Others · 1 building · 153 unitsRERA P51700012247

Hg- A1

Completion was pushed back 5 years, to Dec 2029; no MahaRERA orders on record; 1% of its units are booked.

Thane (M Corp.), Thane 400608 · Promoter: Siddhi Real Estate Developers

DeliveryExtended 5 yrsPromised Dec 2024 · now due Dec 2029RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales1% booked2 of 153 units · as the promoter reported to MahaRERA
Hg- A1 project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 5 years, to Dec 2029

  • This projectRegistered 1 Sep 2017, completion promised 30 Dec 2024, revised to 31 Dec 2029.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700012247
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000122471 Sep 201730 Dec 202431 Dec 2029Siddhi Real Estate DevelopersProject page
Documents181

2 documents held by Deedo, 179 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardPAN CARD- SRED.pdf · uploaded 29 Jul 2017Source

Legal

  • Legal Title reportTitle Certificate HG A1 (2)07302017155603.pdf · uploaded 30 Jul 2017Source
  • Legal Title reportTitle Certificate HG A1 (1)07302017155804.pdf · uploaded 30 Jul 2017Source
  • Legal Title reportTC HG A1.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BDeclaration - Form B- Hg Garden A1.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BForm B and Declaration Aff (1).pdf · uploaded 27 Feb 2025Source
Show all 181 documentsShow fewer documents

