 20 Apr 2025Source
  • Form 5 (FY 2023-2024)Form 5 Odysseus for FY 2023-24.pdf · uploaded 27 Feb 2026Source
  • Form 5 (FY 2024-2025)Form 5 - Odysseus for FY 2024-25.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 1FROM I.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 2Form 2 - Odysseus as on June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 3Form 3 of Odysseus as on 30th June 2024.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 1Form 1 - Odysseus as on March 2026.pdf · uploaded 20 May 2026Source
  • Withdrawal Update Form 2Form 2 - Odysseus as on March 2026.pdf · uploaded 20 May 2026Source
  • Withdrawal Update Form 3Form 3 - Odysseus as on March 2026.pdf · uploaded 20 May 2026Source
  • Withdrawal Update Form 1ODYSSEUS-FORM -1 (1).pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Odysseus June 2026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Odysseus_Form3_Q1_2026-27_18-07-2026_11-14_doc1.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 1ODYSSEUS-FORM -1 (1).pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 2Form 2 - Odysseus June 2026.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 3Odysseus_Form3_Q1_2026-27_18-07-2026_11-14_doc1.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 1ODYSSEUS-FORM -1 (1).pdf · uploaded 1 Sep 2026Source
  • Withdrawal Update Form 2Form 2 - Odysseus June 2026.pdf · uploaded 1 Sep 2026Source
  • Withdrawal Update Form 3Odysseus_Form3_Q1_2026-27_18-07-2026_11-14_doc1.pdf · uploaded 1 Sep 2026Source
  • Form 2A (FY 2024-2025)Form -2A Year 2024-2025.pdf · uploaded 9 Oct 2026Source
  • Form 2A (FY 2025-2026)Form -2A Year 2025-2026.pdf · uploaded 9 Oct 2026Source
  • Form 5 (FY 2025-2026)Form 5 - Odysseus for FY 2025-26.pdf · uploaded 9 Oct 2026Source

Technical

  • DocumentOdysseus copy of layout.pdf · uploaded 21 Mar 2023Source
  • DocumentCC Plan Copy.pdf · uploaded 21 Mar 2023Source
  • Document1.pdf · uploaded 6 Jul 2024Source
  • Document2-4.pdf · uploaded 6 Jul 2024Source
  • DocumentPlan 1.pdf · uploaded 12 Nov 2024Source
  • DocumentPlan 2.pdf · uploaded 12 Nov 2024Source
  • DocumentPlan 3.pdf · uploaded 12 Nov 2024Source
  • DocumentPlan 4.pdf · uploaded 12 Nov 2024Source
  • DocumentPlan 5.pdf · uploaded 12 Nov 2024Source

Technical (Architect)

  • DocumentFORM I - ODYSSEUS as on Sep 2024.pdf · uploaded 12 Nov 2024Source
  • Document6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 19 Feb 2025Source
  • DocumentODYSSEUS-FORM -1 (1).pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 - Odysseus as on Sep 2024.pdf · uploaded 11 Dec 2024Source
  • Document7 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 19 Feb 2025Source
  • DocumentForm 2 - Odysseus June 2026.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsHissa No.5, Survey No.180

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Landowner Unit, Landowner Units, Office space, —125 units in all
Address
Survey No.180, Hissa No.5, Kolshet, KolshetPIN 400607
Village
Thane (M Corp.), Thane taluka
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

Hissa No.5Survey No.180

Boundaries

North
New Horizon School
South
Survey No-189 Hissa No-5
East
Nalah
West
Villa Grand Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking125 units

53 of 125 units booked (42%), as the promoter reported to MahaRERA

Landowner Unit · 16 unitsLandowner Units · 19 unitsOffice space · 90 units— · 0 units
BuildingTypeCarpet areaUnitsBooked
Wing ALandowner Unit45.61 sq m · 491 sq ft22
Wing ALandowner Unit46.25 sq m · 498 sq ft11
Wing ALandowner Unit47.89 sq m · 515 sq ft22
Wing ALandowner Unit48.62 sq m · 523 sq ft22
Wing ALandowner Unit49.02 sq m · 528 sq ft11
Wing ALandowner Unit61.64 sq m · 663 sq ft11
Wing ALandowner Unit62.35 sq m · 671 sq ft22
Wing ALandowner Unit106.44 sq m · 1,146 sq ft22
Show all 51 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing ALandowner Unit109.59 sq m · 1,180 sq ft33
Wing ALandowner Units39.32 sq m · 423 sq ft22
Wing ALandowner Units40.91 sq m · 440 sq ft22
Wing ALandowner Units44.72 sq m · 481 sq ft22
Wing ALandowner Units45.85 sq m · 494 sq ft22
Wing ALandowner Units49.14 sq m · 529 sq ft11
Wing ALandowner Units49.33 sq m · 531 sq ft22
Wing ALandowner Units49.92 sq m · 537 sq ft22
Wing ALandowner Units50.09 sq m · 539 sq ft22
Wing ALandowner Units72.01 sq m · 775 sq ft22
Wing ALandowner Units82.62 sq m · 889 sq ft22
Wing AOffice space38.42 sq m · 414 sq ft10
Wing AOffice space39.32 sq m · 423 sq ft51
Wing AOffice space40.91 sq m · 440 sq ft51
Wing AOffice space43.72 sq m · 471 sq ft20
Wing AOffice space44.66 sq m · 481 sq ft10
Wing AOffice space44.72 sq m · 481 sq ft51
Wing AOffice space45.42 sq m · 489 sq ft10
Wing AOffice space45.61 sq m · 491 sq ft51
Wing AOffice space45.85 sq m · 494 sq ft41
Wing AOffice space46.99 sq m · 506 sq ft20
Wing AOffice space47.72 sq m · 514 sq ft20
Wing AOffice space47.89 sq m · 515 sq ft51
Wing AOffice space48.38 sq m · 521 sq ft20
Wing AOffice space48.62 sq m · 523 sq ft52
Wing AOffice space48.98 sq m · 527 sq ft10
Wing AOffice space49.11 sq m · 529 sq ft10
Wing AOffice space49.17 sq m · 529 sq ft10
Wing AOffice space49.33 sq m · 531 sq ft42
Wing AOffice space49.92 sq m · 537 sq ft42
Wing AOffice space50.09 sq m · 539 sq ft52
Wing AOffice space62.35 sq m · 671 sq ft51
Wing AOffice space67.27 sq m · 724 sq ft10
Wing AOffice space72.01 sq m · 775 sq ft31
Wing AOffice space81.54 sq m · 878 sq ft10
Wing AOffice space82.62 sq m · 889 sq ft51
Wing AOffice space83.14 sq m · 895 sq ft10
Wing AOffice space105.36 sq m · 1,134 sq ft10
Wing AOffice space106.44 sq m · 1,146 sq ft51
Wing AOffice space107.72 sq m · 1,159 sq ft10
Wing AOffice space109.59 sq m · 1,180 sq ft50
Wing AOffice space387.49 sq m · 4,171 sq ft10
———00

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantCA Parth Gada—
EngineerSarvesh Patil—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology