Jvms Accord

Deedo IDDP-THN-683E

Its promised completion date, Mar 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 72% of its units are booked.

Thane (M Corp.), Thane 400607 · Promoter: Jvm Spaces

Delivery1 yr 7 mo past duePromised Mar 2025 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales72% booked308 of 428 units · as the promoter reported to MahaRERA
Jvms Accord project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Its promised completion date, Mar 2025, has passed and MahaRERA does not show it completed

  • This projectRegistered 26 Jun 2021, completion promised 31 Mar 2025, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700029725
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170002972526 Jun 202131 Mar 202531 Mar 2025Jvm SpacesProject page
Documents94

1 document held by Deedo, 93 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardJVM Spaces pan card.pdf · uploaded 9 Jun 2021Source

Legal

  • Legal Title reportdownloa.pdf · uploaded 9 Jun 2021Source
  • Declaration Form BAffidavit Cum Declaration Form B.pdf · uploaded 9 Jun 2021Source
  • Legal Title reportLegal Title report Accord.pdf · uploaded 18 Jan 2022Source
  • Declaration Form BForm B_compressed.pdf · uploaded 21 Apr 2022Source

Migrated

  • 1 PAN CardJVM Spaces pan card.pdf · uploaded 9 Jun 2021Source
  • 1 Copy of the legal title reportdownloa.pdf · uploaded 9 Jun 2021Source
Show all 94 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesTo Whomsoever it may concern.pdf · uploaded 9 Jun 2021Source
  • 1 Copy of Layout Approval (in case of layout)PLAN MERGED - 1 -2.pdf · uploaded 9 Jun 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentPLAN MERGED 3 -4 -5 -6.pdf · uploaded 9 Jun 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentPLAN MERGED 7 -8 -10.pdf · uploaded 9 Jun 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC dated 270421.pdf · uploaded 9 Jun 2021Source
  • 1 Declaration in FORM BAffidavit Cum Declaration Form B.pdf · uploaded 9 Jun 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentDeclaration.pdf · uploaded 11 Jun 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord.pdf · uploaded 11 Jun 2021Source
  • 1 Proforma of Allotment letterRevised _FSA_RERA Balkum Property.pdf · uploaded 11 Jun 2021Source
  • 2 Proforma of Allotment letterRevised_Allotment Letter__Balkum Property.pdf · uploaded 11 Jun 2021Source
  • 2 Copy of Layout Approval (in case of layout)HPSC0095_11zon.pdf · uploaded 4 Jan 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentHPSC0096_11zon.pdf · uploaded 4 Jan 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentHPSC0097_11zon.pdf · uploaded 4 Jan 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentHPSC0098_11zon.pdf · uploaded 4 Jan 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentHPSC0101_11zon.pdf · uploaded 4 Jan 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentHPSC0102_11zon.pdf · uploaded 4 Jan 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentHPSC0103_11zon.pdf · uploaded 4 Jan 2022Source
  • 9 Building Plan Approval / NA Order for plotted developmentHPSC0104_11zon.pdf · uploaded 4 Jan 2022Source
  • 10 Building Plan Approval / NA Order for plotted developmentHPSC0105_11zon.pdf · uploaded 4 Jan 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentCc - JVMS Accord.pdf · uploaded 4 Jan 2022Source
  • 2 Copy of the legal title reportLegal Title report Accord.pdf · uploaded 18 Jan 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 JVMS Accord.pdf · uploaded 14 Feb 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Accord June 2021_compressed.pdf · uploaded 14 Feb 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Accord Sept 2021_compressed.pdf · uploaded 14 Feb 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord June 2021_compressed.pdf · uploaded 14 Feb 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord Sept 2021_compressed.pdf · uploaded 14 Feb 2022Source
  • 1 Declaration about Commencement CertificateFormat D Jvm Accord.pdf · uploaded 9 Mar 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 JVMS_compressed.pdf · uploaded 21 Mar 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Corner Stone Dec 2021.pdf · uploaded 21 Mar 2022Source
  • 1 CERSAI detailsJVMS Accord.pdf · uploaded 21 Mar 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord 31st Dec 2021.pdf · uploaded 21 Mar 2022Source
  • 2 Details of encumbrancesEncumbrance Letter dt.pdf · uploaded 21 Apr 2022Source