Migrated

  • 1 PAN CardPAN CARD- SRED.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of the legal title reportTitle Certificate HG A1 (2)07302017155603.pdf · uploaded 30 Jul 2017Source
  • 2 Copy of the legal title reportTitle Certificate HG A1 (1)07302017155804.pdf · uploaded 30 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC HG A1.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of CA (Form 3)FORM 3 CA CERTIFICATE A1.pdf · uploaded 30 Jul 2017Source
  • 1 Proforma of Allotment letterAllotment Letter - RERA.pdf · uploaded 30 Jul 2017Source
  • 3 Copy of the legal title reportTC HG A1.pdf · uploaded 31 Jul 2017Source
  • 1 Details of encumbrancesEncumberances_HG-A1_07312017195925.pdf · uploaded 31 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)A1- Layout plan.pdf · uploaded 31 Jul 2017Source
  • 1 Building Plan Approval (IOD)A1-Bldg plan-2.pdf · uploaded 31 Jul 2017Source
  • 2 Building Plan Approval (IOD)A1- Bldg plan-1.pdf · uploaded 31 Jul 2017Source
  • 3 Building Plan Approval (IOD)A1-Bldg plan-3.pdf · uploaded 31 Jul 2017Source
  • 1 Declaration in FORM BDeclaration - Form B- Hg Garden A1.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERT - A 1.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer_Certificate_-A1.pdf · uploaded 31 Jul 2017Source
  • 2 Proforma of Allotment letterHG_GARDEN_7-12_1 to 26.pdf · uploaded 31 Jul 2017Source
  • 3 Proforma of Allotment letterHG_GARDEN_7-12_27 to 52.pdf · uploaded 31 Jul 2017Source
  • 4 Proforma of Allotment letterANNEXURE - A F H.pdf · uploaded 31 Jul 2017Source
  • 5 Proforma of Allotment letterDraft - HG - A-1 Agreement For Sale.pdf · uploaded 31 Jul 2017Source
  • 6 Proforma of Allotment letterNA ORDER-1.pdf · uploaded 31 Jul 2017Source
  • 7 Proforma of Allotment letterNA ORDER-2.pdf · uploaded 31 Jul 2017Source
  • 8 Proforma of Allotment letter7-12 Extract 87 2-1 A07312017204832.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of CA (Form 5)Rera Form 5 H Garden A1 Wing.pdf · uploaded 3 Jan 2019Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA_A1_DEC_2019compressed (1).pdf · uploaded 2 Nov 2022Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA_A1_MARCH_20_compressed (1).pdf · uploaded 2 Nov 2022Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA_A1_SEP_20_compressed (1).pdf · uploaded 2 Nov 2022Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA_A1_DEC 2021.pdf · uploaded 2 Nov 2022Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA_A1_MARCH_21_compressed (1).pdf · uploaded 2 Nov 2022Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA_A1_JUNE_21_compressed (1).pdf · uploaded 2 Nov 2022Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA_A1_MARCH_22_compressed (1).pdf · uploaded 2 Nov 2022Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA_A1_JUNE_22_compressed (1).pdf · uploaded 2 Nov 2022Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA_A1_SEP_22_compressed (1).pdf · uploaded 2 Nov 2022Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA_A1_JUNE_20_compressed (1).pdf · uploaded 2 Nov 2022Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A.pdf · uploaded 22 Oct 2024Source
  • 1 Declaration about Commencement CertificateFORMAT - D.pdf · uploaded 23 Oct 2024Source
  • 1 CERSAI detailsCERSAI Search Report.pdf · uploaded 23 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentHG - A1 - Amended CC Certificate_1.pdf · uploaded 31 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryFormat B - Resolution - Consent for Extension.pdf · uploaded 31 Oct 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)FORMAT - B HG- A1 bank.pdf · uploaded 31 Oct 2024Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Q2-24.pdf · uploaded 14 Nov 2024Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Q1-24.pdf · uploaded 14 Nov 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Q4-23.pdf · uploaded 14 Nov 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Q3-23.pdf · uploaded 14 Nov 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Q2-23.pdf · uploaded 14 Nov 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Q1-23.pdf · uploaded 14 Nov 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Q4-22.pdf · uploaded 14 Nov 2024Source
  • 2 Copy of Layout Approval (in case of layout)HG-A1-37788-2.pdf · uploaded 15 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)HG-A1-37788-1.pdf · uploaded 15 Nov 2024Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Q3-24.pdf · uploaded 15 Nov 2024Source
  • 10 Certificates of CA (Form 3)Form 3 Q2- 23.pdf · uploaded 15 Nov 2024Source
  • 11 Certificates of CA (Form 3)Form 3 Q3-23.pdf · uploaded 15 Nov 2024Source
  • 12 Certificates of CA (Form 3)Form 3 Q4- 23.pdf · uploaded 15 Nov 2024Source
  • 13 Certificates of CA (Form 3)Form 3 Q1-24.pdf · uploaded 15 Nov 2024Source
  • 14 Certificates of CA (Form 3)Form 3 Q2-24.pdf · uploaded 15 Nov 2024Source
  • 9 Certificates of CA (Form 3)Form 3 Q1-23.pdf · uploaded 15 Nov 2024Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Q2 24.pdf · uploaded 15 Nov 2024Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Q1 24.pdf · uploaded 15 Nov 2024Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Q4 23.pdf · uploaded 15 Nov 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Q3 23.pdf · uploaded 15 Nov 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Q2 23.pdf · uploaded 15 Nov 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Q1 23.pdf · uploaded 15 Nov 2024Source
  • 4 Building Plan Approval (IOD)HG-A1-37788-4.pdf · uploaded 15 Nov 2024Source
  • 3 Building Plan Approval (IOD)HG-A1-37788-3.pdf · uploaded 15 Nov 2024Source
  • 1 Building Plan Approval (IOD)HG-A1-37788-1.pdf · uploaded 15 Nov 2024Source
  • 2 Building Plan Approval (IOD)HG-A1-37788-5.pdf · uploaded 15 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 19-20.pdf · uploaded 15 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)From 2A 20-21.pdf · uploaded 15 Nov 2024Source
  • 2 Disclosure of sold/ booked inventoryDiscl of sold inventory.pdf · uploaded 15 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 21-22.pdf · uploaded 15 Nov 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDiscl of interest in org.pdf · uploaded 15 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 22-23.pdf · uploaded 15 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 23-24.pdf · uploaded 15 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 2018-19.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 2019-20.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 2020-21.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 2021-22.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 2022-23.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 2023-24.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 2018-19.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 2019-20.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 2020-21.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 2021-22.pdf · uploaded 21 Nov 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 2022-23.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 2023-24.pdf · uploaded 21 Nov 2024Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1-2023-Q3.pdf · uploaded 18 Dec 2024Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 3 - Q2 24.pdf · uploaded 18 Dec 2024Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1-2024-Q3.pdf · uploaded 18 Dec 2024Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1-2024-Q2.pdf · uploaded 18 Dec 2024Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1-2024-Q1.pdf · uploaded 18 Dec 2024Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1-2023-Q4.pdf · uploaded 18 Dec 2024Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1-2023-Q2.pdf · uploaded 18 Dec 2024Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1-2023-Q1.pdf · uploaded 18 Dec 2024Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 -2022-Q4.pdf · uploaded 18 Dec 2024Source
  • 16 Certificates of CA (Form 3)Form 3 - Q3 23.pdf · uploaded 18 Dec 2024Source
  • 17 Certificates of CA (Form 3)Form 3 - Q4 23.pdf · uploaded 18 Dec 2024Source
  • 18 Certificates of CA (Form 3)Form 3 - Q1 24.pdf · uploaded 18 Dec 2024Source
  • 15 Certificates of CA (Form 3)Form 3 - Q4 2017.pdf · uploaded 18 Dec 2024Source
  • 7 Certificates of CA (Form 3)Form 3- Q2 24.pdf · uploaded 3 Jan 2025Source
  • 6 Certificates of CA (Form 3)Form 3- Q1 24.pdf · uploaded 3 Jan 2025Source
  • 5 Certificates of CA (Form 3)Form 3- Q4 23.pdf · uploaded 3 Jan 2025Source
  • 4 Certificates of CA (Form 3)Form 3- Q3 23.pdf · uploaded 3 Jan 2025Source
  • 3 Certificates of CA (Form 3)Form 3- Q2 23.pdf · uploaded 3 Jan 2025Source
  • 2 Certificates of CA (Form 3)Form 3- Q1 23.pdf · uploaded 3 Jan 2025Source
  • 1 Certificates of CA (Form 3)Form 3 - Q1 18.pdf · uploaded 3 Jan 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)HG - A1 - Architect certificate - Q3 (1).pdf · uploaded 21 Jan 2025Source
  • 8 Certificates of CA (Form 3)Form 3 Q3 2024.pdf · uploaded 21 Jan 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)HG - A1- Form 2 - Q3 (1).pdf · uploaded 21 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 2023-24.pdf · uploaded 21 Jan 2025Source
  • 1 Declaration in FORM BForm B and Declaration Aff (1).pdf · uploaded 27 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorysold inventory.pdf · uploaded 27 Feb 2025Source
  • 1 Disclosure of Interest in Other Real Estate Organizationsdiscl of int in othr orgs.pdf · uploaded 27 Feb 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1- 2024-Q4.pdf · uploaded 16 May 2025Source
  • Form 1Form 1 - 2025 Q3.pdf · uploaded 5 Mar 2026Source
  • Form 2Form 2 - 2025 Q3.pdf · uploaded 5 Mar 2026Source
  • Form 3Form 3 - 2025 Q3.pdf · uploaded 5 Mar 2026Source
  • Disclosure of Sold and Booked InventoryIDS_HG_A1_2025-26_ Q3.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 1Form 1 - 2025 Q1.pdf · uploaded 17 Mar 2026Source
  • Withdrawal Update Form 1Form 1 - 2025 Q2.pdf · uploaded 17 Mar 2026Source
  • Withdrawal Update Form 1HG_A1 - Form 1 - 2025 Q3.pdf · uploaded 17 Mar 2026Source
  • Withdrawal Update Form 2Form 2 - 2025 Q1.pdf · uploaded 17 Mar 2026Source
  • Withdrawal Update Form 2Form 2 - 2025 Q2.pdf · uploaded 17 Mar 2026Source
  • Withdrawal Update Form 2HG_A1 - Form 2 - 2025 Q3.pdf · uploaded 17 Mar 2026Source
  • Withdrawal Update Form 3Form 3 - 2025 Q1.pdf · uploaded 17 Mar 2026Source
  • Withdrawal Update Form 3Form 3 - 2025 Q2.pdf · uploaded 17 Mar 2026Source
  • Withdrawal Update Form 3HG_A1 - Form 3 - 2025 Q3.pdf · uploaded 17 Mar 2026Source
  • Withdrawal Update Form 1Form-1_HG_A1_Q4_2025-26.pdf · uploaded 22 Apr 2026Source
  • Withdrawal Update Form 2Form-2_HG_A1_Q4_2025-26.pdf · uploaded 22 Apr 2026Source
  • Withdrawal Update Form 3Form-3_HG_A1_Q4_2025-26.pdf · uploaded 22 Apr 2026Source
  • Withdrawal Update Form 1Form-1_HG_A1_Q4_2025-26.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 1Form 1_ HG_ A1_Q1_2026-27_Signed1.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 2Form-2_HG_A1_Q4_2025-26.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 2Form 2_ HG_ A1_Q1_2026-27_Signed1.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 3Form-3_HG_A1_Q4_2025-26.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 3Form 3_ HG_ A1_Q1_2026-27_Signed1.pdf · uploaded 14 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A_Annual_ HG_A1_2025-26.pdf · uploaded 18 Jul 2026Source

Technical

  • DocumentA1- Layout plan.pdf · uploaded 31 Jul 2017Source
  • DocumentA1-Bldg plan-2.pdf · uploaded 31 Jul 2017Source
  • DocumentA1-Bldg plan-3.pdf · uploaded 31 Jul 2017Source
  • DocumentA1- Bldg plan-1.pdf · uploaded 31 Jul 2017Source
  • DocumentHG-A1-37788-1.pdf · uploaded 15 Nov 2024Source
  • DocumentHG-A1-37788-2.pdf · uploaded 15 Nov 2024Source
  • DocumentHG-A1-37788-1.pdf · uploaded 15 Nov 2024Source
  • DocumentHG-A1-37788-5.pdf · uploaded 15 Nov 2024Source
  • DocumentHG-A1-37788-3.pdf · uploaded 15 Nov 2024Source
  • DocumentHG-A1-37788-4.pdf · uploaded 15 Nov 2024Source

Technical (Architect)

  • DocumentForm 1 Q4-22.pdf · uploaded 14 Nov 2024Source
  • DocumentForm 1 Q1-23.pdf · uploaded 14 Nov 2024Source
  • DocumentForm 1 Q2-23.pdf · uploaded 14 Nov 2024Source
  • DocumentForm 1 Q3-23.pdf · uploaded 14 Nov 2024Source
  • DocumentForm 1 Q4-23.pdf · uploaded 14 Nov 2024Source
  • DocumentForm 1 Q1-24.pdf · uploaded 14 Nov 2024Source
  • DocumentForm 1 Q2-24.pdf · uploaded 14 Nov 2024Source
  • DocumentForm 1 Q3-24.pdf · uploaded 15 Nov 2024Source
  • DocumentForm 1 -2022-Q4.pdf · uploaded 18 Dec 2024Source
  • DocumentForm1-2023-Q1.pdf · uploaded 18 Dec 2024Source
  • DocumentForm1-2023-Q2.pdf · uploaded 18 Dec 2024Source
  • DocumentForm1-2023-Q3.pdf · uploaded 18 Dec 2024Source
  • DocumentForm1-2023-Q4.pdf · uploaded 18 Dec 2024Source
  • DocumentForm1-2024-Q1.pdf · uploaded 18 Dec 2024Source
  • DocumentForm1-2024-Q2.pdf · uploaded 18 Dec 2024Source
  • DocumentForm1-2024-Q3.pdf · uploaded 18 Dec 2024Source
  • DocumentForm 3 - Q2 24.pdf · uploaded 18 Dec 2024Source
  • DocumentHG - A1 - Architect certificate - Q3 (1).pdf · uploaded 21 Jan 2025Source
  • DocumentForm1- 2024-Q4.pdf · uploaded 16 May 2025Source
  • DocumentForm 1_ HG_ A1_Q1_2026-27_Signed1.pdf · uploaded 14 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 - Q1 23.pdf · uploaded 15 Nov 2024Source
  • DocumentForm 2 - Q2 23.pdf · uploaded 15 Nov 2024Source
  • DocumentForm 2 - Q3 23.pdf · uploaded 15 Nov 2024Source
  • DocumentForm 2 - Q4 23.pdf · uploaded 15 Nov 2024Source
  • DocumentForm 2 - Q1 24.pdf · uploaded 15 Nov 2024Source
  • DocumentForm 2 - Q2 24.pdf · uploaded 15 Nov 2024Source
  • DocumentHG - A1- Form 2 - Q3 (1).pdf · uploaded 21 Jan 2025Source
  • DocumentForm 2_ HG_ A1_Q1_2026-27_Signed1.pdf · uploaded 14 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals66/24B 66/22C 66/18Bpt 66/23

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Office space, Shop153 units in all
Address
66/24B 66/22C 66/18Bpt 66/23, OPP HIGHLAND RESIDENCY, DhokaliPIN 400608
Village
Thane (M Corp.), Thane taluka
Designated bank account
154
Developed in phases
No

Survey, CTS, gat or plot numbers

66/24B 66/22C 66/18Bpt 66/23

Boundaries

North
25 Mw D P Road
South
Stp And Building H2
East
Building A2
West
25 Mw D P Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking153 units

2 of 153 units booked (1%), as the promoter reported to MahaRERA

1BHK · 41 units2BHK · 88 unitsOffice space · 3 unitsShop · 21 units
TypeCarpet areaUnitsBooked
1BHK35.64 sq m · 384 sq ft220
1BHK37.99 sq m · 409 sq ft110
1BHK38.01 sq m · 409 sq ft80
2BHK49.26 sq m · 530 sq ft470
2BHK53.91 sq m · 580 sq ft310
2BHK53.94 sq m · 581 sq ft100
Office space15.74 sq m · 169 sq ft20
Office space83.03 sq m · 894 sq ft10
Show all 25 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop12.83 sq m · 138 sq ft10
Shop13.25 sq m · 143 sq ft11
Shop13.91 sq m · 150 sq ft20
Shop15.51 sq m · 167 sq ft10
Shop15.55 sq m · 167 sq ft11
Shop17.36 sq m · 187 sq ft10
Shop17.94 sq m · 193 sq ft30
Shop18.05 sq m · 194 sq ft10
Shop20.34 sq m · 219 sq ft10
Shop20.53 sq m · 221 sq ft10
Shop20.86 sq m · 225 sq ft10
Shop23.01 sq m · 248 sq ft10
Shop24.29 sq m · 261 sq ft10
Shop31.71 sq m · 341 sq ft10
Shop34.11 sq m · 367 sq ft20
Shop34.81 sq m · 375 sq ft10
Shop37.21 sq m · 401 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSachin Patil—
Chartered accountantP Somani And Company—
EngineerGopal Ramprakash Manchanda—
EngineerKuldeepsingh Chundawat—
EngineerMahimtura Consultants Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.