Residential / Group Housing · 1 building · 58 unitsRERA P51700046624

Empire Heritage

Completion was pushed back 4 months, to Nov 2027; no MahaRERA orders on record; 31% of its units are booked.

Thane (M Corp.), Thane 400602 · Promoter: Lakhani Builders Pvt Ltd

DeliveryExtended 4 moPromised Jul 2027 · now due Nov 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales31% booked18 of 58 units · as the promoter reported to MahaRERA
Empire Heritage project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Nov 2027

  • This projectRegistered 25 Aug 2022, completion promised 31 Jul 2027, revised to 30 Nov 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700046624
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170004662425 Aug 202231 Jul 202730 Nov 2027Lakhani Builders Pvt LtdProject page
Documents169

1 document held by Deedo, 168 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardLBPL PAN.pdf · uploaded 26 Jul 2022Source

Legal

  • Legal Title reportTITLE CERTIFICATE - NATRAJ.pdf · uploaded 25 Jul 2022Source
  • Legal Title reportNatraj -POA0001 (1).pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA_1-25.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA 26-50 compressed.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA 51 75 compressed.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA 76 100 compressed compressed.pdf · uploaded 8 Aug 2022Source
Show all 169 documentsShow fewer documents

Legal

  • Legal Title reportNATRAJ DA 101 125 compressed.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA_126-150.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA_151-175.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA_176-200_compressed.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA 201 225.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA_226-250.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA_251-275.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA_276-300.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA_301-325.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA 326 350 compressed.pdf · uploaded 8 Aug 2022Source
  • Legal Title reportNATRAJ DA_351-end.pdf · uploaded 8 Aug 2022Source
  • Declaration Form BForm B Natraj 2000 (1).pdf · uploaded 8 Aug 2022Source

Migrated

  • 1 Copy of the legal title reportTITLE CERTIFICATE - NATRAJ.pdf · uploaded 25 Jul 2022Source
  • 1 PAN CardLBPL PAN.pdf · uploaded 26 Jul 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Natraj 2000 Arch Certificate.pdf · uploaded 26 Jul 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Natraj 2000m Engi certificate.pdf · uploaded 26 Jul 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report Natraj 2000.pdf · uploaded 26 Jul 2022Source
  • 1 Deviation Report with respect to Allotment letterNatraj 2000 No Deviation letter.pdf · uploaded 26 Jul 2022Source
  • 1 Deviation Report with respect to model copy of AgreementNatraj 2000 No Deviation letter.pdf · uploaded 26 Jul 2022Source
  • 1 Proforma of Allotment letterModel RERA Draft Agreement for FP 301.pdf · uploaded 1 Aug 2022Source
  • 2 Proforma of Allotment letterModel of Allotment Letter - FP 301.pdf · uploaded 1 Aug 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameEmpire Heritage0001.pdf · uploaded 2 Aug 2022Source
  • 1 a Details of encumbrances concerned to FinanceNo Encumbrance -2000.pdf · uploaded 7 Aug 2022Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameNo Encumbrance -2000.pdf · uploaded 7 Aug 2022Source
  • 2 Copy of the legal title reportNatraj -POA0001 (1).pdf · uploaded 8 Aug 2022Source
  • 3 Copy of the legal title reportNATRAJ DA_1-25.pdf · uploaded 8 Aug 2022Source
  • 4 Copy of the legal title reportNATRAJ DA 26-50 compressed.pdf · uploaded 8 Aug 2022Source
  • 5 Copy of the legal title reportNATRAJ DA 51 75 compressed.pdf · uploaded 8 Aug 2022Source
  • 6 Copy of the legal title reportNATRAJ DA 76 100 compressed compressed.pdf · uploaded 8 Aug 2022Source
  • 7 Copy of the legal title reportNATRAJ DA 101 125 compressed.pdf · uploaded 8 Aug 2022Source
  • 8 Copy of the legal title reportNATRAJ DA_126-150.pdf · uploaded 8 Aug 2022Source
  • 9 Copy of the legal title reportNATRAJ DA_151-175.pdf · uploaded 8 Aug 2022Source
  • 10 Copy of the legal title reportNATRAJ DA_176-200_compressed.pdf · uploaded 8 Aug 2022Source
  • 11 Copy of the legal title reportNATRAJ DA 201 225.pdf · uploaded 8 Aug 2022Source
  • 12 Copy of the legal title reportNATRAJ DA_226-250.pdf · uploaded 8 Aug 2022Source
  • 13 Copy of the legal title reportNATRAJ DA_251-275.pdf · uploaded 8 Aug 2022Source
  • 14 Copy of the legal title reportNATRAJ DA_276-300.pdf · uploaded 8 Aug 2022Source
  • 15 Copy of the legal title reportNATRAJ DA_301-325.pdf · uploaded 8 Aug 2022Source
  • 16 Copy of the legal title reportNATRAJ DA 326 350 compressed.pdf · uploaded 8 Aug 2022Source
  • 17 Copy of the legal title reportNATRAJ DA_351-end.pdf · uploaded 8 Aug 2022Source
  • 1 Declaration in FORM BForm B Natraj 2000 (1).pdf · uploaded 8 Aug 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate Empire Heritage new COMPRESSED.pdf · uploaded 8 Aug 2022Source
  • 1 Copy of Layout Approval (in case of layout)layout 1.pdf · uploaded 12 Aug 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentlayout 1.pdf · uploaded 12 Aug 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentlayout 2.pdf · uploaded 12 Aug 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentlayout 3.pdf · uploaded 12 Aug 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentlayout 4.pdf · uploaded 12 Aug 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentlayout 5.pdf · uploaded 12 Aug 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentlayout 6.pdf · uploaded 12 Aug 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentlayout 7.pdf · uploaded 12 Aug 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentlayout 8.pdf · uploaded 12 Aug 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentNatraj 2000 CC COPY.pdf · uploaded 13 Aug 2022Source
  • 1 Declaration about Commencement Certificate2000 Formate D CC declaration.pdf · uploaded 13 Aug 2022Source
  • 1 b Details of encumbrances concerned to LegalNo Encumbrance for Legal.pdf · uploaded 18 Aug 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sept 22 compressed.pdf · uploaded 13 Dec 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Project Engineer certificate - Empire Heritage - Sept 2022 (1).pdf · uploaded 17 Jan 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 12 23 COMP.pdf · uploaded 17 Mar 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 12 22_compressed.pdf · uploaded 7 Apr 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)NATRAJ 2000 31 12 23.pdf · uploaded 16 Apr 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)NATRAJ 2000 31 03 2023.pdf · uploaded 16 Apr 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Project Engineer Certificate - Empire Heritage - Dec 2022.pdf · uploaded 19 Apr 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 march23.pdf · uploaded 25 Jul 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 30 06 2023.pdf · uploaded 4 Aug 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Project Engineer Certificate - Empire Heritage - June 2023.pdf · uploaded 27 Oct 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3__-_Sept-23_Empire_Heritage.pdf · uploaded 7 Dec 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Project Engineer Certificate - Empire Heritage - Sept 2023.pdf · uploaded 12 Dec 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31 12 2023.pdf · uploaded 10 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31 03 2024.pdf · uploaded 10 May 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3__-_Dec-23_Empire_Heritage.pdf · uploaded 11 May 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Project Engineer Certificate - Empire Heritage - Sept 2023 (1).pdf · uploaded 17 May 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Project Engineer Certificate - Empire Heritage - Sept 2023 (1).pdf · uploaded 17 May 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Project Engineer Certificate - Empire Heritage - Dec 2023.pdf · uploaded 17 May 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Project Engineer Certificate - Empire Heritage - Sept 2023 (1).pdf · uploaded 17 May 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Project Engineer Certificate - Empire Heritage - Dec 2023.pdf · uploaded 17 May 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3__-_Dec-23_Empire_Heritage.pdf · uploaded 17 May 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3__RERA__Empire Heritage.pdf · uploaded 6 Dec 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)EMPIRE HERITAGE form 1 01 10 2024.pdf · uploaded 2 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)EMPIRE HERITAGE form 1 01 12 2024.pdf · uploaded 2 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)EMPIRE HERITAGE form 1 01 07 2024.pdf · uploaded 2 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3__-_June-24_Empire_Heritage.pdf · uploaded 2 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3__-_Sept-24_Empire_Heritage.pdf · uploaded 2 Feb 2025Source
  • 1 Building Plan Approval / NA Order for plotted development1 (2).pdf · uploaded 4 Feb 2025Source
  • 2 Building Plan Approval / NA Order for plotted development2 (1).pdf · uploaded 4 Feb 2025Source
  • 3 Building Plan Approval / NA Order for plotted development3 (1).pdf · uploaded 4 Feb 2025Source
  • 4 Building Plan Approval / NA Order for plotted development4 (1).pdf · uploaded 4 Feb 2025Source
  • 5 Building Plan Approval / NA Order for plotted development5 (1).pdf · uploaded 4 Feb 2025Source
  • 6 Building Plan Approval / NA Order for plotted development6 (1).pdf · uploaded 4 Feb 2025Source
  • 7 Building Plan Approval / NA Order for plotted development7 (1).pdf · uploaded 4 Feb 2025Source
  • 8 Building Plan Approval / NA Order for plotted developmentCC COPY.pdf · uploaded 4 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - EMPIRE HERITAGE 300924 (2).pdf · uploaded 19 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - EMPIRE HERITAGE 300624 (2).pdf · uploaded 19 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - EMPIRE HERITAGE 300324 (1).pdf · uploaded 19 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Dec-24 Empire Heritage.pdf · uploaded 4 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Dec-24 Empire Heritage.pdf · uploaded 6 Apr 2025Source
  • Form 1Form 1 ( 21 July 2022 ).pdf · uploaded 5 Jan 2026Source
  • Form 2Form 2 ( 30 Sep 2022 ).pdf · uploaded 5 Jan 2026Source
  • Form 3Form 3 ( 30 Sep 2022 ).pdf · uploaded 5 Jan 2026Source
  • Disclosure of Sold and Booked Inventory30-09-2022_compressed.pdf · uploaded 5 Jan 2026Source
  • Form 1Form 1 ( 31 Dec 2022 ).pdf · uploaded 5 Jan 2026Source
  • Form 2Form 2 ( 31 Dec 2022 ).pdf · uploaded 5 Jan 2026Source
  • Form 3form 3 ( 31 Dec 2022 ).pdf · uploaded 5 Jan 2026Source
  • Disclosure of Sold and Booked Inventory31-12-2022_compressed.pdf · uploaded 5 Jan 2026Source
  • Form 1Form 1 ( 31 March 2023 ).pdf · uploaded 5 Jan 2026Source
  • Form 2Form 2 ( 5 Jan 2023 ).pdf · uploaded 5 Jan 2026Source
  • Form 3Form 3 ( 31 MARCH 2023 ).pdf · uploaded 5 Jan 2026Source
  • Disclosure of Sold and Booked Inventory31-03-2023_compressed.pdf · uploaded 5 Jan 2026Source
  • Form 1Form 1 ( 30 June 2023 ).pdf · uploaded 5 Jan 2026Source
  • Form 2Form 2 ( 30 June 2023 ).pdf · uploaded 5 Jan 2026Source
  • Form 3Form 3 ( 30 JUNE 2023 ).pdf · uploaded 5 Jan 2026Source
  • Disclosure of Sold and Booked Inventory30-06-2023_compressed.pdf · uploaded 5 Jan 2026Source
  • Form 1Form 1 ( 30 Sep 23 ).pdf · uploaded 5 Jan 2026Source
  • Form 2Form 2 ( 30 Sep 2023 ).pdf · uploaded 5 Jan 2026Source
  • Form 3Form 3 ( 30 Sep 2023 ).pdf · uploaded 5 Jan 2026Source
  • Disclosure of Sold and Booked Inventory30-09-2023_compressed.pdf · uploaded 5 Jan 2026Source
  • Form 1From 1 ( 31 Dec 2023 ).pdf · uploaded 5 Jan 2026Source
  • Form 2Form 2 ( 31 Dec 2023 ).pdf · uploaded 5 Jan 2026Source
  • Form 3Form 3 ( 31 Dec 2023 ).pdf · uploaded 5 Jan 2026Source
  • Disclosure of Sold and Booked Inventory31-12-2023_compressed.pdf · uploaded 5 Jan 2026Source
  • Form 1Form 1 ( 31 March 2024 ).pdf · uploaded 5 Jan 2026Source
  • Form 2Form 2 ( 31 March 2024 ).pdf · uploaded 5 Jan 2026Source
  • Form 3Form 3 ( 31 March 2024 ).pdf · uploaded 5 Jan 2026Source
  • Disclosure of Sold and Booked Inventory31-03-2024_compressed.pdf · uploaded 5 Jan 2026Source
  • Form 1Form 1 ( 30 June 2024 ).pdf · uploaded 5 Jan 2026Source
  • Form 2Form 2 ( 30 June 2024 ).pdf · uploaded 5 Jan 2026Source
  • Form 3Form 3 (30 June 2024).pdf · uploaded 5 Jan 2026Source
  • Disclosure of Sold and Booked Inventory30-06-2024_compressed.pdf · uploaded 5 Jan 2026Source
  • Form 1Form 1 ( 30 Sep 2024 ).pdf · uploaded 5 Jan 2026Source
  • Form 2Form 2 ( 30 sep 2024 ).pdf · uploaded 5 Jan 2026Source
  • Form 3Form 3 ( 30 Sep 2024 ).pdf · uploaded 5 Jan 2026Source
  • Disclosure of Sold and Booked Inventory30-09-2024_compressed.pdf · uploaded 5 Jan 2026Source
  • Form 2A (FY 2022-2023)Heritage form 2A heritage 31032023.pdf · uploaded 25 Jan 2026Source
  • Form 2A (FY 2023-2024)Heritage form 2A 31 0 24.pdf · uploaded 25 Jan 2026Source
  • Form 2A (FY 2024-2025)Quality Assurence certificate form 2A heritage 31 032025.pdf · uploaded 25 Jan 2026Source
  • Form 5 (FY 2023-2024)Form 5_FY 2023-24_Heritage.pdf · uploaded 25 Jan 2026Source
  • Form 5 (FY 2022-2023)Form5_Empire Heritage_22-23.pdf · uploaded 29 Jan 2026Source
  • Form 5 (FY 2024-2025)Form 5_FY 2024-25_Dynasty.pdf · uploaded 29 Jan 2026Source

