Completion was pushed back 3 years and 8 months to Dec 2022, and that date has passed too; no MahaRERA orders on record; 34% of its units are booked.
Thane (M Corp.), Thane 400607 · Promoter: Jangid Contructions
Completion was pushed back 3 years and 8 months to Dec 2022, and that date has passed too
- P51700004127Registered 8 Aug 2017, completion promised 31 Dec 2018, revised to 30 Oct 2020, and still not shown completed today.
- P51700004749Registered 9 Aug 2017, completion promised 30 Apr 2019, revised to 31 Dec 2022, and still not shown completed today.
- P51700011991Registered 1 Sep 2017, completion promised 31 Dec 2019, revised to 30 Dec 2021, and still not shown completed today.
3 extension certificates on record.
3 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations3
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700004127 | 8 Aug 2017 | 31 Dec 2018 | 30 Oct 2020 | Jangid Contructions | Project page |
| P51700004749 | 9 Aug 2017 | 30 Apr 2019 | 31 Dec 2022 | Jangid Contructions | Project page |
| P51700011991 | 1 Sep 2017 | 31 Dec 2019 | 30 Dec 2021 | Jangid Contructions | Project page |
Documents76
6 documents held by Deedo, 70 filings listed on MahaRERA's project page
Registration certificate (3)
Extension certificate (3)
Show all 76 documentsShow fewer documents
Legal
- Legal Title reportP51700004127 · Title Cert Galaxy.pdf · uploaded 30 Jul 2017Source
- Declaration Form BP51700004127 · Form B tower 3.pdf · uploaded 30 Jul 2017Source
- Legal Title reportP51700004749 · Title Cert Galaxy.pdf · uploaded 30 Jul 2017Source
- Declaration Form BP51700004749 · Form B Tower 2.pdf · uploaded 30 Jul 2017Source
Migrated
- 1 PAN CardP51700004127 · Pan Card_Galaxy.pdf · uploaded 30 Jul 2017Source
- 1 Copy of the legal title reportP51700004127 · Title Cert Galaxy.pdf · uploaded 30 Jul 2017Source
- 1 Details of encumbrancesP51700004127 · Galaxy Litigation.pdf · uploaded 30 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P51700004127 · Galaxy Tower 2 layout .pdf · uploaded 30 Jul 2017Source
- 1 Building Plan Approval (IOD)P51700004127 · Galaxy CC.pdf · uploaded 30 Jul 2017Source
- 1 Declaration in FORM BP51700004127 · Form B tower 3.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700004127 · Arctitect certi Form 1.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700004127 · Engg Cert Tower 3 Form 2.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of CA (Form 3)P51700004127 · JC Tower 3 CA.pdf · uploaded 30 Jul 2017Source
- 1 Proforma of Allotment letterP51700004127 · JC 3 Agree and allot.pdf · uploaded 30 Jul 2017Source
- 1 PAN CardP51700004749 · Pan Card_Galaxy.pdf · uploaded 30 Jul 2017Source
- 1 Copy of the legal title reportP51700004749 · Title Cert Galaxy.pdf · uploaded 30 Jul 2017Source
- 1 Details of encumbrancesP51700004749 · Galaxy Litigation.pdf · uploaded 30 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P51700004749 · Galaxy Tower 2 layout .pdf · uploaded 30 Jul 2017Source
- 1 Building Plan Approval (IOD)P51700004749 · Galaxy CC.pdf · uploaded 30 Jul 2017Source
