Omkar Planet
Deedo IDDP-THN-774HIt is due for completion in Jun 2027, with no extension on record; no MahaRERA orders on record; 14% of its units are booked.
Nerul, Thane 400706 · Promoter: Omkar Enterprises
It is due for completion in Jun 2027, with no extension on record
- This projectRegistered 26 Apr 2021, completion promised 30 Jun 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
- Omkar Planet - A Wing - Dattguru - Rehab23 floors · 136 units0% booked
- Omkar Planet - B Wing Sale Wing27 floors · 26 units85% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700029084
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700029084 | 26 Apr 2021 | 30 Jun 2027 | 30 Jun 2027 | Omkar Enterprises | Project page |
Documents223
2 documents held by Deedo, 221 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD - OMKAR ENTERPRISES.pdf · uploaded 22 Mar 2021Source
Legal
Show all 223 documentsShow fewer documents
Migrated
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE - OMKAR ENTERPRISES.pdf · uploaded 20 Mar 2021Source
- 1 PAN CardPAN CARD - OMKAR ENTERPRISES.pdf · uploaded 22 Mar 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - 1 - OMKAR ENTERPRISES.pdf · uploaded 22 Mar 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - 2 - OMKAR ENTERPRISES.pdf · uploaded 22 Mar 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE - OMKAR ENTERPRISES.pdf · uploaded 22 Mar 2021Source
- 1 Proforma of Allotment letterPROFORMA OF ALLOTMENT LETTER - OMKAR ENTERPRISES.pdf · uploaded 22 Mar 2021Source
- 1 Details of encumbrancesLETTER OF ENCUMBRANCES - OMKAR ENTERPRISES.pdf · uploaded 24 Mar 2021Source
- 1 Declaration in FORM BFORM B - OMKAR ENTERPRISES.pdf · uploaded 7 Apr 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE - OMKAR ENTERPRISES (1).pdf · uploaded 7 Apr 2021Source
- 2 Proforma of Allotment letterPROFORMA OF AGREEMENT FOR SALE - OMKAR ENTERPRISES.pdf · uploaded 14 Apr 2021Source
- 1 Copy of the legal title reportLEGAL TITLE REPORT - FORM A - OMKAR ENTERPRISES.pdf · uploaded 21 Apr 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM-5.pdf · uploaded 23 Jan 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentLAYOUT PLAN.pdf · uploaded 23 Mar 2023Source
- 3 Building Plan Approval / NA Order for plotted development2nd To 3rd Floor.pdf · uploaded 23 Mar 2023Source
- 4 Building Plan Approval / NA Order for plotted development4th TO 16th Floor.pdf · uploaded 23 Mar 2023Source
- 5 Building Plan Approval / NA Order for plotted development17th To 23th Floor.pdf · uploaded 23 Mar 2023Source
- 1 Declaration about Commencement CertificateDeclaration About CC.pdf · uploaded 3 May 2023Source
- 1 Disclosure of sold/ booked inventoryBooked Inventory.pdf · uploaded 3 May 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormate A.pdf · uploaded 3 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Omkar Entrprises Form-5.pdf · uploaded 11 Nov 2023Source
- 2 Disclosure of sold/ booked inventory03 DISCLOSURE OF SOLD - Q2Q3Q4.pdf · uploaded 13 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3.pdf · uploaded 13 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 Wing A.pdf · uploaded 17 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 Wing B.pdf · uploaded 17 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)SCAN FORM-5_FY 23-24.pdf · uploaded 10 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)SCAN FORM-5_FY 23-24.pdf · uploaded 10 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryBooked Inventory.pdf · uploaded 11 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryBooked Inventory.pdf · uploaded 11 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 16 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 16 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form-2A 23-24.pdf · uploaded 18 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form-2A 21-22.pdf · uploaded 18 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form-2A 22-23.pdf · uploaded 18 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A 23-24.pdf · uploaded 18 Nov 2024Source
- 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 18 Nov 2024Source
- 3 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 18 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form-2A 23-24.pdf · uploaded 18 Nov 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form-2A 21-22.pdf · uploaded 18 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form-2A 22-23.pdf · uploaded 18 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A 23-24.pdf · uploaded 18 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_A Wing.pdf · uploaded 14 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_B Wing.pdf · uploaded 14 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 14 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold Inventory Q3.pdf · uploaded 14 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 