Technical

  • Documentlayout 1.pdf · uploaded 12 Aug 2022Source
  • Documentlayout 1.pdf · uploaded 12 Aug 2022Source
  • Documentlayout 2.pdf · uploaded 12 Aug 2022Source
  • Documentlayout 3.pdf · uploaded 12 Aug 2022Source
  • Documentlayout 4.pdf · uploaded 12 Aug 2022Source
  • Documentlayout 5.pdf · uploaded 12 Aug 2022Source
  • Documentlayout 6.pdf · uploaded 12 Aug 2022Source
  • Documentlayout 7.pdf · uploaded 12 Aug 2022Source
  • Documentlayout 8.pdf · uploaded 12 Aug 2022Source
  • Document1 (2).pdf · uploaded 4 Feb 2025Source
  • Document2 (1).pdf · uploaded 4 Feb 2025Source
  • Document3 (1).pdf · uploaded 4 Feb 2025Source
  • Document4 (1).pdf · uploaded 4 Feb 2025Source
  • Document5 (1).pdf · uploaded 4 Feb 2025Source
  • Document6 (1).pdf · uploaded 4 Feb 2025Source
  • Document7 (1).pdf · uploaded 4 Feb 2025Source
  • DocumentCC COPY.pdf · uploaded 4 Feb 2025Source

Technical (Architect)

  • DocumentForm 1 31 03 2024.pdf · uploaded 10 May 2024Source
  • DocumentEMPIRE HERITAGE form 1 01 07 2024.pdf · uploaded 2 Feb 2025Source
  • DocumentEMPIRE HERITAGE form 1 01 10 2024.pdf · uploaded 2 Feb 2025Source
  • DocumentEMPIRE HERITAGE form 1 01 12 2024.pdf · uploaded 2 Feb 2025Source

Technical (Engineer)

  • DocumentProject Engineer Certificate - Empire Heritage - Dec 2023.pdf · uploaded 17 May 2024Source
  • DocumentFORM 2 - EMPIRE HERITAGE 300324 (1).pdf · uploaded 19 Feb 2025Source
  • DocumentFORM 2 - EMPIRE HERITAGE 300624 (2).pdf · uploaded 19 Feb 2025Source
  • DocumentFORM 2 - EMPIRE HERITAGE 300924 (2).pdf · uploaded 19 Feb 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals301

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK58 units in all
Address
301, Service Road, PanchpakadiPIN 400602
Village
Thane (M Corp.), Thane taluka
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

301

Boundaries

North
Fp No 302
South
Fp No 299
East
Road
West
Fp No 300a And Fp No 300b

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking58 units

18 of 58 units booked (31%), as the promoter reported to MahaRERA

2BHK · 43 units3BHK · 15 units
TypeCarpet areaUnitsBooked
2BHK61.61 sq m · 663 sq ft143
2BHK63.45 sq m · 683 sq ft150
2BHK64.25 sq m · 692 sq ft1411
3BHK79.18 sq m · 852 sq ft144
3BHK109.4 sq m · 1,178 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnil Jagwani—
ArchitectArchetype Consultants (I) Pvt Ltd—
Chartered accountantKPGA Associates—
EngineerMahimtura Consultants Pvt Ltd—
EngineerRoshan Ramesh Mohite—

Source: MahaRERA project page. Contact details are not shown.