Morya Heights
It is due for completion in Dec 2027, with no extension on record; no MahaRERA orders on record; 94% of its units are booked.
Thane (M Corp.), Thane 400604 · Promoter: Morya Infraconstruct Private Limited
It is due for completion in Dec 2027, with no extension on record
- This projectRegistered 11 Aug 2017, completion promised 31 Dec 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700005511
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700005511 | 11 Aug 2017 | 31 Dec 2027 | 31 Dec 2027 | Morya Infraconstruct Private Limited | Project page |
Documents214
1 document held by Deedo, 213 filings listed on MahaRERA's project page
Finance
- PAN CardMorya Infra - Pan No.pdf · uploaded 31 Jul 2017Source
Legal
- Legal Title reportThane search report.pdf · uploaded 30 Jul 2017Source
- Declaration Form BWednesday, July 26, 2017 (4) (1).pdf · uploaded 30 Jul 2017Source
- OtherPLAN (1).pdf · uploaded 23 Jul 2020Source
- OtherDeclaration letter.pdf · uploaded 9 Nov 2022Source
- Declaration Form BAdobe Scan Dec 13, 2024 (2).pdf · uploaded 18 Jan 2025Source
- Declaration Form BAdobe Scan Dec 13, 2024 (1).pdf · uploaded 18 Jan 2025Source
Show all 214 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportThane search report.pdf · uploaded 30 Jul 2017Source
- 1 Details of encumbrancesThane search report.pdf · uploaded 30 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentRevised CC Sale.pdf · uploaded 30 Jul 2017Source
- 1 Declaration in FORM BWednesday, July 26, 2017 (4) (1).pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)rera 2 (3 files merged).pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 30 Jul 2017Source
- 1 Proforma of Allotment letterALLOTMENT LETTER _ MORYA HEIGHTS .pdf · uploaded 30 Jul 2017Source
- 2 Proforma of Allotment letterDRAFT PHASE -I.pdf · uploaded 30 Jul 2017Source
- 1 PAN CardMorya Infra - Pan No.pdf · uploaded 31 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)Sale Plan 1 (1).pdf · uploaded 31 Jul 2017Source
- 1 Building Plan Approval (IOD)Revised CC Sale.pdf · uploaded 31 Jul 2017Source
- 1 Certificates of CA (Form 3)CA Certificate MH.pdf · uploaded 31 Jul 2017Source
- 1 OtherPLAN (1).pdf · uploaded 23 Jul 2020Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT certificate.pdf · uploaded 7 Nov 2020Source
- 1 Details of Restarting of Construction work post lockdownARCHITECT certificate.pdf · uploaded 7 Nov 2020Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 14th Floor.pdf · uploaded 7 Jun 2021Source
- 1 Declaration about Commencement CertificateCC declaration .pdf · uploaded 14 Aug 2021Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 14th Floor (1) (1).pdf · uploaded 14 Aug 2021Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 Engg Certificate (1).pdf · uploaded 14 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryDisclosure for Inventory 30June2021_compressed.pdf · uploaded 14 Aug 2021Source
- 2 Disclosure of sold/ booked inventorymorya heights (1).pdf · uploaded 16 Feb 2022Source
- 2 Copy of Layout Approval (in case of layout)PLAN 4 (2).pdf · uploaded 25 Oct 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentVPNoS3T (3).pdf · uploaded 25 Oct 2022Source
- 2 OtherDeclaration letter.pdf · uploaded 9 Nov 2022Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2) Engineer Certificate thane 31st Dec 2022.pdf · uploaded 12 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2020 Quality Assurance.pdf · uploaded 12 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2021 Quality Assurance.pdf · uploaded 12 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance certificate 2122.pdf · uploaded 12 Jan 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)3) Quality Assurance certificate of thane 31st Dec 2022.pdf · uploaded 12 Jan 2023Source
- 3 Disclosure of sold/ booked inventory2 Disclosure of sold_ booked inventory (1).pdf · uploaded 12 Jan 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200257430380_For_Asset_Based_Search_12_01_2023_15_42_02_792.pdf · uploaded 12 Jan 2023Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2) Engineer Certificate Q I Fy 2023-24 (1).pdf · uploaded 8 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)3) Quality Assurance Certificate - FY 22-23 Q-IV.pdf · uploaded 8 Jul 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)3) Qulity Assurance Q I FY 2023-24 (1).pdf · uploaded 8 Jul 2023Source
- 4 Disclosure of sold/ booked inventory3 Disclosure of sold_ booked inventory.pdf · uploaded 23 May 2024Source
- 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)4 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf · uploaded 20 Dec 2024Source
- 3 Disclosure of sold/ booked inventory4 Disclosure of sold_ booked inventory.pdf · uploaded 20 Dec 2024Source
- 1 CERSAI details1 CERSAI details.pdf · uploaded 20 Dec 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold MIPL f.pdf · uploaded 3 Jan 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 15 March 23.pdf · uploaded 13 Jan 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 30 June 23.pdf · uploaded 13 Jan 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 25 sept 23.pdf · uploaded 13 Jan 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 26 dec 23.pdf · uploaded 13 Jan 2025Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 20 march 24.pdf · uploaded 13 Jan 2025Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 28 June 24.pdf · uploaded 13 Jan 2025Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 30dec 24.pdf · uploaded 13 Jan 2025Source
- 9 Certificates of CA (Form 3)MH CA Certificate 30 Sep 2024.pdf · uploaded 13 Jan 2025Source
- 8 Certificates of CA (Form 3)MH CA Certificate 30 June 2024.pdf · uploaded 13 Jan 2025Source
- 7 Certificates of CA (Form 3)MH CA Certificate 31 MARCH 2024.pdf · uploaded 13 Jan 2025Source
- 6 Certificates of CA (Form 3)MH CA Certificate 31 Dec 2023.pdf · uploaded 13 Jan 2025Source
- 4 Certificates of CA (Form 3)MH CA Certificate 30 June 2023.pdf · uploaded 13 Jan 2025Source
- 3 Certificates of CA (Form 3)2) 31122023 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 2 Certificates of CA (Form 3)1) 30092023 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 1 Certificates of CA (Form 3)6) 30062023 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 5 Certificates of CA (Form 3)MH CA Certificate 30 Sep 2023.pdf · uploaded 13 Jan 2025Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)4) 30062024 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)5) 30092024 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)3) 31032024 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)3) 31032024 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2) 31122023 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)1) 30092023 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)6) 30062023 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- 2 Copy of Layout Approval (in case of layout)scan0164-compressed.pdf · uploaded 14 Jan 2025Source
- 3 Copy of Layout Approval (in case of layout)SP 1.pdf · uploaded 14 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)scan0165-compressed.pdf · uploaded 14 Jan 2025Source
- 6 Building Plan Approval (IOD)Part OC Rehab.pdf · uploaded 14 Jan 2025Source
- 5 Building Plan Approval (IOD)Amendment in plan.pdf · uploaded 14 Jan 2025Source
- 4 Building Plan Approval (IOD)DOC012.pdf · uploaded 14 Jan 2025Source
- 2 Building Plan Approval (IOD)SP 2.pdf · uploaded 14 Jan 2025Source
- 1 Building Plan Approval (IOD)SP 3.pdf · uploaded 14 Jan 2025Source
- 3 Building Plan Approval (IOD)SP 4.pdf · uploaded 14 Jan 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDIN.pdf · uploaded 14 Jan 2025Source
- 2 Declaration in FORM BAdobe Scan Dec 13, 2024 (1).pdf · uploaded 18 Jan 2025Source
- 1 Declaration in FORM BAdobe Scan Dec 13, 2024 (2).pdf · uploaded 18 Jan 2025Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QI - FY 2024-25 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf · uploaded 29 Jan 2025Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q-II FY-2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q-II FY-2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QI - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q II - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QIII - FY 2023-24 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf · uploaded 29 Jan 2025Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q IV - FY-2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)declaration about separate bank Account for real Estate.pdf · uploaded 29 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)01) 30-09-2023 Quality Assurance Certificate QII FY 2023-24.pdf · uploaded 29 Jan 2025Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)05) 30-09-2024 Quality Assurance Certificate QII - FY 2024-25.pdf · uploaded 29 Jan 2025Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)04) 30-06-2024 Quality Assurance Certificate QI - FY 2024-25.pdf · uploaded 29 Jan 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)03) 31-03-2024 Quality Assurance Certificate QIV - FY 2023-24.pdf · uploaded 29 Jan 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)02) 31-12-2023 Quality Assurance Certificate QIII - FY 2023-24.pdf · uploaded 29 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)FORM 5 MORYA HEIGHTS.pdf · uploaded 30 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 MORYA HEIGHTS.pdf · uploaded 30 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 MORYA HEIGHTS.pdf · uploaded 30 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 MORYA HEIGHTS.pdf · uploaded 30 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 MORYA HEIGHTS.pdf · uploaded 30 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 MORYA HEIGHTS.pdf · uploaded 30 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 MORYA HEIGHTS.pdf · uploaded 30 Jan 2025Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QIV - FY 2022-23 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QI - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q II - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QIII - FY 2023-24 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf · uploaded 6 Feb 2025Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q IV - FY-2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QI - FY 2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q-II FY-2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING 01.pdf · uploaded 6 Feb 2025Source
- 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING.pdf · uploaded 6 Feb 2025Source
- 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QI - FY 2024-25 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf · uploaded 6 Feb 2025Source
- 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QI - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING.pdf · uploaded 6 Feb 2025Source
- 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING.pdf · uploaded 6 Feb 2025Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)06) 20012025 ENGINEERs CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)5) 30092024 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)4) 30062024 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)3) 31032024 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2) 31122023 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)1) 30092023 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- 13 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)06) 31-12-2024 Quality Assurance Certificate.pdf · uploaded 6 Feb 2025Source
- 12 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)06) 31-12-2024 Quality Assurance Certificate.pdf · uploaded 6 Feb 2025Source
- 11 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)05) 30-09-2024 Quality Assurance Certificate.pdf · uploaded 6 Feb 2025Source
- 10 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)04) 30-06-2024 Quality Assurance Certificate.pdf · uploaded 6 Feb 2025Source
- 9 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)03) 31-03-2024 Quality Assurance Certificate.pdf · uploaded 6 Feb 2025Source
- 8 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)02) 31-12-2023 Quality Assurance Certificate.pdf · uploaded 6 Feb 2025Source
- 7 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)01) 30-09-2023 Quality Assurance Certificate.pdf · uploaded 6 Feb 2025Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1) 30092023 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- 4 Copy of Layout Approval (in case of layout)MYSCAN_20250221_0006 - converted.pdf · uploaded 21 Feb 2025Source
- 5 Copy of Layout Approval (in case of layout)MYSCAN_20250221_0007 - converted.pdf · uploaded 21 Feb 2025Source
- 6 Copy of Layout Approval (in case of layout)MYSCAN_20250221_0008 - converted.pdf · uploaded 21 Feb 2025Source
- 7 Copy of Layout Approval (in case of layout)MYSCAN_20250221_0009 - converted.pdf · uploaded 21 Feb 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentMorya Heights R1 R2 CC.pdf · uploaded 21 Feb 2025Source
- 2 Disclosure of sold/ booked inventorySOLD BOOKED DISCLOSURE 2 - converted.pdf · uploaded 25 Feb 2025Source
- Withdrawal Update Form 1Architect Certificate 14th Floor (1) (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Architect Certificate 14th Floor (1) (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Architect Certificate 14th Floor (1) (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Architect Certificate 14th Floor (1) (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Architect Certificate 14th Floor (1) (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 22) Engineer Certificate Q I Fy 2023-24 (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 22) Engineer Certificate Q I Fy 2023-24 (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 22) Engineer Certificate Q I Fy 2023-24 (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 22) Engineer Certificate Q I Fy 2023-24 (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 22) Engineer Certificate Q I Fy 2023-24 (1).pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3CA Certificate MH.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3CA Certificate MH.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3CA Certificate MH.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3CA Certificate MH.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3CA Certificate MH.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1From 1 - Dec 2025.pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 22) Engineer Certificate Q I Fy 2023-24 (1).pdf · uploaded 27 Feb 2026Source
- Withdrawal Update Form 3Form 3 - Dec 2025.pdf · uploaded 27 Feb 2026Source
Technical
- DocumentSale Plan 1 (1).pdf · uploaded 31 Jul 2017Source
- DocumentRevised CC Sale.pdf · uploaded 31 Jul 2017Source
- DocumentPLAN 4 (2).pdf · uploaded 25 Oct 2022Source
- Documentscan0165-compressed.pdf · uploaded 14 Jan 2025Source
- Documentscan0164-compressed.pdf · uploaded 14 Jan 2025Source
- DocumentSP 1.pdf · uploaded 14 Jan 2025Source
- DocumentSP 3.pdf · uploaded 14 Jan 2025Source
- DocumentSP 2.pdf · uploaded 14 Jan 2025Source
- DocumentSP 4.pdf · uploaded 14 Jan 2025Source
- DocumentDOC012.pdf · uploaded 14 Jan 2025Source
- DocumentAmendment in plan.pdf · uploaded 14 Jan 2025Source
- DocumentPart OC Rehab.pdf · uploaded 14 Jan 2025Source
- DocumentMYSCAN_20250221_0006 - converted.pdf · uploaded 21 Feb 2025Source
- DocumentMYSCAN_20250221_0007 - converted.pdf · uploaded 21 Feb 2025Source
