Forestville - Phase 1
It is due for completion in Dec 2029, with no extension on record; no MahaRERA orders on record; 19% of its units are booked.
Thane (M Corp.), Thane 400607 · Promoter: Oberoi Realty Limited
It is due for completion in Dec 2029, with no extension on record
- This projectRegistered 1 Apr 2023, completion promised 31 Dec 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Tower A60 floors · 415 units5% booked
- Tower B60 floors · 415 units22% booked
- Tower C60 floors · 427 units30% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700050312
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700050312 | 1 Apr 2023 | 31 Dec 2029 | 31 Dec 2029 | Oberoi Realty Limited | Project page |
Documents201
1 document held by Deedo, 200 filings listed on MahaRERA's project page
Finance
- PAN CardORL PAN Card.pdf · uploaded 10 Feb 2023Source
Legal
- Other – LegalOth notes with ALPS 13th Feb.pdf · uploaded 13 Feb 2023Source
- Legal Title reportRERA TITLE CERTIFICATE Kolshet.pdf · uploaded 6 Mar 2023Source
- Declaration Form BNotarised Affidavit Cum-Declartion promoter.pdf · uploaded 20 Mar 2023Source
- Declaration Form BForm B_ORL.pdf · uploaded 23 Oct 2023Source
- Declaration Form BDeclaration - JV Partner.pdf · uploaded 23 Oct 2023Source
Migrated
- 1 PAN CardORL PAN Card.pdf · uploaded 10 Feb 2023Source
Show all 201 documentsShow fewer documents
Migrated
- 1 a Details of encumbrances concerned to FinanceLitigation Details.pdf · uploaded 10 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalLitigation Details.pdf · uploaded 10 Feb 2023Source
- 1 Copy of Layout Approval (in case of layout)1_compressed.pdf · uploaded 10 Feb 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentLETTER.pdf · uploaded 10 Feb 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding 5 section.pdf · uploaded 10 Feb 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentDrawing 02.pdf · uploaded 10 Feb 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentLETTER.pdf · uploaded 10 Feb 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200260068186_For_Asset_Based_Search_10_02_2023_13_17_34_489.pdf · uploaded 10 Feb 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest of BO in other REP.pdf · uploaded 10 Feb 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest of Mr Kawaljit in other REP.pdf · uploaded 10 Feb 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest of Mr Venkatesh in other REP.pdf · uploaded 10 Feb 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest of Ms Tina in other REP.pdf · uploaded 10 Feb 2023Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest of SD in other REP.pdf · uploaded 10 Feb 2023Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest of TP Otswal in other REP.pdf · uploaded 10 Feb 2023Source
- 7 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest of VO in other REP.pdf · uploaded 10 Feb 2023Source
- 1 Deviation Report with respect to Allotment letterDEVIATION REPORT-RERA Allotment Letter.pdf · uploaded 10 Feb 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report AFS Kolshet Phase 1.pdf · uploaded 10 Feb 2023Source
- 1 Other – LegalOth notes with ALPS 13th Feb.pdf · uploaded 13 Feb 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Thane-Kolshet Form 3 CA Certificate Dec 22.pdf · uploaded 2 Mar 2023Source
- 1 Proforma of Agreement for saleDRAFT AFS_JOGANI LAND_(09022023) with deviation highlighted.pdf · uploaded 2 Mar 2023Source
- 1 Proforma of Allotment letterRERA Allotment Letter.pdf · uploaded 2 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Declaration.pdf · uploaded 2 Mar 2023Source
- 1 Copy of the legal title reportRERA TITLE CERTIFICATE Kolshet.pdf · uploaded 6 Mar 2023Source
- 1 Declaration about Commencement CertificateForm D revised.pdf · uploaded 20 Mar 2023Source
- 1 Declaration in FORM BNotarised Affidavit Cum-Declartion promoter.pdf · uploaded 20 Mar 2023Source
- 2 a Details of encumbrances concerned to FinanceNon encumbrance finance kolshet.pdf · uploaded 27 Mar 2023Source
- 2 b Details of encumbrances concerned to LegalNon encumbrance finance kolshet.pdf · uploaded 27 Mar 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed_Thane _Kolshet.pdf · uploaded 21 Jul 2023Source
- 2 Copy of Layout Approval (in case of layout)01_layout_compressed.pdf · uploaded 21 Oct 2023Source
- 4 Building Plan Approval / NA Order for plotted development00_amendment and CC.pdf · uploaded 21 Oct 2023Source
- 5 Building Plan Approval / NA Order for plotted development02_Ground floor_compressed.pdf · uploaded 21 Oct 2023Source
- 6 Building Plan Approval / NA Order for plotted development03_1st and 2nd floor_compressed.pdf · uploaded 21 Oct 2023Source
- 7 Building Plan Approval / NA Order for plotted development03_1st and 2nd floor_compressed.pdf · uploaded 21 Oct 2023Source