- 1 Declaration in FORM BP51700004749 · Form B Tower 2.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700004749 · Arch Cert Tower 3 Form 1.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700004749 · Engineer Cert Form 2.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of CA (Form 3)P51700004749 · JC Tower 2 Ca.pdf · uploaded 30 Jul 2017Source
- 1 Proforma of Allotment letterP51700004749 · Galaxy Tower 2 Agree Allot.pdf · uploaded 30 Jul 2017Source
- 2 Proforma of Allotment letterP51700004127 · Jangid Agreement.pdf · uploaded 11 Oct 2017Source
- 3 Proforma of Allotment letterP51700004127 · Jangid Allotment Letter.pdf · uploaded 11 Oct 2017Source
- 2 Proforma of Allotment letterP51700004749 · Jangid Agreement.pdf · uploaded 11 Oct 2017Source
- 3 Proforma of Allotment letterP51700004749 · Jangid Allotment Letter.pdf · uploaded 11 Oct 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700004127 · Galaxy CC march 18.PDF · uploaded 30 Mar 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700004749 · Galaxy CC march 18.PDF · uploaded 30 Mar 2018Source
- 1 Certificates of CA (Form 5)P51700004127 · Certificate.pdf · uploaded 15 Mar 2019Source
- 1 Certificates of CA (Form 5)P51700004749 · Certificate JC- Tower 2.pdf · uploaded 6 May 2019Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700004127 · Original OC - Jangid Galaxy 13-3-2021.pdf · uploaded 14 Apr 2021Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P51700004127 · Form 4 -Architect Certificate - Jangid Galaxy Tower 3.pdf · uploaded 14 Sep 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51700004127 · JC- TOWER 3- Form 2A Jun 19.pdf · uploaded 9 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51700004127 · JC- TOWER 3- Form 2A Sep 19.pdf · uploaded 9 Oct 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51700004127 · JC- TOWER 3- Form 2A Dec 19.pdf · uploaded 9 Oct 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51700004127 · JC- TOWER 3- Form 2A Mar 20.pdf · uploaded 9 Oct 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700004127 · JC- TOWER 3- Form 2A Jun 20.pdf · uploaded 9 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700004127 · JC- TOWER 3- Form 2A Sep 20.pdf · uploaded 9 Oct 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700004127 · JC- TOWER 3- Form 2A Dec 20.pdf · uploaded 9 Oct 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700004127 · JC- TOWER 3- Form 2A Mar 21.pdf · uploaded 9 Oct 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51700004749 · JC- TOWER 2- From 2A Jun 19.pdf · uploaded 9 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51700004749 · JC- TOWER 2- From 2A Sep 19.pdf · uploaded 9 Oct 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51700004749 · JC- TOWER 2- From 2A Dec 19.pdf · uploaded 9 Oct 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51700004749 · JC- TOWER 2- From 2A Mar 20.pdf · uploaded 9 Oct 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700004749 · JC- TOWER 2- From 2A Jun 20.pdf · uploaded 9 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700004749 · JC- TOWER 2- From 2A Sep 20.pdf · uploaded 9 Oct 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700004749 · JC- TOWER 2- From 2A Dec 20.pdf · uploaded 9 Oct 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700004749 · JC- TOWER 2- From 2A Mar 21.pdf · uploaded 9 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51700004127 · TOWER 3-18-19.pdf · uploaded 8 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P51700004127 · TOWER 3-19-20.pdf · uploaded 8 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51700004127 · TOWER 3-21-22.pdf · uploaded 8 Apr 2023Source