- DocumentMYSCAN_20250221_0008 - converted.pdf · uploaded 21 Feb 2025Source
- DocumentMYSCAN_20250221_0009 - converted.pdf · uploaded 21 Feb 2025Source
Technical (Architect)
- Document4 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf · uploaded 20 Dec 2024Source
- DocumentArchitect Certificate 15 March 23.pdf · uploaded 13 Jan 2025Source
- DocumentArchitect Certificate 30 June 23.pdf · uploaded 13 Jan 2025Source
- DocumentArchitect Certificate 25 sept 23.pdf · uploaded 13 Jan 2025Source
- DocumentArchitect Certificate 26 dec 23.pdf · uploaded 13 Jan 2025Source
- DocumentArchitect Certificate 20 march 24.pdf · uploaded 13 Jan 2025Source
- DocumentArchitect Certificate 28 June 24.pdf · uploaded 13 Jan 2025Source
- DocumentArchitect Certificate 30dec 24.pdf · uploaded 13 Jan 2025Source
- DocumentQ-II FY-2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- DocumentQI - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- DocumentQ II - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- DocumentQIII - FY 2023-24 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf · uploaded 29 Jan 2025Source
- DocumentQ IV - FY-2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- DocumentQI - FY 2024-25 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf · uploaded 29 Jan 2025Source
- DocumentQ-II FY-2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- DocumentQIII - FY 2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 29 Jan 2025Source
- DocumentQIV - FY 2022-23 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQI - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQ II - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQIII - FY 2023-24 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQ IV - FY-2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQI - FY 2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQ-II FY-2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQIII - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING 01.pdf · uploaded 6 Feb 2025Source
- DocumentQIII - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQIII - FY 2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQI - FY 2024-25 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQI - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentQIII - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING.pdf · uploaded 6 Feb 2025Source
- DocumentFrom 1 - Dec 2025.pdf · uploaded 25 Feb 2026Source
Technical (Engineer)
- Document6) 30062023 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- Document1) 30092023 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- Document2) 31122023 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- Document3) 31032024 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- Document3) 31032024 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- Document4) 30062024 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- Document5) 30092024 ENGINEER’S CERTIFICATE.pdf · uploaded 13 Jan 2025Source
- Document1) 30092023 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- Document2) 31122023 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- Document3) 31032024 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- Document4) 30062024 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- Document5) 30092024 ENGINEER’S CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- Document06) 20012025 ENGINEERs CERTIFICATE.pdf · uploaded 6 Feb 2025Source
- Document2) Engineer Certificate Q I Fy 2023-24 (1).pdf · uploaded 3 Feb 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsF P No 106
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- Commercial t1, Commercial t2, Commercial t3, Commercial t4, Commercial t5, Commercial t6, Commercial t7, Commercial t8, Flat t1, Flat t2, Flat t3, Flat t4, Flat t5135 units in all
- Address
- F P No 106, GREEN ROAD, HAJURIPIN 400604
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.19451, 72.95912
- Designated bank account
- 171
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- 18m Road
- South
- Fp 105
- East
- 12m Dp Road
- West
- 12m Dp Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking135 units
127 of 135 units booked (94%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Commercial t1 | 9.11 sq m · 98 sq ft | 1 | 1 |
| Commercial t2 | 9.18 sq m · 99 sq ft | 1 | 1 |
| Commercial t3 | 9.37 sq m · 101 sq ft | 1 | 1 |
| Commercial t4 | 9.39 sq m · 101 sq ft | 1 | 1 |
| Commercial t5 | 10.7 sq m · 115 sq ft | 2 | 1 |
| Commercial t6 | 12.04 sq m · 130 sq ft | 2 | 2 |
| Commercial t7 | 15.21 sq m · 164 sq ft | 1 | 0 |
| Commercial t8 | 18.89 sq m · 203 sq ft | 1 | 0 |
Show all 13 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Flat t1 | 28.52 sq m · 307 sq ft | 15 | 13 |
| Flat t2 | 28.62 sq m · 308 sq ft | 14 | 13 |
| Flat t3 | 28.9 sq m · 311 sq ft | 32 | 30 |
| Flat t4 | 31.46 sq m · 339 sq ft | 32 | 32 |
| Flat t5 | 31.77 sq m · 342 sq ft | 32 | 32 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shrushti architectural design consultancy | — |
| Chartered accountant | Y J Padhye & Co | — |
| Engineer | Ajay mahale | — |
Source: MahaRERA project page. Contact details are not shown.