13 Mar 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)1-B wing Form-1- Jan to March 2023.pdf · uploaded 25 Mar 2025Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)8-B wing Form-1- Oct to Dec 2024.pdf · uploaded 25 Mar 2025Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)8-A wing Form-1- Oct to Dec 2024.pdf · uploaded 25 Mar 2025Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)7-B wing Form-1- July to Sep 2024.pdf · uploaded 25 Mar 2025Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)7-A wing Form-1- July to Sep 2024.pdf · uploaded 25 Mar 2025Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)6-B wing Form-1- April to June 2024.pdf · uploaded 25 Mar 2025Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)6-A wing Form-1- April to June 2024.pdf · uploaded 25 Mar 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)5-B wing Form-1- Jan to March 2024.pdf · uploaded 25 Mar 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)5-A wing Form-1- Jan to March 2024.pdf · uploaded 25 Mar 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)4-B wing Form-1- Oct to Dec 2023.pdf · uploaded 25 Mar 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)4-A wing Form-1- Oct to Dec 2023.pdf · uploaded 25 Mar 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)3-B wing Form-1- July to Sep 2023.pdf · uploaded 25 Mar 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)3-A wing Form-1- July to Sep 2023.pdf · uploaded 25 Mar 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)2-B wing Form-1- April to June 2023.pdf · uploaded 25 Mar 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)2-A wing Form-1- April to June 2023.pdf · uploaded 25 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1-A wing Form-1- Jan to March 2023.pdf · uploaded 25 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1- Form-2- Jan to March 2023.pdf · uploaded 25 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2- Form-2- April to June 2023.pdf · uploaded 25 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3-Form-2- July to Sep 2023.pdf · uploaded 25 Mar 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4- Form-2- Oct to Dec 2023.pdf · uploaded 25 Mar 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5- Form-2- Jan to March 2024.pdf · uploaded 25 Mar 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6- Form-2- April to June 2024.pdf · uploaded 25 Mar 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7- Form-2- July to Sep 2024.pdf · uploaded 25 Mar 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8- Form-2- Oct to Dec 2024.pdf · uploaded 25 Mar 2025Source
- 1 Declaration in FORM BForm-B Declaration promotor.pdf · uploaded 24 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1- Form-3- Jan to March 2023.pdf · uploaded 24 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)2- Form-3- April to June 2023.pdf · uploaded 24 Apr 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)3-Form-3- July to Sep 2023.pdf · uploaded 24 Apr 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)4- Form-3- Oct to Dec 2023.pdf · uploaded 24 Apr 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)5- Form-3- Jan to March 2024.pdf · uploaded 24 Apr 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)6- Form-3- April to June 2024.pdf · uploaded 24 Apr 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)7- Form-3- July to Sep 2024.pdf · uploaded 24 Apr 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)8- Form-3- Oct to Dec 2024.pdf · uploaded 24 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)9- Form-1- Jan to March 2025.pdf · uploaded 28 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)9- Form-3- Jan to March 2025_.pdf · uploaded 28 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)9- Form-2- Jan to March 2025_c.pdf · uploaded 28 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold unsold inventory till 31st March 2025.pdf · uploaded 28 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A FY 24-25_c.pdf · uploaded 28 Apr 2025Source
- Form 1Form 1 Omkar Planet June 25.pdf · uploaded 4 Feb 2026Source
- Form 2Form 2 Omkar Planet June 25.pdf · uploaded 4 Feb 2026Source
- Form 3Form 3 Omkar Planet June 25.pdf · uploaded 4 Feb 2026Source
- Disclosure of Sold and Booked InventoryDiscolsure of sold and booked June 25.pdf · uploaded 4 Feb 2026Source
- Form 1Form 1 Omkar Planet Sept 25.pdf · uploaded 4 Feb 2026Source
- Form 2Form 2 Omkar Planet Sept 25.pdf · uploaded 4 Feb 2026Source
- Form 3Form 3 Omkar Planet Sept 25.pdf · uploaded 4 Feb 2026Source
- Disclosure of Sold and Booked InventoryDiscolsure of sold and booked Sept 25.pdf · uploaded 4 Feb 2026Source
- Form 1Form 1 Omkar Planet Dec 25.pdf · uploaded 12 Feb 2026Source
- Form 2FORM 2 Omkar Planet Dec 25.pdf · uploaded 12 Feb 2026Source