- 2 Certificates of CA (Form 5)P51700004749 · Tower 2 Jangid Construction 17-18.pdf · uploaded 8 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51700004749 · Tower 2 Jangid Construction 18-19.pdf · uploaded 8 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P51700004749 · Tower 2 Jangid Construction 19-20.pdf · uploaded 8 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51700004749 · Tower 2 Jangid Construction 20-21.pdf · uploaded 8 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51700004749 · Tower 2 Jangid Construction 21-22.pdf · uploaded 8 Apr 2023Source
- 2 Certificates of CA (Form 5)P51700004127 · JC-Form-5 17-18_compressed.pdf · uploaded 21 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51700004127 · JC-Form-5 -20-21_compressed.pdf · uploaded 21 Apr 2023Source
Technical
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals199/7
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 3
- Unit types
- 2 BHK, 2 BHK Type, 2 BHK Type 2, 3 BHK124 units in all
- Address
- 199/7PIN 400607
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.25771, 72.97188
- Designated bank account
- 85
- Developed in phases
- No
- Also registered as
- Jangid Galaxy Tower 3, Jangid Galaxy Tower 2, Jangid Galaxy Tower 1
Survey, CTS, gat or plot numbers
Boundaries
- North
- Survey 194
- South
- Godbunder Road
- East
- Road
- West
- Survey 198
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking124 units
42 of 124 units booked (34%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700004749 | Galaxy Tower 2 | 2 BHK | 64.19 sq m · 691 sq ft | 2 | 1 |
| P51700004749 | Galaxy Tower 2 | 2 BHK | 64.7 sq m · 696 sq ft | 1 | 1 |
| P51700004749 | Galaxy Tower 2 | 2 BHK | 64.77 sq m · 697 sq ft | 1 | 0 |
| P51700004749 | Galaxy Tower 2 | 2 BHK | 64.98 sq m · 699 sq ft | 3 | 0 |
| P51700004749 | Galaxy Tower 2 | 2 BHK | 65.67 sq m · 707 sq ft | 1 | 1 |
| P51700004749 | Galaxy Tower 2 | 2 BHK | 69.33 sq m · 746 sq ft | 4 | 3 |
| P51700004749 | Galaxy Tower 2 | 2 BHK | 69.83 sq m · 752 sq ft | 4 | 1 |
| P51700004749 | Galaxy Tower 2 | 2 BHK | 69.88 sq m · 752 sq ft | 3 | 2 |
Show all 48 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700004749 | Galaxy Tower 2 | 2 BHK Type | 66.1 sq m · 711 sq ft | 1 | 0 |
| P51700004749 | Galaxy Tower 2 | 2 BHK Type | 69.33 sq m · 746 sq ft | 3 | 3 |
| P51700004749 | Galaxy Tower 2 | 2 BHK Type | 70.95 sq m · 764 sq ft | 1 | 0 |
| P51700004749 | Galaxy Tower 2 | 2 BHK Type 2 | 64.98 sq m · 699 sq ft | 3 | 0 |
| P51700004749 | Galaxy Tower 2 | 2 BHK Type 2 | 65.09 sq m · 701 sq ft | 4 | 0 |
| P51700004749 | Galaxy Tower 2 | 2 BHK Type 2 | 69.83 sq m · 752 sq ft | 3 | 1 |
| P51700004749 | Galaxy Tower 2 | 2 BHK Type 2 | 69.88 sq m · 752 sq ft | 3 | 3 |
| P51700004749 | Galaxy Tower 2 | 2 BHK Type 2 | 70.45 sq m · 758 sq ft | 1 | 0 |
