Florence
Deedo IDDP-THN-Z3VBCompletion was pushed back 3 years to Mar 2023, and that date has passed too; no MahaRERA orders on record; 73% of its units are booked.
Thane (M Corp.), Thane 400615 · Promoter: Satguru Lifespaces
Completion was pushed back 3 years to Mar 2023, and that date has passed too
- This projectRegistered 6 Aug 2017, completion promised 31 Mar 2020, revised to 31 Mar 2023, and still not shown completed today.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700003627
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700003627 | 6 Aug 2017 | 31 Mar 2020 | 31 Mar 2023 | Satguru Lifespaces | Project page |
Documents133
2 documents held by Deedo, 131 filings listed on MahaRERA's project page
Finance
- PAN CardSatguru Lifespaces PAN Card.pdf · uploaded 29 Jul 2017Source
Legal
Show all 133 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesNo Encumbrances Declaration.pdf · uploaded 29 Jul 2017Source
- 2 Details of encumbrancesIndex 2.pdf · uploaded 29 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)Plot Area and Ground Floor Plan.pdf · uploaded 29 Jul 2017Source
- 2 Copy of Layout Approval (in case of layout)1st Floor Plan and Podium Layout Plan.pdf · uploaded 29 Jul 2017Source
- 3 Copy of Layout Approval (in case of layout)2nd Floor Plan.pdf · uploaded 29 Jul 2017Source
- 4 Copy of Layout Approval (in case of layout)Typical Floor Plan and Terrace Flat Plan.pdf · uploaded 29 Jul 2017Source
- 5 Copy of Layout Approval (in case of layout)Overall Plan Section and Elevation.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate - Form 1 compressed.pdf · uploaded 29 Jul 2017Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect additional certificate.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate- Form 2.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of CA (Form 3)CA Certificate- Form 3.pdf · uploaded 29 Jul 2017Source
- 1 OtherProposed Plan.pdf · uploaded 29 Jul 2017Source
- 1 Building Plan Approval (IOD)CC 2014.pdf · uploaded 30 Jul 2017Source
- 2 Building Plan Approval (IOD)Plinth Certificate.pdf · uploaded 30 Jul 2017Source
- 3 Building Plan Approval (IOD)CC 18TH Floor.pdf · uploaded 30 Jul 2017Source
- 1 Declaration in FORM Bform B-min.pdf · uploaded 30 Jul 2017Source
- 1 Proforma of Allotment letterDeclaration for Sale Agreement.pdf · uploaded 30 Jul 2017Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Form.pdf · uploaded 31 Oct 2017Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Form.pdf · uploaded 31 Oct 2017Source
- 2 Certificates of CA (Form 3)CA Form.pdf · uploaded 31 Oct 2017Source
- 2 Proforma of Allotment letterAllotment letter and Agreement for Sale.pdf · uploaded 31 Oct 2017Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)rera form 1 - 31st dec 17.pdf · uploaded 18 Feb 2018Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 RERA- 31st Dec 2017.pdf · uploaded 18 Feb 2018Source
- 3 Certificates of CA (Form 3)RERA_Form 3-Satguru_Dec17_PDF.pdf · uploaded 18 Feb 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCC 18TH Floor.pdf · uploaded 30 Mar 2018Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 13 May 2018Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2.pdf · uploaded 13 May 2018Source
- 4 Certificates of CA (Form 3)FORM 3.pdf · uploaded 13 May 2018Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA FORM 1 30-6-18.pdf · uploaded 31 Jul 2018Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA FORM 2 30-6-18.pdf · uploaded 31 Jul 2018Source
- 5 Certificates of CA (Form 3)RERA FORM 3 30-6-18.pdf · uploaded 31 Jul 2018Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 Sep 2018.pdf · uploaded 10 Nov 2018Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Sep 2018.pdf · uploaded 10 Nov 2018Source
- 6 Certificates of CA (Form 3)RERA Form 3 Sep 2018.pdf · uploaded 10 Nov 2018Source
- 1 Certificates of CA (Form 5)form 5.pdf · uploaded 29 Dec 2018Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 Dec 18.pdf · uploaded 19 Feb 2019Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Dec 18.pdf · uploaded 19 Feb 2019Source
- 7 Certificates of CA (Form 3)Rera Form 3 Dec 18.pdf · uploaded 19 Feb 2019Source
- 6 Copy of Layout Approval (in case of layout)March 2019 1.pdf · uploaded 25 Apr 2019Source
- 7 Copy of Layout Approval (in case of layout)March 2019 2.pdf · uploaded 25 Apr 2019Source
- 8 Copy of Layout Approval (in case of layout)March 2019 3.pdf · uploaded 25 Apr 2019Source
- 9 Copy of Layout Approval (in case of layout)March 2019 4.pdf · uploaded 25 Apr 2019Source
- 10 Copy of Layout Approval (in case of layout)March 2019 5.pdf · uploaded 25 Apr 2019Source
- 11 Copy of Layout Approval (in case of layout)March 2019 6.pdf · uploaded 25 Apr 2019Source
- 2 Commencement Certificates / NA Order for plotted developmentCC 22nd Floor.pdf · uploaded 25 Apr 2019Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 March 2019.pdf · uploaded 4 May 2019Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 March 2019.pdf · uploaded 4 May 2019Source
- 8 Certificates of CA (Form 3)RERA Form 3 March 2019.pdf · uploaded 4 May 2019Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 June 2019.pdf · uploaded 1 Aug 2019Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 June 2019.pdf · uploaded 1 Aug 2019Source
- 9 Certificates of CA (Form 3)RERA Form 3 June 2019.pdf · uploaded 1 Aug 2019Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 Sep 2019.pdf · uploaded 31 Oct 2019Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Sep 2019.pdf · uploaded 31 Oct 2019Source
- 10 Certificates of CA (Form 3)RERA Form 3 Sep 2019.pdf · uploaded 31 Oct 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)RERA FORM 5 FY 2018-19.pdf · uploaded 28 Nov 2019Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 Dec 2019.pdf · uploaded 31 Jan 2020Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Dec 2019.pdf · uploaded 31 Jan 2020Source
- 11 Certificates of CA (Form 3)RERA Form 3 Dec 2019.pdf · uploaded 31 Jan 2020Source
- 12 Copy of Layout Approval (in case of layout)TMC PLANS MAR 20.pdf · uploaded 24 Aug 2020Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Mar 20.pdf · uploaded 24 Aug 2020Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Mar 20.pdf · uploaded 24 Aug 2020Source
- 12 Certificates of CA (Form 3)Form 3 Mar 20.pdf · uploaded 24 Aug 2020Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1.pdf · uploaded 21 Sep 2020Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2.pdf · uploaded 21 Sep 2020Source
- 13 Certificates of CA (Form 3)RERA Form 3.pdf · uploaded 21 Sep 2020Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Sep 20.pdf · uploaded 10 Nov 2020Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sep 20.pdf · uploaded 10 Nov 2020Source
- 14 Certificates of CA (Form 3)Form 3 Sep 20.pdf · uploaded 10 Nov 2020Source
- 2 Certificates of CA (Form 5)Form 5 FY 2019 20.pdf · uploaded 26 Nov 2020Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA FORM 1.pdf · uploaded 1 Feb 2021Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec 20.pdf · uploaded 1 Feb 2021Source
- 15 Certificates of CA (Form 3)RERA FORM 3.pdf · uploaded 1 Feb 2021Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Mar 21.pdf · uploaded 30 Apr 2021Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Mar 21.pdf · uploaded 30 Apr 2021Source
- 16 Certificates of CA (Form 3)Form 3 Mar 21.pdf · uploaded 30 Apr 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentCircular 32.pdf · uploaded 15 Jun 2021Source
- 4 Commencement Certificates / NA Order for plotted developmentCC 2020.pdf · uploaded 15 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Declaration.pdf · uploaded 15 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Declaration.pdf · uploaded 15 Jun 2021Source
- 1 Disclosure of sold/ booked inventoryCircular 29_upload.pdf · uploaded 15 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 2019 20.pdf · uploaded 15 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 of Satuguru Lifespaces.pdf · uploaded 15 Jun 2021Source
- 1 Declaration about Commencement CertificateCircular 32.pdf · uploaded 20 Jun 2021Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Jun 21_.pdf · uploaded 29 Jul 2021Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Jun 21.pdf · uploaded 29 Jul 2021Source
- 17 Certificates of CA (Form 3)Form 3 Jun 21.pdf · uploaded 29 Jul 2021Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 Sep 21.pdf · uploaded 30 Oct 2021Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Sep 21.pdf · uploaded 30 Oct 2021Source
- 18 Certificates of CA (Form 3)RERA Form 3 Sep 21.pdf · uploaded 30 Oct 2021Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 Dec 21.pdf · uploaded 29 Jan 2022Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Dec 21.pdf · uploaded 29 Jan 2022Source
- 19 Certificates of CA (Form 3)RERA Form 3 Dec 21.pdf · uploaded 29 Jan 2022Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Mar 22.pdf · uploaded 30 Apr 2022Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Mar 22.pdf · uploaded 30 Apr 2022Source
- 20 Certificates of CA (Form 3)Rera Form 3 Mar 22.pdf · uploaded 30 Apr 2022Source
- 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 June 22.pdf · uploaded 29 Jul 2022Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 June 22.pdf · uploaded 4 Aug 2022Source
- 21 Certificates of CA (Form 3)RERA Form 3 June 22.pdf · uploaded 4 Aug 2022Source
- 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 Sep 22.pdf · uploaded 31 Oct 2022Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Sep 22.pdf · uploaded 31 Oct 2022Source
- 22 Certificates of CA (Form 3)RERA Form 3 Sep 22.pdf · uploaded 31 Oct 2022Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFlorence Commercial and Residence OC.pdf · uploaded 25 Dec 2022Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development23 and 24 OC.pdf · uploaded 7 Apr 2023Source
- 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Rera Form 1 Dec 2022.pdf · uploaded 27 Apr 2023Source
- 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2_NoCopy.pdf · uploaded 27 Apr 2023Source
- 23 Certificates of CA (Form 3)RERA Form 3 Dec 2022.pdf · uploaded 27 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Satuguru Lifespaces Form 5 FY 21-22-Signed.pdf · uploaded 16 May 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society Formation Status.pdf · uploaded 16 May 2023Source
Technical
- DocumentPlot Area and Ground Floor Plan.pdf · uploaded 29 Jul 2017Source
- Document1st Floor Plan and Podium Layout Plan.pdf · uploaded 29 Jul 2017Source
- Document2nd Floor Plan.pdf · uploaded 29 Jul 2017Source
- DocumentTypical Floor Plan and Terrace Flat Plan.pdf · uploaded 29 Jul 2017Source
- DocumentOverall Plan Section and Elevation.pdf · uploaded 29 Jul 2017Source
- DocumentPlinth Certificate.pdf · uploaded 30 Jul 2017Source
- DocumentCC 18TH Floor.pdf · uploaded 30 Jul 2017Source
- DocumentCC 2014.pdf · uploaded 30 Jul 2017Source
- DocumentMarch 2019 1.pdf · uploaded 25 Apr 2019Source
- DocumentMarch 2019 2.pdf · uploaded 25 Apr 2019Source
- DocumentMarch 2019 3.pdf · uploaded 25 Apr 2019Source
- DocumentMarch 2019 4.pdf · uploaded 25 Apr 2019Source
- DocumentMarch 2019 5.pdf · uploaded 25 Apr 2019Source
- DocumentMarch 2019 6.pdf · uploaded 25 Apr 2019Source
- DocumentTMC PLANS MAR 20.pdf · uploaded 24 Aug 2020Source
Technical (Architect)
- DocumentRera Form 1 Dec 2022.pdf · uploaded 27 Apr 2023Source
Technical (Engineer)
- DocumentRERA Form 2_NoCopy.pdf · uploaded 27 Apr 2023Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals45 3B, Survey No. 122 2B
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2 BHK A, 2 BHK B, 3 BHK A, 3 BHK B, 4 BHK A, 4 BHK B, 4 BHK C, 4 BHK D, Office 1, Office 2, Office 3, Office 4, Office 5, Office 6, Office 7, Shop 1, Shop 2, Shop 3, Shop 4, Shop 5, Shop 6, Shop 7112 units in all
- Address
- Survey No. 122 2B and 45 3B, Off Ghodbunder Road, KasarvadavliPIN 400615
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.21833, 72.97809
- Designated bank account
- 190
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- 40 mtrs wide road
- South
- Vijay Park and Nalanda School
- East
- Pristine tower
- West
- Vijay Park entrance
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking112 units
82 of 112 units booked (73%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2 BHK A | 55.85 sq m · 601 sq ft | 51 | 48 |
| 2 BHK B | 59.91 sq m · 645 sq ft | 19 | 17 |
| 3 BHK A | 73.58 sq m · 792 sq ft | 3 | 3 |
| 3 BHK B | 88.38 sq m · 951 sq ft | 1 | 0 |
| 4 BHK A | 132.46 sq m · 1,426 sq ft | 1 | 0 |
| 4 BHK B | 131.91 sq m · 1,420 sq ft | 1 | 0 |
| 4 BHK C | 148.11 sq m · 1,594 sq ft | 2 | 0 |
| 4 BHK D | 146.37 sq m · 1,576 sq ft | 1 | 0 |
Show all 22 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office 1 | 28.99 sq m · 312 sq ft | 2 | 2 |
| Office 2 | 33.85 sq m · 364 sq ft | 2 | 1 |
| Office 3 | 20.16 sq m · 217 sq ft | 2 | 0 |
| Office 4 | 20.44 sq m · 220 sq ft | 8 | 5 |
| Office 5 | 27.14 sq m · 292 sq ft | 4 | 2 |
| Office 6 | 38.93 sq m · 419 sq ft | 2 | 1 |
| Office 7 | 58.03 sq m · 625 sq ft | 2 | 0 |
| Shop 1 | 29.54 sq m · 318 sq ft | 1 | 1 |
| Shop 2 | 41.69 sq m · 449 sq ft | 1 | 0 |
| Shop 3 | 26.02 sq m · 280 sq ft | 1 | 0 |
| Shop 4 | 26.94 sq m · 290 sq ft | 4 | 2 |
| Shop 5 | 36.45 sq m · 392 sq ft | 2 | 0 |
| Shop 6 | 23.32 sq m · 251 sq ft | 1 | 0 |
| Shop 7 | 20.35 sq m · 219 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Arch. Prashant Thakkar (Manav Consultant) | — |
| Engineer | Dharmendra K. Patel (Tech Line Consultants) | — |
| Other | Gayatri Constructions | — |
Source: MahaRERA project page. Contact details are not shown.