  • 2 Declaration in FORM BForm B_compressed.pdf · uploaded 21 Apr 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Accord -31st March 2022_compressed.pdf · uploaded 23 May 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord 31-03-2022_compressed.pdf · uploaded 23 May 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form_1_JVMS_Accord__1_11_Mar_2022 (1).pdf · uploaded 1 Jun 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Accord -30 June 2022.pdf · uploaded 19 Jul 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord 30th June 22_compressed.pdf · uploaded 19 Jul 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate 135.pdf · uploaded 30 Sep 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- JVMS Accord.pdf · uploaded 14 Dec 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Accord as on September 2022.pdf · uploaded 20 Dec 2022Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord 30th September 22.pdf · uploaded 20 Dec 2022Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Accord as on 31-12-2022.pdf · uploaded 22 Jun 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Accord as on 31-03-2023.pdf · uploaded 22 Jun 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- JVMS Accord as on 31-12-2022.pdf · uploaded 22 Jun 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- JVMS Accord as on 31-03-2023.pdf · uploaded 22 Jun 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- JVMS Accord as on 30-06-2023.pdf · uploaded 21 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - JVMS Accord as on 2022-23.pdf · uploaded 30 Sep 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- JVMS Accord as on 30-09-2023.pdf · uploaded 5 Oct 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord as on 30th September 2023.pdf · uploaded 20 Oct 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Accord as on 30-06-2023.pdf · uploaded 26 Oct 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Accord as on 30th September 2023.pdf · uploaded 26 Oct 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - JVM Accord as on Dec 2023.pdf · uploaded 6 Jan 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Accord Dec 23.pdf · uploaded 19 Jan 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord as on 31st December 2023.pdf · uploaded 19 Jan 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)JVM Accord Form -1.pdf · uploaded 3 Apr 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Accord March 2024.pdf · uploaded 20 Apr 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord as on 31st March 2024.pdf · uploaded 20 Apr 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - JVMS Accord as on March 2024.pdf · uploaded 24 Apr 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellJVMS Accord Rera Declaration.pdf · uploaded 27 Jun 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - JVMS Accord as on June 2024.pdf · uploaded 10 Jul 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Accord June 2024.pdf · uploaded 19 Jul 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord as on 30th June 2024_compressed.pdf · uploaded 19 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord as on 30th September 2024.pdf · uploaded 20 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Accord as on Sep 2024.pdf · uploaded 20 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryCircular 29 JVM Accord as on Sep 2024_11zon.pdf · uploaded 2 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Accord as on 31-12-2024.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Accord as on 31-12-2024.pdf · uploaded 20 Jan 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentJVM ACcord Full OC.pdf · uploaded 24 Feb 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for plotted development (65).pdf · uploaded 15 Mar 2025Source

Technical

  • DocumentPLAN MERGED - 1 -2.pdf · uploaded 9 Jun 2021Source
  • DocumentPLAN MERGED 3 -4 -5 -6.pdf · uploaded 9 Jun 2021Source
  • DocumentPLAN MERGED 7 -8 -10.pdf · uploaded 9 Jun 2021Source
  • DocumentHPSC0095_11zon.pdf · uploaded 4 Jan 2022Source
  • DocumentHPSC0096_11zon.pdf · uploaded 4 Jan 2022Source
  • DocumentHPSC0097_11zon.pdf · uploaded 4 Jan 2022Source
  • DocumentHPSC0098_11zon.pdf · uploaded 4 Jan 2022Source
  • DocumentHPSC0101_11zon.pdf · uploaded 4 Jan 2022Source
  • DocumentHPSC0102_11zon.pdf · uploaded 4 Jan 2022Source
  • DocumentHPSC0103_11zon.pdf · uploaded 4 Jan 2022Source
  • DocumentHPSC0104_11zon.pdf · uploaded 4 Jan 2022Source
  • DocumentHPSC0105_11zon.pdf · uploaded 4 Jan 2022Source