| P51700004749 | Galaxy Tower 2 | 2 BHK Type 2 | 71 sq m · 764 sq ft | 1 | 1 |
| P51700004749 | Galaxy Tower 2 | 3 BHK | 70.09 sq m · 754 sq ft | 1 | 0 |
| P51700004749 | Galaxy Tower 2 | 3 BHK | 75.43 sq m · 812 sq ft | 1 | 0 |
| P51700004749 | Galaxy Tower 2 | 3 BHK | 75.68 sq m · 815 sq ft | 5 | 0 |
| P51700004749 | Galaxy Tower 2 | 3 BHK | 76.3 sq m · 821 sq ft | 5 | 2 |
| P51700004749 | Galaxy Tower 2 | 3 BHK | 79.59 sq m · 857 sq ft | 1 | 0 |
| P51700004749 | Galaxy Tower 2 | 3 BHK | 79.96 sq m · 861 sq ft | 5 | 0 |
| P51700004749 | Galaxy Tower 2 | 3 BHK | 80.47 sq m · 866 sq ft | 5 | 0 |
| P51700004127 | Galaxy Tower 3 | 2 BHK | 64.19 sq m · 691 sq ft | 2 | 1 |
| P51700004127 | Galaxy Tower 3 | 2 BHK | 64.7 sq m · 696 sq ft | 1 | 1 |
| P51700004127 | Galaxy Tower 3 | 2 BHK | 64.77 sq m · 697 sq ft | 1 | 0 |
| P51700004127 | Galaxy Tower 3 | 2 BHK | 64.98 sq m · 699 sq ft | 3 | 0 |
| P51700004127 | Galaxy Tower 3 | 2 BHK | 65.67 sq m · 707 sq ft | 1 | 1 |
| P51700004127 | Galaxy Tower 3 | 2 BHK | 69.33 sq m · 746 sq ft | 4 | 2 |
| P51700004127 | Galaxy Tower 3 | 2 BHK | 69.83 sq m · 752 sq ft | 4 | 0 |
| P51700004127 | Galaxy Tower 3 | 2 BHK | 69.88 sq m · 752 sq ft | 3 | 2 |
| P51700004127 | Galaxy Tower 3 | 2 BHK Type 2 | 64.98 sq m · 699 sq ft | 3 | 1 |
| P51700004127 | Galaxy Tower 3 | 2 BHK Type 2 | 65.09 sq m · 701 sq ft | 4 | 1 |
| P51700004127 | Galaxy Tower 3 | 2 BHK Type 2 | 66.1 sq m · 711 sq ft | 1 | 0 |
| P51700004127 | Galaxy Tower 3 | 2 BHK Type 2 | 69.33 sq m · 746 sq ft | 3 | 2 |
| P51700004127 | Galaxy Tower 3 | 2 BHK Type 2 | 69.83 sq m · 752 sq ft | 3 | 2 |
| P51700004127 | Galaxy Tower 3 | 2 BHK Type 2 | 69.88 sq m · 752 sq ft | 3 | 2 |
| P51700004127 | Galaxy Tower 3 | 2 BHK Type 2 | 70.45 sq m · 758 sq ft | 1 | 0 |
| P51700004127 | Galaxy Tower 3 | 2 BHK Type 2 | 70.95 sq m · 764 sq ft | 1 | 0 |
| P51700004127 | Galaxy Tower 3 | 2 BHK Type 2 | 71 sq m · 764 sq ft | 1 | 1 |
| P51700004127 | Galaxy Tower 3 | 3 BHK | 70.09 sq m · 754 sq ft | 1 | 0 |
| P51700004127 | Galaxy Tower 3 | 3 BHK | 75.43 sq m · 812 sq ft | 1 | 1 |
| P51700004127 | Galaxy Tower 3 | 3 BHK | 75.68 sq m · 815 sq ft | 5 | 0 |
| P51700004127 | Galaxy Tower 3 | 3 BHK | 76.3 sq m · 821 sq ft | 5 | 5 |
| P51700004127 | Galaxy Tower 3 | 3 BHK | 79.59 sq m · 857 sq ft | 1 | 0 |
| P51700004127 | Galaxy Tower 3 | 3 BHK | 79.96 sq m · 861 sq ft | 5 | 1 |
| P51700004127 | Galaxy Tower 3 | 3 BHK | 80.47 sq m · 866 sq ft | 5 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals10
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Vinay Patil | — | P51700004127 |
| Architect | Vinay Patil | — | P51700004749 |
| Engineer | Dilip Sanghvi | — | P51700004749 |
| Engineer | Dilip Sanghvi | — | P51700004127 |
| Other | Green Paradise | — | P51700004127 |
| Other | Ms Noesis Consultant | — | P51700004749 |
| Other | Ms Noesis Consultant | — | P51700004127 |
| Other | Paradise Green | — | P51700004749 |
| Registered real estate agent | Indiabulls Brokerage Limited | — | P51700004749 |
| Registered real estate agent | Indiabulls Brokerage Limited | — | P51700004127 |
Source: MahaRERA project page. Contact details are not shown.