- 8 Building Plan Approval / NA Order for plotted development05_5th and 6th floor_compressed.pdf · uploaded 21 Oct 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentTower A_2.pdf · uploaded 21 Oct 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentTower A_3.pdf · uploaded 21 Oct 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentTower A-1_A.pdf · uploaded 21 Oct 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentTower A_1_B.pdf · uploaded 21 Oct 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentTower A-1_C.pdf · uploaded 21 Oct 2023Source
- 14 Building Plan Approval / NA Order for plotted development16_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- 15 Building Plan Approval / NA Order for plotted development17_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- 16 Building Plan Approval / NA Order for plotted development18_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- 17 Building Plan Approval / NA Order for plotted development19_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- 18 Building Plan Approval / NA Order for plotted development20_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- 19 Building Plan Approval / NA Order for plotted development21_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- 20 Building Plan Approval / NA Order for plotted development22_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- 21 Building Plan Approval / NA Order for plotted development23_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- 22 Building Plan Approval / NA Order for plotted development24_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- 23 Building Plan Approval / NA Order for plotted development25_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- 24 Building Plan Approval / NA Order for plotted development26_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- 25 Building Plan Approval / NA Order for plotted development27_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- 26 Building Plan Approval / NA Order for plotted development28_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- 2 Commencement Certificates / NA Order for plotted development00_amendment and CC.pdf · uploaded 21 Oct 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentCC1_compressed.pdf · uploaded 21 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Forestville - Phase 1 CA Certificate Sep 23 Low Res.pdf · uploaded 21 Oct 2023Source
- 2 Declaration about Commencement CertificateAdditional DeclarationAmend 21 10 2023_For sign.pdf · uploaded 23 Oct 2023Source
- 3 Declaration about Commencement CertificateDeclaration on CC_21 10 2023_for sign.pdf · uploaded 23 Oct 2023Source
- 2 Declaration in FORM BForm B_ORL.pdf · uploaded 23 Oct 2023Source
- 3 Declaration in FORM BDeclaration - JV Partner.pdf · uploaded 23 Oct 2023Source
- 3 Copy of Layout Approval (in case of layout)01_Approved layout markups_PM_compressed.pdf · uploaded 25 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q1.pdf · uploaded 3 Nov 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q2.pdf · uploaded 3 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Annual Audit Report.pdf · uploaded 3 Nov 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2 - Engineers Certificate Q1.pdf · uploaded 7 Nov 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2 - Engineers Certificate Q2.pdf · uploaded 7 Nov 2023Source
- 2 Proforma of Agreement for saleDraft AFS Forestville RERA.pdf · uploaded 23 Nov 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_Elysian_CDE_300623.pdf · uploaded 5 Dec 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Thane Kolshet Sep 23.pdf · uploaded 11 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)June_Form_1_Kolshet.pdf · uploaded 4 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Oct_F_1_Kolshet.pdf · uploaded 4 Jan 2024Source
- 3 Proforma of Agreement for saleAgreement for Sale (Forestville-Kolshet)_.pdf · uploaded 18 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1ForesvillePhase1.pdf · uploaded 20 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Forestville Phase - 1 Form 3 (with UDIN)_Signed.pdf · uploaded 20 Jan 2024Source
