Mangeshi Ambar
Its promised completion date, Jul 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 32% of its units are booked.
Gandhare, Thane 421301 · Promoter: Mangesh Dashrath Gaikar
Its promised completion date, Jul 2026, has passed and MahaRERA does not show it completed
- This projectRegistered 7 Dec 2022, completion promised 30 Jul 2026, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700047989
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700047989 | 7 Dec 2022 | 30 Jul 2026 | 30 Jul 2026 | Mangesh Dashrath Gaikar | Project page |
Documents174
1 document held by Deedo, 173 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card .pdf · uploaded 17 Aug 2022Source
Legal
Migrated
- 1 PAN CardPan Card .pdf · uploaded 17 Aug 2022Source
- 1 Copy of the legal title reporttitle certificate_compressed.pdf · uploaded 17 Aug 2022Source
- 1 a Details of encumbrances concerned to Financedeclaration finance.pdf · uploaded 17 Aug 2022Source
- 1 b Details of encumbrances concerned to Legaldeclaration legal.pdf · uploaded 17 Aug 2022Source
Show all 174 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 17 Aug 2022Source
- 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 17 Aug 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentSKM_C364e22021908100_compressed.pdf · uploaded 17 Aug 2022Source
- 2 Commencement Certificates / NA Order for plotted development182.pdf · uploaded 17 Aug 2022Source
- 1 Declaration in FORM BForm b.pdf · uploaded 17 Aug 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samebank declaration.pdf · uploaded 17 Aug 2022Source
- 1 Deviation Report with respect to Allotment letterdeclaration alllotment letter.pdf · uploaded 17 Aug 2022Source
- 1 Deviation Report with respect to model copy of Agreementdeclaration agreement.pdf · uploaded 17 Aug 2022Source
- 1 Declaration about Commencement Certificatedeclaration of commencement.pdf · uploaded 18 Aug 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect cert.pdf · uploaded 18 Aug 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate.pdf · uploaded 18 Aug 2022Source
- 1 CERSAI detailscersai declaration.pdf · uploaded 18 Aug 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mangeshi Ambar.pdf · uploaded 21 Sep 2022Source
- 1 Proforma of Agreement for saleMangeshi Ambar Draft.pdf · uploaded 21 Sep 2022Source
- 1 Proforma of Allotment letterMangeshi Ambar Draft.pdf · uploaded 21 Sep 2022Source
- 2 Proforma of Allotment letterambar allotment.pdf · uploaded 21 Sep 2022Source
- 2 Proforma of Agreement for saleambar allotment.pdf · uploaded 21 Sep 2022Source
- 3 Proforma of Agreement for saleambar pplot.pdf · uploaded 21 Sep 2022Source
- 3 Proforma of Allotment letterambar pplot.pdf · uploaded 21 Sep 2022Source
- 1 Disclosure of sold/ booked inventoryDiscolsure of sold inventory Ambar.pdf · uploaded 9 May 2023Source
- 2 Disclosure of sold/ booked inventorySold Unsold Details_compressed (1).pdf · uploaded 8 Jul 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentscan - Copy.pdf · uploaded 29 Nov 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentS36C-913010106120.pdf · uploaded 29 Nov 2023Source
- 2 a Details of encumbrances concerned to Financeencumbrances.pdf · uploaded 13 Feb 2024Source
- 2 b Details of encumbrances concerned to Legalencumbrances.pdf · uploaded 13 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Ambar.pdf · uploaded 23 Mar 2024Source
- 4 Proforma of Agreement for saleAmber agreement.pdf · uploaded 26 Mar 2024Source
- 3 Disclosure of sold/ booked inventoryDisclosure of sold inventory_compressed.pdf · uploaded 23 Apr 2024Source
- 1 Disclosure of sold/ booked inventorySold Dteails_compressed.pdf · uploaded 30 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Dteails_compressed.pdf · uploaded 30 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySales Mis_compressed (3).pdf · uploaded 19 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 15 Jul 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 15 Jul 2025Source
- Form 1Form 1.pdf · uploaded 20 Jul 2025Source
- Form 2Form 2.pdf · uploaded 20 Jul 2025Source
- Form 3Form -3 31-12-2024_Final.pdf · uploaded 20 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Dteails_compressed.pdf · uploaded 20 Jul 2025Source
- Form 2A (FY 2022-2023)Form 2A.pdf · uploaded 22 Jul 2025Source
- Form 2A (FY 2023-2024)Form 2A.pdf · uploaded 22 Jul 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2023.pdf · uploaded 23 Jul 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2023.pdf · uploaded 23 Jul 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2023.pdf · uploaded 23 Jul 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2023.pdf · uploaded 23 Jul 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2024.pdf · uploaded 23 Jul 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 23 Jul 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2024.pdf · uploaded 23 Jul 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 23 Jul 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2025.pdf · uploaded 23 Jul 2025Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2025.pdf · uploaded 23 Jul 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2022.pdf · uploaded 23 Jul 2025Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar Mar 25 final.pdf · uploaded 23 Jul 2025Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar June 25 final.pdf · uploaded 23 Jul 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 31-12-2024_Final.pdf · uploaded 23 Jul 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar Sep 24 final.pdf · uploaded 23 Jul 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar June 24 final.pdf · uploaded 23 Jul 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar Dec 23 final.pdf · uploaded 23 Jul 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar Sep 23 final.pdf · uploaded 23 Jul 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar Jun 23 final.pdf · uploaded 23 Jul 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar Mar 23 final.pdf · uploaded 23 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar Dec 22 final.pdf · uploaded 23 Jul 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 ambar Mar 24 final.pdf · uploaded 23 Jul 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sold unsold Final.pdf · uploaded 23 Jul 2025Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 1 Disclosure of sold/ booked inventoryDiscolsure of sold inventory Ambar.pdf · uploaded 23 Jul 2025Source
