Shambhu Shankar Residency
Certificate SignedSonale, Thane 421305 |Promoter: Vidisha Constructions
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 2BHK, 2BHK LANDOWNER, 3BHK, 3BHK LANDOWNER, Shop, Shop landowner272 units in all
- Address
- Survey No 69 Hissa No 1/1, Bhadwad Sonale Road, BhadwadPIN 421305
- Designated bank account
- 220
- Developed in phases
- No
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 4 Aug 2022
- Promised
- 20 Dec 2026
- Revised
- 20 Apr 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700046454 | 4 Aug 2022 | 20 Dec 2026 | 20 Apr 2027 | Vidisha Constructions | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Shambhu Shankar Residency | 14 | 272 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
214 of 272 units booked (79%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 29.96 sq m · 322 sq ft | 39 | 39 |
| 1BHK | 29.97 sq m · 323 sq ft | 139 | 139 |
| 2BHK | 38.82 sq m · 418 sq ft | 8 | 2 |
| 2BHK | 38.84 sq m · 418 sq ft | 8 | 7 |
| 2BHK | 39.42 sq m · 424 sq ft | 16 | 11 |
| 2BHK | 48.07 sq m · 517 sq ft | 7 | 6 |
| 2BHK LANDOWNER | 38.82 sq m · 418 sq ft | 4 | 0 |
| 2BHK LANDOWNER | 38.84 sq m · 418 sq ft | 5 | 0 |
Show all 28 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK LANDOWNER | 39.42 sq m · 424 sq ft | 9 | 0 |
| 2BHK LANDOWNER | 48.07 sq m · 517 sq ft | 5 | 0 |
| 3BHK | 59.97 sq m · 646 sq ft | 8 | 2 |
| 3BHK LANDOWNER | 59.97 sq m · 646 sq ft | 5 | 0 |
| Shop | 11.02 sq m · 119 sq ft | 1 | 1 |
| Shop | 11.27 sq m · 121 sq ft | 2 | 0 |
| Shop | 12.15 sq m · 131 sq ft | 1 | 1 |
| Shop | 12.58 sq m · 135 sq ft | 1 | 1 |
| Shop | 14.18 sq m · 153 sq ft | 1 | 1 |
| Shop | 16.66 sq m · 179 sq ft | 2 | 2 |
| Shop | 18.75 sq m · 202 sq ft | 1 | 1 |
| Shop | 22.44 sq m · 242 sq ft | 1 | 1 |
| Shop | 32.25 sq m · 347 sq ft | 1 | 0 |
| Shop landowner | 13.45 sq m · 145 sq ft | 2 | 0 |
| Shop landowner | 13.85 sq m · 149 sq ft | 1 | 0 |
| Shop landowner | 16.56 sq m · 178 sq ft | 1 | 0 |
| Shop landowner | 19.32 sq m · 208 sq ft | 1 | 0 |
| Shop landowner | 20.95 sq m · 226 sq ft | 1 | 0 |
| Shop landowner | 21.73 sq m · 234 sq ft | 1 | 0 |
| Shop landowner | 22.82 sq m · 246 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 131 filings listed on MahaRERA's project page
Finance
- PAN Cardvidisha constructions pan card.pdf · uploaded 1 Jul 2022Source
Legal
- Declaration Form BFORM B PROMOTER_compressed.pdf · uploaded 1 Jul 2022Source
- Legal Title reporttitle 1_title 2_merged (1)_compressed (1).pdf · uploaded 4 Jul 2022Source
- Declaration Form BFORM B SHAMIM SHAMBHU SHANKER.pdf · uploaded 16 Dec 2024Source
- Declaration Form BFORM B LANDOWNERS --SHAMBHU SHANKER.pdf · uploaded 16 Dec 2024Source
- Declaration Form BSHAMBHU SHANKER FORM B LANDLORD.pdf · uploaded 28 Feb 2025Source
Show all 133 documentsShow fewer documents
Legal
- Declaration Form BSHAMBHU SHANKER FORM B PROMOTER.pdf · uploaded 28 Feb 2025Source
Migrated
- 1 PAN Cardvidisha constructions pan card.pdf · uploaded 1 Jul 2022Source
- 1 b Details of encumbrances concerned to LegalShambhu Shankar No Encumbrance.pdf · uploaded 1 Jul 2022Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 1 Jul 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan Sheet 1.pdf · uploaded 1 Jul 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan Sheet 2.pdf · uploaded 1 Jul 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan Sheet 3.pdf · uploaded 1 Jul 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan Sheet 4.pdf · uploaded 1 Jul 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 1 Jul 2022Source
- 1 Declaration about Commencement CertificateFORMATD_compressed.pdf · uploaded 1 Jul 2022Source
- 1 Declaration in FORM BFORM B PROMOTER_compressed.pdf · uploaded 1 Jul 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200241237994_For_Asset_Based_Search_01_07_2022_18_34_20_809.pdf · uploaded 1 Jul 2022Source
- 1 Deviation Report with respect to model copy of AgreementNO DEVIATION MODEL AGREEMNET.pdf · uploaded 1 Jul 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1_compressed.pdf · uploaded 2 Jul 2022Source
- 1 Copy of the legal title reporttitle 1_title 2_merged (1)_compressed (1).pdf · uploaded 4 Jul 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2_compressed.pdf · uploaded 4 Jul 2022Source
- 1 Proforma of Allotment letterALLOTMENT LETTER_compressed (2).pdf · uploaded 4 Jul 2022Source
- 1 a Details of encumbrances concerned to FinanceNO ENCUMBRANCES FINANCE.pdf · uploaded 12 Jul 2022Source
- 1 Deviation Report with respect to Allotment letterNO DEVIATION ALLOTMENT LETTER.pdf · uploaded 12 Jul 2022Source
- 2 Proforma of Allotment letterAgreementAS_PER_ANNEXURE_A.pdf · uploaded 18 Jul 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 29 Jul 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSEPARATED.pdf · uploaded 29 Jul 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_30-09-2022.pdf · uploaded 12 Dec 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_31-12-2022.pdf · uploaded 12 Dec 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_31-03-2023.pdf · uploaded 12 Dec 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_30-06-2023.pdf · uploaded 12 Dec 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)SSR_Form_1_30-09-2023.pdf · uploaded 12 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_30-09-2022.pdf · uploaded 12 Dec 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_31-12-2022.pdf · uploaded 12 Dec 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_31-03-2023.pdf · uploaded 12 Dec 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_30-06-2023.pdf · uploaded 12 Dec 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)SSR_Form_2_30-09-2023.pdf · uploaded 12 Dec 2023Source
- 1 Disclosure of sold/ booked inventoryShambhu Shankar Residency Inventory001.pdf · uploaded 12 Dec 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 30-09-2022001_11zon.pdf · uploaded 12 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 31-12-2022001_11zon.pdf · uploaded 12 Dec 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 31-03-2023001_11zon.pdf · uploaded 12 Dec 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 30-06-2023001_11zon.pdf · uploaded 12 Dec 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form3 30-09-2023001_11zon.pdf · uploaded 12 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)SSR 2A 2023.pdf · uploaded 18 Dec 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form 3 SEPT 2022.pdf · uploaded 18 Dec 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form 3 DEC 22.pdf · uploaded 18 Dec 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form 3 MARCH 23.pdf · uploaded 18 Dec 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR FORM 3 JUNE 2023.pdf · uploaded 18 Dec 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSR Form 3 SEPT 2023.pdf · uploaded 18 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)SSR Form 5 - 31-03-2023.pdf · uploaded 18 Dec 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHAMBHU SHANKAR FORM 1 DEC 23.pdf · uploaded 1 Feb 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHAMBHU SHANKAR FORM 2 DEC 23.pdf · uploaded 1 Feb 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHAMBHU SHANKAR FORM 3 DEC 23_11zon.pdf · uploaded 1 Feb 2024Source
- 2 Declaration in FORM BFORM B LANDOWNERS --SHAMBHU SHANKER.pdf · uploaded 16 Dec 2024Source
- 1 Declaration in FORM BFORM B SHAMIM SHAMBHU SHANKER.pdf · uploaded 16 Dec 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SHAMBHU MARCH 24.pdf · uploaded 16 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEPT 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)11zon_JPEG-to-PDF (21).pdf · uploaded 16 Dec 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SEPT 24 SHAMBHU SHANKER_11zon.pdf · uploaded 16 Dec 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 JUNE 2024 SHAMBHU SHANKER_11zon.pdf · uploaded 16 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MARCH SHAMBHU SHANKER_11zon.pdf · uploaded 16 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SHAMBHU MARCH 24.pdf · uploaded 16 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 JUNE 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEPT 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
- 2 Disclosure of sold/ booked inventorySSR STOCK LIST.pdf · uploaded 16 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A--MARCH 24.pdf · uploaded 16 Dec 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnn A - Abhishek Dwivedi.pdf · uploaded 23 Dec 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnn A - Shamim Khan.pdf · uploaded 23 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 23 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHAMBHU SHANKAR - FORM 1 DEC 2024.pdf · uploaded 10 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHAMBHU SHANKAR - FORM 3 DEC 2024_11zon.pdf · uploaded 10 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHAMBHU SHANKAR FORM 2 DEC 2024.pdf · uploaded 10 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySHAMBHU SHANKAR- DIS FOR SOLD UNSOLD 31 12 2024.pdf · uploaded 10 Feb 2025Source
- 1 Declaration in FORM BSHAMBHU SHANKER FORM B LANDLORD.pdf · uploaded 28 Feb 2025Source
- 2 Declaration in FORM BSHAMBHU SHANKER FORM B PROMOTER.pdf · uploaded 28 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryGetUserDocumentFileContent (11).pdf · uploaded 3 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 31-03-25.pdf · uploaded 3 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_11zon.pdf · uploaded 3 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 31-03-25.pdf · uploaded 3 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - 31-03-25.pdf · uploaded 3 May 2025Source
- Form 11 SHAMBHU SHANKAR - FORM 1 DEC 2024.pdf · uploaded 2 Jul 2025Source
- Form 22 SHAMBHU SHANKAR FORM 2 DEC 2024.pdf · uploaded 2 Jul 2025Source
- Form 33 SHAMBHU SHANKAR - FORM 3 DEC 2024_11zon.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventorySSR Sold Inventory.pdf · uploaded 2 Jul 2025Source
- Form 1FORM 1 SEPT 24 SHAMBHU.pdf · uploaded 2 Jul 2025Source
- Form 2FORM 2 SEPT 24 SHAMBHU.pdf · uploaded 2 Jul 2025Source
- Form 3FORM 3 SEPT 24 SHAMBHU SHANKER_11zon.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventorySSR STOCK LIST.pdf · uploaded 2 Jul 2025Source
- Form 1FORM 1 JUNE 24 SHAMBHU.pdf · uploaded 2 Jul 2025Source
- Form 2FORM 2 JUNE 24 SHAMBHU.pdf · uploaded 2 Jul 2025Source