- Disclosure of Sold and Booked InventoryDiscolsure of sold and booked Dec 25.pdf · uploaded 12 Feb 2026Source
- Form 3Form 3 Omkar Planet Dec 25.pdf · uploaded 12 Feb 2026Source
- Form 1Form 1 Omkar Planet June 21.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet June 21.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet June 21.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold June 21.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet Sept 21.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet Sept 21.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet Sept 21.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold Sept 21.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet Dec 21.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet Dec 21.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet Dec 21.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold Dec 21.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet March 22.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet March 22.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet March 22.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold March 22.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet June 22.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet June 22.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet June 22.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold June 22.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet Sept 22.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet Sept 22.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet Sept 22.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold Sept 22.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet Dec 22.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet Dec 22.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet Dec 22.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold Dec 22.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet March 2023.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet March 2023.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet March 2023.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold March 2023.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet June 2023.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet June 2023.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet June 2023.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold June 2023.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet Sept 2023.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet Sep 2023.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet Sep 2023.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold Sep 2023.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet Dec 2023.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet Dec 2023.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet Dec 2023.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold Dec 2023.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet March 2024.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet March 2024.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet March 2024.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold March 2024.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet June 2024.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet June 2024.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet June 2024.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold June 2024.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet Sept 2024.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet Sep 2024.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet Sep 2024.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold Sep 2024.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet Dec 2024.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet Dec 2024.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet Dec 2024.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold Dec 2024.pdf · uploaded 25 Feb 2026Source
- Form 1Form 1 Omkar Planet March 25.pdf · uploaded 25 Feb 2026Source
- Form 2Form 2 Omkar Planet March 25.pdf · uploaded 25 Feb 2026Source
- Form 3Form 3 Omkar Planet March 2025.pdf · uploaded 25 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure sold and unsold March 2025.pdf · uploaded 25 Feb 2026Source
- Form 5 (FY 2024-2025)FORM 5 FY 24-25.pdf · uploaded 5 Mar 2026Source
- Form 5 (FY 2021-2022)Form 5 FY 21-22.pdf · uploaded 11 Mar 2026Source
- Form 5 (FY 2022-2023)Form 5 FY 22-23.pdf · uploaded 11 Mar 2026Source
- Form 5 (FY 2023-2024)Form 5 FY 23-24.pdf · uploaded 11 Mar 2026Source
- Form 2A (FY 2021-2022)Form 2A FY 21-22.pdf · uploaded 24 Mar 2026Source
- Form 2A (FY 2022-2023)Form 2A FY 22-23.pdf · uploaded 24 Mar 2026Source
- Form 2A (FY 2023-2024)Form 2A FY 23-24.pdf · uploaded 24 Mar 2026Source
