Shambhu Shankar Residency

Certificate Signed

Sonale, Thane 421305 |Promoter: Vidisha Constructions

4 Aug 2022Registered with MahaRERA
20 Dec 2026Promised completion
20 Apr 2027Revised completionPushed back 4 months
1Building
272Units registered214 booked (79%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, 2BHK LANDOWNER, 3BHK, 3BHK LANDOWNER, Shop, Shop landowner272 units in all
Address
Survey No 69 Hissa No 1/1, Bhadwad Sonale Road, BhadwadPIN 421305
Designated bank account
220
Developed in phases
No

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
4 Aug 2022
Promised
20 Dec 2026
Revised
20 Apr 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000464544 Aug 202220 Dec 202620 Apr 2027Vidisha ConstructionsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shambhu Shankar Residency14272

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

214 of 272 units booked (79%), as the promoter reported to MahaRERA

1BHK · 178 units2BHK · 39 units2BHK LANDOWNER · 23 units3BHK · 8 units3BHK LANDOWNER · 5 unitsShop · 11 unitsShop landowner · 8 units
TypeCarpet areaUnitsBooked
1BHK29.96 sq m · 322 sq ft3939
1BHK29.97 sq m · 323 sq ft139139
2BHK38.82 sq m · 418 sq ft82
2BHK38.84 sq m · 418 sq ft87
2BHK39.42 sq m · 424 sq ft1611
2BHK48.07 sq m · 517 sq ft76
2BHK LANDOWNER38.82 sq m · 418 sq ft40
2BHK LANDOWNER38.84 sq m · 418 sq ft50
Show all 28 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK LANDOWNER39.42 sq m · 424 sq ft90
2BHK LANDOWNER48.07 sq m · 517 sq ft50
3BHK59.97 sq m · 646 sq ft82
3BHK LANDOWNER59.97 sq m · 646 sq ft50
Shop11.02 sq m · 119 sq ft11
Shop11.27 sq m · 121 sq ft20
Shop12.15 sq m · 131 sq ft11
Shop12.58 sq m · 135 sq ft11
Shop14.18 sq m · 153 sq ft11
Shop16.66 sq m · 179 sq ft22
Shop18.75 sq m · 202 sq ft11
Shop22.44 sq m · 242 sq ft11
Shop32.25 sq m · 347 sq ft10
Shop landowner13.45 sq m · 145 sq ft20
Shop landowner13.85 sq m · 149 sq ft10
Shop landowner16.56 sq m · 178 sq ft10
Shop landowner19.32 sq m · 208 sq ft10
Shop landowner20.95 sq m · 226 sq ft10
Shop landowner21.73 sq m · 234 sq ft10
Shop landowner22.82 sq m · 246 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 131 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN Cardvidisha constructions pan card.pdf · uploaded 1 Jul 2022Source

Legal

  • Declaration Form BFORM B PROMOTER_compressed.pdf · uploaded 1 Jul 2022Source
  • Legal Title reporttitle 1_title 2_merged (1)_compressed (1).pdf · uploaded 4 Jul 2022Source
  • Declaration Form BFORM B SHAMIM SHAMBHU SHANKER.pdf · uploaded 16 Dec 2024Source
  • Declaration Form BFORM B LANDOWNERS --SHAMBHU SHANKER.pdf · uploaded 16 Dec 2024Source
  • Declaration Form BSHAMBHU SHANKER FORM B LANDLORD.pdf · uploaded 28 Feb 2025Source
Show all 133 documentsShow fewer documents

Legal

  • Declaration Form BSHAMBHU SHANKER FORM B PROMOTER.pdf · uploaded 28 Feb 2025Source