- Form 3FORM 3 JUNE 2024 SHAMBHU SHANKER_11zon.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventorySSR STOCK LIST.pdf · uploaded 2 Jul 2025Source
- Form 112 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 5 Aug 2025Source
- Form 318 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 5 Aug 2025Source
- Form 212 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 5 Aug 2025Source
- Disclosure of Sold and Booked Inventory4 Disclosure of sold_ booked inventory.pdf · uploaded 5 Aug 2025Source
- Withdrawal Update Form 1Form-1 30-06-25 shanbhu.pdf · uploaded 1 Dec 2025Source
- Withdrawal Update Form 1form 3 sept 25 shambhu shanker_11zon.pdf · uploaded 1 Dec 2025Source
- Withdrawal Update Form 2Form-2 30-06-25 shanbhu.pdf · uploaded 1 Dec 2025Source
- Withdrawal Update Form 2Form-2 30-09-25 shambhu.pdf · uploaded 1 Dec 2025Source
- Withdrawal Update Form 3Form-3 30-06-25_11zon.pdf · uploaded 1 Dec 2025Source
- Withdrawal Update Form 3form 3 sept 25 shambhu shanker_11zon.pdf · uploaded 1 Dec 2025Source
- Form 2A (FY 2024-2025)Quality Assurance Certificate_001.pdf · uploaded 3 Dec 2025Source
- Form 5 (FY 2024-2025)form 5 signed 2025.pdf · uploaded 4 Dec 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 28 Mar 2026Source
- Withdrawal Update Form 2Form -2.pdf · uploaded 28 Mar 2026Source
- Withdrawal Update Form 3shambhu shanker form 3 dec 25.pdf · uploaded 28 Mar 2026Source
- Withdrawal Update Form 1FORM 1 - SHAMBHU SHANKAR - VIDISHA - MARCH 2026.pdf · uploaded 1 Jun 2026Source
- Withdrawal Update Form 2FORM 2 - SHAMBHU SHANKAR - VIDISHA - MARH 2026.pdf · uploaded 1 Jun 2026Source
- Withdrawal Update Form 3FORM 3 - SHAMBHU SHANKAR - VIDISHA - MARCH 26_11zon.pdf · uploaded 1 Jun 2026Source
Technical
- DocumentLayout Plan.pdf · uploaded 1 Jul 2022Source
- DocumentPlan Sheet 1.pdf · uploaded 1 Jul 2022Source
- DocumentPlan Sheet 2.pdf · uploaded 1 Jul 2022Source
- DocumentPlan Sheet 3.pdf · uploaded 1 Jul 2022Source
- DocumentPlan Sheet 4.pdf · uploaded 1 Jul 2022Source
- DocumentFURTHER CC SSR.pdf · uploaded 28 Mar 2026Source
- OthersFURTHER CC SSR.pdf · uploaded 28 Mar 2026Source
Technical (Architect)
- DocumentFORM 1 SHAMBHU MARCH 24.pdf · uploaded 16 Dec 2024Source
- DocumentFORM 1 JUNE 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
- DocumentFORM 1 SEPT 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
- DocumentSHAMBHU SHANKAR - FORM 1 DEC 2024.pdf · uploaded 10 Feb 2025Source
- DocumentForm 1 - 31-03-25.pdf · uploaded 3 May 2025Source
- DocumentFORM 1 - SHAMBHU SHANKAR - VIDISHA - MARCH 2026.pdf · uploaded 1 Jun 2026Source
Technical (Engineer)
- DocumentFORM 2 SHAMBHU MARCH 24.pdf · uploaded 16 Dec 2024Source
- DocumentFORM 2 JUNE 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
- DocumentFORM 2 SEPT 24 SHAMBHU.pdf · uploaded 16 Dec 2024Source
- DocumentSHAMBHU SHANKAR FORM 2 DEC 2024.pdf · uploaded 10 Feb 2025Source
- DocumentForm 2 - 31-03-25.pdf · uploaded 3 May 2025Source
- DocumentFORM 2 - SHAMBHU SHANKAR - VIDISHA - MARH 2026.pdf · uploaded 1 Jun 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Sonale, Bhiwandi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Maharashtra Government
- South
- 60 Ft Dp Road
- East
- 69 P Road
- West
- Existing Right Of Way
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | shamim ahmed khan | — |
| Chartered accountant | Mukesh Soni & Associates | — |
| Chartered accountant | Nitin Balaji Dhavan | — |
| Engineer | Ishtiyque Ahmed Ansari | — |
| Engineer | Shamim Ahmed Khan | — |
Source: MahaRERA project page. Contact details are not shown.