Technical (Architect)

  • DocumentForm 1 - JVMS Accord as on June 2024.pdf · uploaded 10 Jul 2024Source

Technical (Engineer)

  • DocumentForm 2 - JVMS Accord June 2024.pdf · uploaded 19 Jul 2024Source
  • DocumentForm 2 - JVMS Accord as on Sep 2024.pdf · uploaded 20 Oct 2024Source
  • DocumentForm 2 - JVMS Accord as on 31-12-2024.pdf · uploaded 20 Jan 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsNew Survey No 13, Old Survey No 150

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, Landowner Units, Shop, 1RK428 units in all
Address
New Survey No -13 and Old Survey No - 150, Dhokali, Thane WestPIN 400607
Village
Thane (M Corp.), Thane taluka
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

New Survey No 13Old Survey No 150

Boundaries

North
Survey No -14
South
Survey No -14
East
Survey No -14
West
Survey No -14

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking428 units

308 of 428 units booked (72%), as the promoter reported to MahaRERA

1BHK · 351 unitsLandowner Units · 52 unitsShop · 24 units1RK · 1 unit
BuildingTypeCarpet areaUnitsBooked
Building -A1BHK26.35 sq m · 284 sq ft10
Building -A1BHK26.56 sq m · 286 sq ft1916
Building -A1BHK26.61 sq m · 286 sq ft70
Building -A1BHK26.64 sq m · 287 sq ft1313
Building -A1BHK26.68 sq m · 287 sq ft1111
Building -A1BHK26.72 sq m · 288 sq ft10896
Building -A1BHK26.98 sq m · 290 sq ft22
Building -A1BHK27.09 sq m · 292 sq ft3534
Show all 46 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building -ALandowner Units26.48 sq m · 285 sq ft10
Building -ALandowner Units26.61 sq m · 286 sq ft10
Building -ALandowner Units26.64 sq m · 287 sq ft60
Building -ALandowner Units26.72 sq m · 288 sq ft440
Building -AShop10.68 sq m · 115 sq ft10
Building -AShop15.4 sq m · 166 sq ft10
Building -AShop17.69 sq m · 190 sq ft10
Building -AShop17.76 sq m · 191 sq ft21
Building -AShop22.32 sq m · 240 sq ft11
Building -AShop24.54 sq m · 264 sq ft11
Building -AShop28.02 sq m · 302 sq ft10
Building -AShop28.27 sq m · 304 sq ft33
Building -AShop37.67 sq m · 405 sq ft11
Building -B1BHK24.99 sq m · 269 sq ft10
Building -B1BHK25.03 sq m · 269 sq ft10
Building -B1BHK25.23 sq m · 272 sq ft2114
Building -B1BHK26.08 sq m · 281 sq ft11
Building -B1BHK26.58 sq m · 286 sq ft10
Building -B1BHK26.71 sq m · 288 sq ft2015
Building -B1BHK26.72 sq m · 288 sq ft3526
Building -B1BHK26.89 sq m · 289 sq ft2019
Building -B1BHK27.01 sq m · 291 sq ft1717
Building -B1BHK27.09 sq m · 292 sq ft1717
Building -B1BHK32.02 sq m · 345 sq ft10
Building -B1BHK32.46 sq m · 349 sq ft2017
Building -B1RK22.61 sq m · 243 sq ft11
Building -BShop9.16 sq m · 99 sq ft11
Building -BShop12.56 sq m · 135 sq ft10
Building -BShop12.8 sq m · 138 sq ft10
Building -BShop13.17 sq m · 142 sq ft10
Building -BShop13.4 sq m · 144 sq ft10
Building -BShop15.26 sq m · 164 sq ft10
Building -BShop20.69 sq m · 223 sq ft10
Building -BShop21.26 sq m · 229 sq ft10
Building -BShop22.87 sq m · 246 sq ft10
Building -BShop24.96 sq m · 269 sq ft10
Building -BShop25.08 sq m · 270 sq ft11
Building -BShop29.14 sq m · 314 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology