Guruprerna
Deedo IDDP-THN-D47AIts promised completion date, Oct 2024, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 63% of its units are booked.
Thane (M Corp.), Thane 400602 · Promoter: Amarsingh Narayansingh Thakur
Its promised completion date, Oct 2024, has passed and MahaRERA does not show it completed
- This projectRegistered 28 Feb 2020, completion promised 30 Oct 2024, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700024709
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700024709 | 28 Feb 2020 | 30 Oct 2024 | 30 Oct 2024 | Amarsingh Narayansingh Thakur | Project page |
Documents117
1 document held by Deedo, 116 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD- ANT.pdf · uploaded 18 Feb 2020Source
Legal
Migrated
- 1 PAN CardPAN CARD- ANT.pdf · uploaded 18 Feb 2020Source
- 1 Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 18 Feb 2020Source
- 1 Copy of Layout Approval (in case of layout)PLAN-1.pdf · uploaded 18 Feb 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN -2.pdf · uploaded 18 Feb 2020Source
Show all 117 documentsShow fewer documents
Migrated
- 2 Building Plan Approval / NA Order for plotted developmentPLAN-3.pdf · uploaded 18 Feb 2020Source
- 3 Building Plan Approval / NA Order for plotted developmentPLAN-5.pdf · uploaded 18 Feb 2020Source
- 4 Building Plan Approval / NA Order for plotted developmentPLAN-4.pdf · uploaded 18 Feb 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 18 Feb 2020Source
- 1 Declaration in FORM BDECLARATION B- SD.pdf · uploaded 18 Feb 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - 1.pdf · uploaded 18 Feb 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - 2.pdf · uploaded 18 Feb 2020Source
- 1 Proforma of Allotment letterAllotment Booking Letter.pdf · uploaded 18 Feb 2020Source
- 2 Proforma of Allotment letterRERA Agreement.pdf · uploaded 18 Feb 2020Source
- 3 Proforma of Allotment letterRERA Tenant Agreement.pdf · uploaded 18 Feb 2020Source
- 1 Details of encumbrancesENCUMBRANCE CERTIFICATE.pdf · uploaded 19 Feb 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 19 Feb 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM -3.pdf · uploaded 19 Feb 2020Source
- 1 Details of Restarting of Construction work post lockdownnaikwadi-20-06-2020.pdf · uploaded 25 Jun 2020Source
- 2 Details of Restarting of Construction work post lockdownnaikwadi- 1 20-06-2020.pdf · uploaded 25 Jun 2020Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 22 Nov 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-ENGG CERTIFICATE.pdf · uploaded 22 Nov 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed-1-4.pdf · uploaded 22 Nov 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed-5-8.pdf · uploaded 22 Nov 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - 2019-20.pdf · uploaded 22 Nov 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM-2A-march 2020.pdf · uploaded 10 Dec 2021Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE_March 2020.pdf · uploaded 10 Dec 2021Source
- 5 Building Plan Approval / NA Order for plotted developmentS2C_0062_12.pdf · uploaded 29 Apr 2022Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE SOLD INVETORY -1.pdf · uploaded 8 Jun 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)june-20 engg certificate.pdf · uploaded 17 Jun 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)sept-20- engg certificate.pdf · uploaded 17 Jun 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)dec-20-enggcertificate.pdf · uploaded 17 Jun 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)march-21- engg certificate.pdf · uploaded 17 Jun 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 2020.pdf · uploaded 17 Jun 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sep 2020.pdf · uploaded 17 Jun 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - DEC 2020.pdf · uploaded 17 Jun 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - March 2021.pdf · uploaded 17 Jun 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)june-20 - architecct certificate.pdf · uploaded 18 Jun 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)sept-20- architect certificate.pdf · uploaded 18 Jun 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)dec-20- architect certificate.pdf · uploaded 18 Jun 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)march-21- architect certificate.pdf · uploaded 18 Jun 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)JUNE-21 ARCHITECT CERTIFICATE.pdf · uploaded 20 Jun 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)SEPT-21 ARCHITECT CERTIFICATE.pdf · uploaded 20 Jun 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)DEC-21 ARCHITECT CERTIFICATE.pdf · uploaded 20 Jun 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)JUNE-21-ENGINEERING CERTIFICATE.pdf · uploaded 5 Sep 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)SEPT-21-ENGINEERING CERTIFICATE.pdf · uploaded 5 Sep 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC-21-ENGINEERING CERTIFICATE.pdf · uploaded 5 Sep 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)MARCH-22-ENGINEERING CERTIFICATE.pdf · uploaded 5 Sep 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 2020_Revised Form 3.pdf · uploaded 5 Sep 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 2020_Revised Form 3.pdf · uploaded 5 Sep 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 2020_Revised Form 3.pdf · uploaded 5 Sep 2022Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mar 2021_Revised Form 3.pdf · uploaded 5 Sep 2022Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 2021_Form 3.pdf · uploaded 5 Sep 2022Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 2021_Form 3.pdf · uploaded 5 Sep 2022Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 2021_Form 3.pdf · uploaded 5 Sep 2022Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mar 2022_Form 3.pdf · uploaded 5 Sep 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1-JUNE-22.pdf · uploaded 6 Oct 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2- JUNE-22.pdf · uploaded 6 Oct 2022Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 2022.pdf · uploaded 6 Oct 2022Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Sept-22.pdf · uploaded 24 Dec 2022Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE- SEPT-22.pdf · uploaded 24 Dec 2022Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-SEPT-22-SIGNED.pdf · uploaded 24 Dec 2022Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)form1.pdf · uploaded 17 Mar 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 17 Mar 2023Source