- Form 2A (FY 2024-2025)Form 2A FY 24-25.pdf · uploaded 24 Mar 2026Source
- Form 1Form 1 Omkar Planet March 26.pdf · uploaded 23 Apr 2026Source
- Form 2Form 2 Omkar Planet March 26.pdf · uploaded 23 Apr 2026Source
- Form 3Form 3 Omkar Planet march 26.pdf · uploaded 23 Apr 2026Source
- Disclosure of Sold and Booked InventoryDiscolsure of sold and booked March 26.pdf · uploaded 23 Apr 2026Source
- Form 5 (FY 2025-2026)Scan Form-5 FY 25-26 Omkar Ent.pdf · uploaded 15 Jun 2026Source
- Withdrawal Update Form 1Form 1 Omkar Planet June 26.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2Form 2 Omkar Planet June 26.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3Form 3 Omkar Planet June 26.pdf · uploaded 21 Jul 2026Source
Technical
- DocumentLAYOUT PLAN - OMKAR ENTERPRISE.pdf · uploaded 20 Mar 2021Source
- DocumentCOMMENCEMENT CERTIFICATE - OMKAR ENTERPRISES.pdf · uploaded 20 Mar 2021Source
- DocumentLAYOUT PLAN.pdf · uploaded 23 Mar 2023Source
- Document2nd To 3rd Floor.pdf · uploaded 23 Mar 2023Source
- Document4th TO 16th Floor.pdf · uploaded 23 Mar 2023Source
- Document17th To 23th Floor.pdf · uploaded 23 Mar 2023Source
- Documentomkar Planet new CC plan.pdf · uploaded 22 May 2026Source
Technical (Architect)
- DocumentForm 1_A Wing.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1_B Wing.pdf · uploaded 14 Feb 2025Source
- Document1-A wing Form-1- Jan to March 2023.pdf · uploaded 25 Mar 2025Source
- Document1-B wing Form-1- Jan to March 2023.pdf · uploaded 25 Mar 2025Source
- Document2-A wing Form-1- April to June 2023.pdf · uploaded 25 Mar 2025Source
- Document2-B wing Form-1- April to June 2023.pdf · uploaded 25 Mar 2025Source
- Document3-A wing Form-1- July to Sep 2023.pdf · uploaded 25 Mar 2025Source
- Document3-B wing Form-1- July to Sep 2023.pdf · uploaded 25 Mar 2025Source
- Document4-A wing Form-1- Oct to Dec 2023.pdf · uploaded 25 Mar 2025Source
- Document4-B wing Form-1- Oct to Dec 2023.pdf · uploaded 25 Mar 2025Source
- Document5-A wing Form-1- Jan to March 2024.pdf · uploaded 25 Mar 2025Source
- Document5-B wing Form-1- Jan to March 2024.pdf · uploaded 25 Mar 2025Source
- Document6-A wing Form-1- April to June 2024.pdf · uploaded 25 Mar 2025Source
- Document6-B wing Form-1- April to June 2024.pdf · uploaded 25 Mar 2025Source
- Document7-A wing Form-1- July to Sep 2024.pdf · uploaded 25 Mar 2025Source
- Document7-B wing Form-1- July to Sep 2024.pdf · uploaded 25 Mar 2025Source
- Document8-A wing Form-1- Oct to Dec 2024.pdf · uploaded 25 Mar 2025Source
- Document8-B wing Form-1- Oct to Dec 2024.pdf · uploaded 25 Mar 2025Source
- Document9- Form-1- Jan to March 2025.pdf · uploaded 28 Apr 2025Source
- DocumentForm 1 Omkar Planet June 26.pdf · uploaded 21 Jul 2026Source
Technical (Engineer)
- DocumentForm 2.pdf · uploaded 16 Nov 2024Source
- DocumentForm 2.pdf · uploaded 16 Nov 2024Source
- DocumentForm 2.pdf · uploaded 14 Feb 2025Source
- Document1- Form-2- Jan to March 2023.pdf · uploaded 25 Mar 2025Source
- Document2- Form-2- April to June 2023.pdf · uploaded 25 Mar 2025Source
- Document3-Form-2- July to Sep 2023.pdf · uploaded 25 Mar 2025Source
- Document4- Form-2- Oct to Dec 2023.pdf · uploaded 25 Mar 2025Source
- Document5- Form-2- Jan to March 2024.pdf · uploaded 25 Mar 2025Source
- Document6- Form-2- April to June 2024.pdf · uploaded 25 Mar 2025Source
- Document7- Form-2- July to Sep 2024.pdf · uploaded 25 Mar 2025Source
- Document8- Form-2- Oct to Dec 2024.pdf · uploaded 25 Mar 2025Source
- Document9- Form-2- Jan to March 2025_c.pdf · uploaded 28 Apr 2025Source
- DocumentForm 2 Omkar Planet June 26.pdf · uploaded 21 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsPLOT NO. - 16, PLOT NO. 16
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- Rehab wing a, 2BHK, 3BHK162 units in all
- Address
- Plot No. - 16, Sector No.-6, NerulPIN 400706
- Village
- Nerul, Thane taluka
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- Varuna Chs Ltd
- South
- Shivam Chs Ltd
- East
- Himalaya Chs Ltd
- West
- Sagardeep Chs Ltd
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking162 units
22 of 162 units booked (14%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Omkar Planet - A Wing - Dattguru - Rehab | Rehab wing a | 28.65 sq m · 308 sq ft | 136 | 0 |
| Omkar Planet - B Wing Sale Wing | 2BHK | 47.64 sq m · 513 sq ft | 7 | 6 |
| Omkar Planet - B Wing Sale Wing | 2BHK | 47.68 sq m · 513 sq ft | 6 | 6 |
| Omkar Planet - B Wing Sale Wing | 3BHK | 62.44 sq m · 672 sq ft | 7 | 5 |
| Omkar Planet - B Wing Sale Wing | 3BHK | 62.5 sq m · 673 sq ft | 6 | 5 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Arif Punjabi | — |
| Chartered accountant | Bhavik Jayantilal Velani | — |
| Chartered accountant | Swati Sudhendu Patel | — |
| Engineer | MAHESH SANJAY Gawali | — |
| Engineer | SHREENIVAS Karkera | — |
Source: MahaRERA project page. Contact details are not shown.