Migrated

  • 1 PAN Cardvidisha constructions pan card.pdf · uploaded 1 Jul 2022Source
  • 1 b Details of encumbrances concerned to LegalShambhu Shankar No Encumbrance.pdf · uploaded 1 Jul 2022Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 1 Jul 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan Sheet 1.pdf · uploaded 1 Jul 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan Sheet 2.pdf · uploaded 1 Jul 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan Sheet 3.pdf · uploaded 1 Jul 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan Sheet 4.pdf · uploaded 1 Jul 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 1 Jul 2022Source
  • 1 Declaration about Commencement CertificateFORMATD_compressed.pdf · uploaded 1 Jul 2022Source
  • 1 Declaration in FORM BFORM B PROMOTER_compressed.pdf · uploaded 1 Jul 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200241237994_For_Asset_Based_Search_01_07_2022_18_34_20_809.pdf · uploaded 1 Jul 2022Source
  • 1 Deviation Report with respect to model copy of AgreementNO DEVIATION MODEL AGREEMNET.pdf · uploaded 1 Jul 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1_compressed.pdf · uploaded 2 Jul 2022Source
  • 1 Copy of the legal title reporttitle 1_title 2_merged (1)_compressed (1).pdf · uploaded 4 Jul 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2_compressed.pdf · uploaded 4 Jul 2022Source
  • 1 Proforma of Allotment letterALLOTMENT LETTER_compressed (2).pdf · uploaded 4 Jul 2022Source
  • 1 a Details of encumbrances concerned to FinanceNO ENCUMBRANCES FINANCE.pdf · uploaded 12 Jul 2022Source
  • 1 Deviation Report with respect to Allotment letterNO DEVIATION ALLOTMENT LETTER.pdf · uploaded 12 Jul 2022Source
  • 2 Proforma of Allotment letterAgreementAS_PER_ANNEXURE_A.pdf · uploaded 18 Jul 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 29 Jul 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSEPARATED.pdf · uploaded 29 Jul 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_30-09-2022.pdf · uploaded 12 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_31-12-2022.pdf · uploaded 12 Dec 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_31-03-2023.pdf · uploaded 12 Dec 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_30-06-2023.pdf · uploaded 12 Dec 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_30-09-2023.pdf · uploaded 12 Dec 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_30-09-2022.pdf · uploaded 12 Dec 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_31-12-2022.pdf · uploaded 12 Dec 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_31-03-2023.pdf · uploaded 12 Dec 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_30-06-2023.pdf · uploaded 12 Dec 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_30-09-2023.pdf · uploaded 12 Dec 2023Source
  • 1 Disclosure of sold/ booked inventoryShambhu Shankar Residency Inventory001.pdf · uploaded 12 Dec 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 30-09-2022001_11zon.pdf · uploaded 12 Dec 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 31-12-2022001_11zon.pdf · uploaded 12 Dec 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 31-03-2023001_11zon.pdf · uploaded 12 Dec 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 30-06-2023001_11zon.pdf · uploaded 12 Dec 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 30-09-2023001_11zon.pdf · uploaded 12 Dec 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)SSR 2A 2023.pdf · uploaded 18 Dec 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form 3 SEPT 2022.pdf · uploaded 18 Dec 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form 3 DEC 22.pdf · uploaded 18 Dec 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form 3 MARCH 23.pdf · uploaded 18 Dec 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR FORM 3 JUNE 2023.pdf · uploaded 18 Dec 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form 3 SEPT 2023.pdf · uploaded 18 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)SSR Form 5 - 31-03-2023.pdf · uploaded 18 Dec 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHAMBHU SHANKAR FORM 1 DEC 23.pdf · uploaded 1 Feb 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHAMBHU SHANKAR FORM 2 DEC 23.pdf · uploaded 1 Feb 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHAMBHU SHANKAR FORM 3 DEC 23_11zon.pdf · uploaded 1 Feb 2024Source
  • 2 Declaration in FORM BFORM B LANDOWNERS --SHAMBHU SHANKER.pdf · uploaded 16 Dec 2024Source
  • 1 Declaration in FORM BFORM B SHAMIM SHAMBHU SHANKER.pdf · uploaded 16 Dec 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SHAMBHU MARCH 24.pdf · uploaded 16 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEPT 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)11zon_JPEG-to-PDF (21).pdf · uploaded 16 Dec 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SEPT 24 SHAMBHU SHANKER_11zon.pdf · uploaded 16 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 JUNE 2024 SHAMBHU SHANKER_11zon.pdf · uploaded 16 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MARCH SHAMBHU SHANKER_11zon.pdf · uploaded 16 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SHAMBHU MARCH 24.pdf · uploaded 16 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 JUNE 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEPT 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
  • 2 Disclosure of sold/ booked inventorySSR STOCK LIST.pdf · uploaded 16 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A--MARCH 24.pdf · uploaded 16 Dec 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnn A - Abhishek Dwivedi.pdf · uploaded 23 Dec 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsAnn A - Shamim Khan.pdf · uploaded 23 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 23 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHAMBHU SHANKAR - FORM 1 DEC 2024.pdf · uploaded 10 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHAMBHU SHANKAR - FORM 3 DEC 2024_11zon.pdf · uploaded 10 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHAMBHU SHANKAR FORM 2 DEC 2024.pdf · uploaded 10 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySHAMBHU SHANKAR- DIS FOR SOLD UNSOLD 31 12 2024.pdf · uploaded 10 Feb 2025Source
  • 1 Declaration in FORM BSHAMBHU SHANKER FORM B LANDLORD.pdf · uploaded 28 Feb 2025Source
  • 2 Declaration in FORM BSHAMBHU SHANKER FORM B PROMOTER.pdf · uploaded 28 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryGetUserDocumentFileContent (11).pdf · uploaded 3 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 31-03-25.pdf · uploaded 3 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_11zon.pdf · uploaded 3 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 31-03-25.pdf · uploaded 3 May 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - 31-03-25.pdf · uploaded 3 May 2025Source
  • Form 11 SHAMBHU SHANKAR - FORM 1 DEC 2024.pdf · uploaded 2 Jul 2025Source
  • Form 22 SHAMBHU SHANKAR FORM 2 DEC 2024.pdf · uploaded 2 Jul 2025Source
  • Form 33 SHAMBHU SHANKAR - FORM 3 DEC 2024_11zon.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventorySSR Sold Inventory.pdf · uploaded 2 Jul 2025Source
  • Form 1FORM 1 SEPT 24 SHAMBHU.pdf · uploaded 2 Jul 2025Source
  • Form 2FORM 2 SEPT 24 SHAMBHU.pdf · uploaded 2 Jul 2025Source
  • Form 3FORM 3 SEPT 24 SHAMBHU SHANKER_11zon.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventorySSR STOCK LIST.pdf · uploaded 2 Jul 2025Source
  • Form 1FORM 1 JUNE 24 SHAMBHU.pdf · uploaded 2 Jul 2025Source
  • Form 2FORM 2 JUNE 24 SHAMBHU.pdf · uploaded 2 Jul 2025Source
  • Form 3FORM 3 JUNE 2024 SHAMBHU SHANKER_11zon.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventorySSR STOCK LIST.pdf · uploaded 2 Jul 2025Source
  • Form 112 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 5 Aug 2025Source
  • Form 318 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 5 Aug 2025Source
  • Form 212 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 5 Aug 2025Source
  • Disclosure of Sold and Booked Inventory4 Disclosure of sold_ booked inventory.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 1Form-1 30-06-25 shanbhu.pdf · uploaded 1 Dec 2025Source
  • Withdrawal Update Form 1form 3 sept 25 shambhu shanker_11zon.pdf · uploaded 1 Dec 2025Source
  • Withdrawal Update Form 2Form-2 30-06-25 shanbhu.pdf · uploaded 1 Dec 2025Source
  • Withdrawal Update Form 2Form-2 30-09-25 shambhu.pdf · uploaded 1 Dec 2025Source
  • Withdrawal Update Form 3Form-3 30-06-25_11zon.pdf · uploaded 1 Dec 2025Source
  • Withdrawal Update Form 3form 3 sept 25 shambhu shanker_11zon.pdf · uploaded 1 Dec 2025Source
  • Form 2A (FY 2024-2025)Quality Assurance Certificate_001.pdf · uploaded 3 Dec 2025Source
  • Form 5 (FY 2024-2025)form 5 signed 2025.pdf · uploaded 4 Dec 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 28 Mar 2026Source
  • Withdrawal Update Form 2Form -2.pdf · uploaded 28 Mar 2026Source
  • Withdrawal Update Form 3shambhu shanker form 3 dec 25.pdf · uploaded 28 Mar 2026Source
  • Withdrawal Update Form 1FORM 1 - SHAMBHU SHANKAR - VIDISHA - MARCH 2026.pdf · uploaded 1 Jun 2026Source
  • Withdrawal Update Form 2FORM 2 - SHAMBHU SHANKAR - VIDISHA - MARH 2026.pdf · uploaded 1 Jun 2026Source
  • Withdrawal Update Form 3FORM 3 - SHAMBHU SHANKAR - VIDISHA - MARCH 26_11zon.pdf · uploaded 1 Jun 2026Source

Technical

  • DocumentLayout Plan.pdf · uploaded 1 Jul 2022Source
  • DocumentPlan Sheet 1.pdf · uploaded 1 Jul 2022Source
  • DocumentPlan Sheet 2.pdf · uploaded 1 Jul 2022Source
  • DocumentPlan Sheet 3.pdf · uploaded 1 Jul 2022Source
  • DocumentPlan Sheet 4.pdf · uploaded 1 Jul 2022Source
  • DocumentFURTHER CC SSR.pdf · uploaded 28 Mar 2026Source
  • OthersFURTHER CC SSR.pdf · uploaded 28 Mar 2026Source

Technical (Architect)

  • DocumentFORM 1 SHAMBHU MARCH 24.pdf · uploaded 16 Dec 2024Source
  • DocumentFORM 1 JUNE 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
  • DocumentFORM 1 SEPT 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
  • DocumentSHAMBHU SHANKAR - FORM 1 DEC 2024.pdf · uploaded 10 Feb 2025Source
  • DocumentForm 1 - 31-03-25.pdf · uploaded 3 May 2025Source
  • DocumentFORM 1 - SHAMBHU SHANKAR - VIDISHA - MARCH 2026.pdf · uploaded 1 Jun 2026Source

Technical (Engineer)

  • DocumentFORM 2 SHAMBHU MARCH 24.pdf · uploaded 16 Dec 2024Source
  • DocumentFORM 2 JUNE 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
  • DocumentFORM 2 SEPT 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
  • DocumentSHAMBHU SHANKAR FORM 2 DEC 2024.pdf · uploaded 10 Feb 2025Source
  • DocumentForm 2 - 31-03-25.pdf · uploaded 3 May 2025Source
  • DocumentFORM 2 - SHAMBHU SHANKAR - VIDISHA - MARH 2026.pdf · uploaded 1 Jun 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sonale, Bhiwandi taluka

Survey, CTS, gat or plot numbers

SURVEY NO 69 HISSA NO 1/1

Boundaries

North
Maharashtra Government
South
60 Ft Dp Road
East
69 P Road
West
Existing Right Of Way

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Architectshamim ahmed khan—
Chartered accountantMukesh Soni & Associates—
Chartered accountantNitin Balaji Dhavan—
EngineerIshtiyque Ahmed Ansari—
EngineerShamim Ahmed Khan—

Source: MahaRERA project page. Contact details are not shown.