- 2 Disclosure of sold/ booked inventorySold Unsold List Ambar.pdf · uploaded 23 Jul 2025Source
- 3 Disclosure of sold/ booked inventorySold Unsold List Ambar Compressed.pdf · uploaded 23 Jul 2025Source
- 4 Disclosure of sold/ booked inventorySold unsold final.pdf · uploaded 23 Jul 2025Source
- 5 Disclosure of sold/ booked inventorySales Mis_compressed.pdf · uploaded 23 Jul 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023-24-Amber final.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Dec 2022.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Mar 2023.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 June 2023.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Sept 2023.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Dec 2023.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Mar 2024.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 June 2024.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Sept 2024.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Mar 2025.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 June 2025.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar Dec 22 final.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar Mar 23 final.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar Jun 23 final.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar Sep 23 final.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar Dec 23 final.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar Mar 24 final.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar June 24 final.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar Sep 24 final.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar Mar 25 final.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 ambar June 25 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDiscolsure of sold inventory Ambar.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDiscolsure of sold inventory Ambar.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Details_compressed (1).pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold List Ambar_compressed.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold List Ambar.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold inventory.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold Final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySales Mis.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySales Mis.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 - Ambar - Sept 25.pdf · uploaded 6 Jan 2026Source
- Form 2Form 2 - Ambar - Sept 25.pdf · uploaded 6 Jan 2026Source
- Form 3Form 3 - Ambar - Sept 25.pdf · uploaded 6 Jan 2026Source
- Disclosure of Sold and Booked InventorySold-Unsold Inventory Ambar.pdf · uploaded 6 Jan 2026Source
- Form 1Form 1 - Ambar - Dec 25.pdf · uploaded 3 Feb 2026Source
- Form 2Form 2 - Ambar - Dec 25.pdf · uploaded 3 Feb 2026Source
- Form 3Form 3 - Ambar - Dec 25.pdf · uploaded 3 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure - Ambar - Dec 25.pdf · uploaded 3 Feb 2026Source
- Form 1Form 1 - Ambar - March 26..pdf · uploaded 16 May 2026Source
- Form 2Form 2 - Ambar - March 26.pdf · uploaded 16 May 2026Source
- Form 3Form 3 - Ambar - March 26.pdf · uploaded 16 May 2026Source
- Disclosure of Sold and Booked InventoryDisclosure - Ambar - March 26.pdf · uploaded 16 May 2026Source
- Form 2A (FY 2025-2026)Form 2A - Ambar - March 2026 (1).pdf · uploaded 30 Jun 2026Source
- Withdrawal Update Form 1architect cert.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2engineer certificate.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3Mangeshi Ambar.pdf · uploaded 14 Aug 2026Source
Technical
Technical (Architect)
- Documentarchitect cert.pdf · uploaded 18 Aug 2022Source
- DocumentForm 1 Dec 2022.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Mar 2023.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 June 2023.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Sept 2023.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Dec 2023.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Mar 2024.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 June 2024.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Sept 2024.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Mar 2025.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 June 2025.pdf · uploaded 23 Jul 2025Source
Technical (Engineer)
- Documentengineer certificate.pdf · uploaded 18 Aug 2022Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentSold unsold Final.pdf · uploaded 23 Jul 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsSurvey no 7 Hissa 2
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Shop222 units in all
- Address
- Survey no 7 Hissa 2, Gandhare, GandharePIN 421301
- Village
- Gandhare, Kalyan taluka
- Location
- 19.24033, 73.13054
- Designated bank account
- 200
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- 24 Mtr Wide Road
- South
- Vrundavan Pearl
- East
- Kavita Pearl
- West
- 15 Mtr Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking222 units
72 of 222 units booked (32%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 36.4 sq m · 392 sq ft | 18 | 3 |
| 1BHK | 37.05 sq m · 399 sq ft | 21 | 11 |
| 1BHK | 41.6 sq m · 448 sq ft | 42 | 13 |
| 1BHK | 49.95 sq m · 538 sq ft | 21 | 6 |
| 2BHK | 47.4 sq m · 510 sq ft | 21 | 11 |
| 2BHK | 48.3 sq m · 520 sq ft | 21 | 10 |
| 2BHK | 49.4 sq m · 532 sq ft | 42 | 6 |
| 2BHK | 52 sq m · 560 sq ft | 21 | 8 |
Show all 16 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 9.67 sq m · 104 sq ft | 1 | 1 |
| Shop | 11.6 sq m · 125 sq ft | 2 | 0 |
| Shop | 12.84 sq m · 138 sq ft | 1 | 0 |
| Shop | 12.87 sq m · 139 sq ft | 2 | 1 |
| Shop | 13.06 sq m · 141 sq ft | 1 | 1 |
| Shop | 13.86 sq m · 149 sq ft | 2 | 0 |
| Shop | 17.48 sq m · 188 sq ft | 2 | 0 |
| Shop | 21.17 sq m · 228 sq ft | 4 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vitan Consultant | — |
| Engineer | Pratik Deepak Patil | — |
Source: MahaRERA project page. Contact details are not shown.