- 3 Disclosure of sold/ booked inventorydiscclosure sold invetory - dec22.pdf · uploaded 17 Mar 2023Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - FINAL-SINGED.pdf · uploaded 17 Mar 2023Source
- 2 Commencement Certificates / NA Order for plotted development6689FinalCC_S2C_0062_12.pdf · uploaded 18 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5.pdf · uploaded 2 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5.pdf · uploaded 2 May 2023Source
- 2 Details of encumbrancesno due certificate.pdf · uploaded 30 May 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - March-23.pdf · uploaded 27 Oct 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate - March'23.pdf · uploaded 27 Oct 2023Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3_Q4-22-23_final.pdf · uploaded 30 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM5-Q4-22-23.pdf · uploaded 30 Oct 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - JUNE-23.pdf · uploaded 9 Jan 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - SEPT-23.pdf · uploaded 9 Jan 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2- JUNE-23.pdf · uploaded 9 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2- SEPT-23.pdf · uploaded 9 Jan 2024Source
- 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 2023-dsc.pdf · uploaded 9 Jan 2024Source
- 21 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sep 2023- dsc.pdf · uploaded 9 Jan 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1 - GURUPRERNA- DEC-23.pdf · uploaded 7 Jun 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)FOM2_Guruprerna_Dec-23.pdf · uploaded 7 Jun 2024Source
- 22 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Dec 2023.pdf · uploaded 7 Jun 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPATION CERTIFICATE_GURUPRERNA.pdf · uploaded 7 Jun 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1-ARCHITECT CERTIFICATE- GALICIA - JUNE-24.pdf · uploaded 8 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_June 24.pdf · uploaded 8 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2-JUNE-24.pdf · uploaded 8 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form5-2023-24-GURUPRERNA.pdf · uploaded 13 Jan 2025Source
- 1 Architect’s Certificate on Completion of Project (Form 4)FORM4_GURUPRERNA.pdf · uploaded 25 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1-JUNE-24-GURUPRERNA.pdf · uploaded 11 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1-SEPT-24-GURUPRERNA.pdf · uploaded 11 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3-GURUPRERNA-JUNE-24.pdf · uploaded 11 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3-GURUPRERNA-SEPT-24.pdf · uploaded 11 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 -Guruprerna- June-24.pdf · uploaded 11 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2-SEPT-24-GURUPRERNA.pdf · uploaded 11 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1_DEC-24-GURUPRERNA.pdf · uploaded 4 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Guruprerna_Dec 2024.pdf · uploaded 4 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2-GURUPRERNA-DEC-24.pdf · uploaded 4 Mar 2025Source
Technical
Technical (Architect)
- DocumentFORM1 - GURUPRERNA- DEC-23.pdf · uploaded 7 Jun 2024Source
- DocumentFORM-1-ARCHITECT CERTIFICATE- GALICIA - JUNE-24.pdf · uploaded 8 Jan 2025Source
- DocumentFORM1-JUNE-24-GURUPRERNA.pdf · uploaded 11 Feb 2025Source
- DocumentFORM1-SEPT-24-GURUPRERNA.pdf · uploaded 11 Feb 2025Source
- DocumentFORM1_DEC-24-GURUPRERNA.pdf · uploaded 4 Mar 2025Source
Technical (Engineer)
- DocumentFOM2_Guruprerna_Dec-23.pdf · uploaded 7 Jun 2024Source
- DocumentFORM-2-JUNE-24.pdf · uploaded 8 Jan 2025Source
- DocumentForm-2 -Guruprerna- June-24.pdf · uploaded 11 Feb 2025Source
- DocumentFORM2-SEPT-24-GURUPRERNA.pdf · uploaded 11 Feb 2025Source
- DocumentFORM2-GURUPRERNA-DEC-24.pdf · uploaded 4 Mar 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsCTS NO. 9C, TIKA NO. 24
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 1RK, Office space, Shop63 units in all
- Address
- Cts No. 9c, Tika No. 24, Gokhale Road, Naik WadiPIN 400602
- Village
- Thane (M Corp.), Thane taluka
- Location
- 20.21520, 73.79860
- Designated bank account
- 203
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- Gaodevi Road
- South
- Gokhale Road
- East
- Naik Wadi
- West
- Land Tika No 24
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking63 units
40 of 63 units booked (63%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 33.28 sq m · 358 sq ft | 7 | 3 |
| 1BHK | 34.89 sq m · 376 sq ft | 1 | 1 |
| 1BHK | 46.82 sq m · 504 sq ft | 12 | 8 |
| 1RK | 17 sq m · 183 sq ft | 8 | 5 |
| 1RK | 23.92 sq m · 257 sq ft | 8 | 8 |
| 1RK | 23.93 sq m · 258 sq ft | 3 | 3 |
| 1RK | 31.93 sq m · 344 sq ft | 12 | 7 |
| Office space | 19.34 sq m · 208 sq ft | 1 | 0 |
Show all 16 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 27.6 sq m · 297 sq ft | 1 | 1 |
| Office space | 30.85 sq m · 332 sq ft | 3 | 2 |
| Office space | 36.21 sq m · 390 sq ft | 2 | 2 |
| Office space | 42.13 sq m · 453 sq ft | 1 | 0 |
| Shop | 9.93 sq m · 107 sq ft | 1 | 0 |
| Shop | 15.77 sq m · 170 sq ft | 1 | 0 |
| Shop | 19.11 sq m · 206 sq ft | 1 | 0 |
| Shop | 24.04 sq m · 259 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Akshay Anil Dhaware | — |
| Registered real estate agent | Kalpesh Vijay Deokar | — |
| Registered real estate agent | Mahavir Prasad Toshniwal | — |
| Registered real estate agent | Ramlaut Muneshwar Kurmi | — |
Source: MahaRERA project page. Contact details are not shown.