- 4 Proforma of Agreement for saleFORESTVILLE_AFS.pdf · uploaded 13 Feb 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2ForestvilePhase1.pdf · uploaded 22 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form_1_Forestville_Reduced.pdf · uploaded 20 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_Forestville.pdf · uploaded 20 Apr 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Fom_2A_Forestville.pdf · uploaded 20 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Forestville Phase - 1 Form 3.pdf · uploaded 20 Apr 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Forestville_Phase I_ORL.pdf · uploaded 20 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Forestville_Phase I_ORL.pdf · uploaded 20 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)ORL_Form_3_Forestville.pdf · uploaded 20 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Forestville Phase I.pdf · uploaded 8 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Forestville Phase - 1 Form 3.pdf · uploaded 19 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_Forestville.pdf · uploaded 19 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1_Forestville.pdf · uploaded 22 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ORL_Forestville_Phase 1_.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ORL_Forestville_.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ORL_Forestville_Phase 1.pdf · uploaded 20 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentKolshet CC 31122024.pdf · uploaded 18 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ORL_Form-1_Forestville_Phase-1.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Forestville_Phase-1_Form 3.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ORL_Form-2_Forestville_Phase-1.pdf · uploaded 19 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf · uploaded 19 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)ORL_Form-2A_Forestville_Phase-1.pdf · uploaded 22 Apr 2025Source
- Form 1Forestville Phase-1 Form 1 202503.pdf · uploaded 19 Jul 2025Source
- Form 2Forestville Phase-1 Form 2 202503.pdf · uploaded 19 Jul 2025Source
- Form 3Forestville Phase-1 Form 3 202503.pdf · uploaded 19 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold and booked inventory 202503.pdf · uploaded 19 Jul 2025Source
- Withdrawal Update Form 1ORLForm1ForestvilleJune25.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 1ORLForm1ForestvilleJune25.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 1ORLForm1ForestvilleJune25.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 1ORLForm1ForestvilleJune25.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 2ORLForm2ForestvilleJune25.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 2ORLForm2ForestvilleJune25.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 2ORLForm2ForestvilleJune25.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 2ORLForm2ForestvilleJune25.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 3Forestville Phase-1 Form 3 202506 with UDIN.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 3Forestville Phase-1 Form 3 202506 with UDIN.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 3Forestville Phase-1 Form 3 202506 with UDIN.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 3Forestville Phase-1 Form 3 202506 with UDIN.pdf · uploaded 20 Jul 2025Source
- Form 1Forestville Phase - 1 Form 1 202412.pdf · uploaded 4 Sep 2025Source
- Form 1Forestville Phase - 1 Form 1 202409.pdf · uploaded 4 Sep 2025Source
- Form 1Form 1_Forestville_Phase I_202406.pdf · uploaded 4 Sep 2025Source
- Form 1Forestville Phase - 1 Form 1 202403.pdf · uploaded 4 Sep 2025Source
- Form 1Forestvile Phase 1 Form 1 - 202312.pdf · uploaded 4 Sep 2025Source
- Form 2Forestville Phase - 1 Form 2 202412.pdf · uploaded 4 Sep 2025Source
- Form 2Forestville Phase - 1 Form 2 202409.pdf · uploaded 4 Sep 2025Source
- Form 2Form 2_Forestville_Phase I_202406.pdf · uploaded 4 Sep 2025Source
- Form 2Forestville Phase - 1 Form 2 202403.pdf · uploaded 4 Sep 2025Source
- Form 2Forestvile Phase 1 Form 2 - 202312.pdf · uploaded 4 Sep 2025Source
- Form 3Forestville Phase - 1 Form 3 202412.pdf · uploaded 4 Sep 2025Source
- Form 3Forestville Phase - 1 Form 3 202409.pdf · uploaded 4 Sep 2025Source
- Form 3Form_3_Forestville_Phase I_202406.pdf · uploaded 4 Sep 2025Source
- Form 3Forestville Phase - 1 Form 3 202403.pdf · uploaded 4 Sep 2025Source
- Form 3Forestvile Phase 1 Form 3 - 202312.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold and unsold inventory 202412.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold and unsold inventory 202409.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold and unsold inventory 202406.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold and unsold inventory 202403.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold and unsold inventory 202312.pdf · uploaded 4 Sep 2025Source
- Form 5 (FY 2024-2025)Forestville Phase I.pdf · uploaded 26 Sep 2025Source
- Form 5 (FY 2023-2024)Forestville Phase I.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1Form1_Forestville_Phase1.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Form1_Forestville_Phase1.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Form1_Forestville_Phase1.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Form1_Forestville_Phase1.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Form2_Forestville_Phase1.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Form2_Forestville_Phase1.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Form2_Forestville_Phase1.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Form2_Forestville_Phase1.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Forestville Phase I Form 3 (UDIN) PDF.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Forestville Phase I Form 3 (UDIN) PDF.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Forestville Phase I Form 3 (UDIN) PDF.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Forestville Phase I Form 3 (UDIN) PDF.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Form 1_Forestville Phase 1.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Form 2_Forestville Phase 1.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Form 3_Forestville Phase 1_smaller.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Form_1_Forestville_Phase_1.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form_2_ForestVille_Phase_1.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Form_3_ForestVille_Phase_1.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)Form_2A_Forestville_Phase_1.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 1Form_1_Forestville_Phase_1_Signed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Form_2_Forestville_Phase_1_Signed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Form_3_Forestville_Phase_1_Signed.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)ForestvillePhaseI202603.pdf · uploaded 24 Sep 2026Source
Technical
- Document1_compressed.pdf · uploaded 10 Feb 2023Source
- DocumentLETTER.pdf · uploaded 10 Feb 2023Source
- DocumentBuilding 5 section.pdf · uploaded 10 Feb 2023Source
- DocumentDrawing 02.pdf · uploaded 10 Feb 2023Source
- Document01_layout_compressed.pdf · uploaded 21 Oct 2023Source
- Document00_amendment and CC.pdf · uploaded 21 Oct 2023Source
- Document22_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- Document23_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- Document24_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- Document25_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- Document26_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- Document27_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- Document28_Tower C_compressed.pdf · uploaded 21 Oct 2023Source
- Document02_Ground floor_compressed.pdf · uploaded 21 Oct 2023Source
- Document03_1st and 2nd floor_compressed.pdf · uploaded 21 Oct 2023Source
- Document03_1st and 2nd floor_compressed.pdf · uploaded 21 Oct 2023Source
- Document05_5th and 6th floor_compressed.pdf · uploaded 21 Oct 2023Source
- DocumentTower A_2.pdf · uploaded 21 Oct 2023Source
- DocumentTower A_3.pdf · uploaded 21 Oct 2023Source
- DocumentTower A-1_A.pdf · uploaded 21 Oct 2023Source
- DocumentTower A_1_B.pdf · uploaded 21 Oct 2023Source
- DocumentTower A-1_C.pdf · uploaded 21 Oct 2023Source
- Document16_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- Document17_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- Document18_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- Document19_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- Document20_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- Document21_Tower B_compressed.pdf · uploaded 21 Oct 2023Source
- Document01_Approved layout markups_PM_compressed.pdf · uploaded 25 Oct 2023Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsCTS no 1141
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 3BHK Deluxe, 3BHK Majestic, 4.5BHK Palatial, Duplex, Duplex Plus, Duplex Studio, Garden Suite A, Majestic Studio, Garden Studio, Garden Suite B, 3BHK Elite A, 3BHK Elite B1,257 units in all
- Address
- CTS no 1141, Kolshet road, KolshetPIN 400607
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.23655, 72.98932
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- CTS no 1141
- South
- CTS no 1141
- East
- CTS no 1141
- West
- CTS no 1141
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking1,257 units
240 of 1,257 units booked (19%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tower A | 3BHK Deluxe | 97.69 sq m · 1,052 sq ft | 188 | 12 |
| Tower A | 3BHK Majestic | 97.16 sq m · 1,046 sq ft | 102 | 4 |
| Tower A | 4.5BHK Palatial | 154.46 sq m · 1,663 sq ft | 11 | 0 |
| Tower A | Duplex | 174.35 sq m · 1,877 sq ft | 4 | 0 |
| Tower A | Duplex Plus | 173.28 sq m · 1,865 sq ft | 2 | 0 |
| Tower A | Duplex Studio | 26.07 sq m · 281 sq ft | 4 | 0 |
| Tower A | Garden Suite A | 174.35 sq m · 1,877 sq ft | 2 | 0 |
| Tower A | Majestic Studio | 26.07 sq m · 281 sq ft | 102 | 4 |
Show all 28 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tower B | 3BHK Deluxe | 97.69 sq m · 1,052 sq ft | 182 | 48 |
| Tower B | 3BHK Majestic | 97.16 sq m · 1,046 sq ft | 102 | 22 |
| Tower B | 4.5BHK Palatial | 154.46 sq m · 1,663 sq ft | 11 | 1 |
| Tower B | Duplex | 174.35 sq m · 1,877 sq ft | 4 | 0 |
| Tower B | Duplex Plus | 173.28 sq m · 1,865 sq ft | 2 | 0 |
| Tower B | Duplex Studio | 26.07 sq m · 281 sq ft | 4 | 0 |
| Tower B | Garden Studio | 26.07 sq m · 281 sq ft | 4 | 0 |
| Tower B | Garden Suite A | 174.35 sq m · 1,877 sq ft | 2 | 0 |
| Tower B | Garden Suite B | 173.28 sq m · 1,865 sq ft | 2 | 0 |
| Tower B | Majestic Studio | 26.07 sq m · 281 sq ft | 102 | 22 |
| Tower C | 3BHK Deluxe | 97.69 sq m · 1,052 sq ft | 182 | 103 |
| Tower C | 3BHK Elite A | 104.98 sq m · 1,130 sq ft | 2 | 0 |
| Tower C | 3BHK Elite B | 97.66 sq m · 1,051 sq ft | 1 | 0 |
| Tower C | 3BHK Majestic | 97.16 sq m · 1,046 sq ft | 107 | 12 |
| Tower C | 4.5BHK Palatial | 154.46 sq m · 1,663 sq ft | 11 | 0 |
| Tower C | Duplex | 174.35 sq m · 1,877 sq ft | 4 | 0 |
| Tower C | Duplex Plus | 173.28 sq m · 1,865 sq ft | 2 | 0 |
| Tower C | Duplex Studio | 26.07 sq m · 281 sq ft | 4 | 0 |
| Tower C | Garden Suite A | 174.35 sq m · 1,877 sq ft | 4 | 0 |
| Tower C | Majestic Studio | 26.07 sq m · 281 sq ft | 110 | 12 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals52
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Siddhesh Samant | — |
| Chartered accountant | TMG & associates | — |
| Engineer | Lera | — |
| Registered real estate agent | 360 Realtors LLP | — |
| Registered real estate agent | Acequare Realty Private Limited | — |
| Registered real estate agent | Ashish Madhukar Rumde | — |
| Registered real estate agent | Bajaj Capital Investment Centre Ltd | — |
| Registered real estate agent | Beyond Luxury Real Estate Consultants LLP | — |
Show all 52 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Bhavin Kantilal Lakhani | — |
| Registered real estate agent | Bricksbazar Realty LLP | — |
| Registered real estate agent | Deepika Bothra | — |
| Registered real estate agent | Digipace Consulting (Opc) Private Limited | — |
| Registered real estate agent | Hemanshu Ramesh Mavadia | — |
| Registered real estate agent | Hemant Kashinath Tiwari | — |
| Registered real estate agent | Himanshu Ganpat Dosi | — |
| Registered real estate agent | Housing Quest | — |
| Registered real estate agent | IndextapTechnologies Private Limited | — |
| Registered real estate agent | Indobricks Real Estate Advisory Private Limited | — |
| Registered real estate agent | Jay Jagdish Parmar | — |
| Registered real estate agent | JM Financial Products Limited | — |
| Registered real estate agent | Kalpesh Valia Realty Private Limited | — |
| Registered real estate agent | Ketan Uttam Choube | — |
| Registered real estate agent | Key Mansions Private Limited | — |
| Registered real estate agent | Kool Properties Solutions Pvt Ltd | — |
| Registered real estate agent | Livnest Technologies Private Limited | — |
| Registered real estate agent | Manisha Lifespaces Consulting Pvt. Ltd. | — |
| Registered real estate agent | Maruti Estate Consultant | — |
| Registered real estate agent | MoinNawaz Saifuddin Shaikh | — |
| Registered real estate agent | Mukesh Nandkishor Singh | — |
| Registered real estate agent | Mustufa Mahebubsha Fakir | — |
| Registered real estate agent | Nilesh Estate Agency | — |
| Registered real estate agent | Nilesh Hariom Jaipuria | — |
| Registered real estate agent | Nitin Ajabrao Sonawane | — |
| Registered real estate agent | Nitin Ramdas Kasar | — |
| Registered real estate agent | Perfect Properties & Consultancy | — |
| Registered real estate agent | Propertypistol Realty Private Limited | — |
| Registered real estate agent | Ramakant Ramsanehi Tiwari | — |
| Registered real estate agent | Rohan Anand Poojari | — |
| Registered real estate agent | Royalti Real Estate Private Limited | — |
| Registered real estate agent | Saikrishna Property Solutions | — |
| Registered real estate agent | Sameer Sirajuddin Shaikh | — |
| Registered real estate agent | Sampat Ghorpade | — |
| Registered real estate agent | Sandeep Suryakant Sangani | — |
| Registered real estate agent | Skylight Advisors Private Limited (Opc) | — |
| Registered real estate agent | TRG Estates | — |
| Registered real estate agent | Uma Mohan Sanghvi | — |
| Registered real estate agent | Umesh Pradeep Keni | — |
| Registered real estate agent | Varun Shivkumar Narsaria | — |
| Registered real estate agent | Vinod Revachand Makhija | — |
| Registered real estate agent | Vishnu Shivprasad Modi | — |
| Registered real estate agent | Willow Stone Realty Private Limited | — |
| Registered real estate agent | Zapkey Technologies Private Limited | — |
Source: MahaRERA project page. Contact details are not shown.