Vaibhav
Certificate SignedBadlapur (M Cl), Thane 421503 |Promoter: Gavdevi Shelter
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Address
- S No 49 / 21 Part Plot No 1/2, Bajarpeth, Survodaya NagarPIN 421503
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 2 years and 6 months
The latest completion date on record passed 1 year and 4 months ago.
- Registered
- 24 Dec 2019
- Promised
- 30 Dec 2022
- Revised
- 30 Jun 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700023656 | 24 Dec 2019 | 30 Dec 2022 | 30 Jun 2025 | Gavdevi Shelter | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Vaibhav | 5 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Documents
2 documents held by Deedo, 122 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD SHELTER.pdf · uploaded 19 Dec 2019Source
Legal
- OtherSOCIETY (LAND OWNER) AFFIDAVIT CUM DEC.pdf · uploaded 19 Dec 2019Source
- Legal Title reportTITLE SEARCH REPORT.PDF · uploaded 19 Dec 2019Source
- Declaration Form BAFFIDAVIT CUM DECLARATION-1-converted (1).pdf · uploaded 19 Dec 2019Source
- Declaration Form BAFFIDAVIT CUM DECLATATION (FORM B)-SHELTER.pdf · uploaded 14 Dec 2023Source
Migrated
- 1 PAN CardPAN CARD SHELTER.pdf · uploaded 19 Dec 2019Source
Show all 124 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportTITLE SEARCH REPORT.PDF · uploaded 19 Dec 2019Source
- 1 Details of encumbrancesDETAILS OF ENCUMBRANCES.pdf · uploaded 19 Dec 2019Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT COPY.PDF · uploaded 19 Dec 2019Source
- 1 Building Plan Approval / NA Order for plotted developmentAPPROVAL PLAN COPY-1-converted.pdf · uploaded 19 Dec 2019Source
- 2 Building Plan Approval / NA Order for plotted developmentAPPROVAL PLAN COPY-2-converted.pdf · uploaded 19 Dec 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentBANDHKAM PARVANGI.PDF · uploaded 19 Dec 2019Source
- 1 Declaration in FORM BAFFIDAVIT CUM DECLARATION-1-converted (1).pdf · uploaded 19 Dec 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT'S CERTIFICATE- converted-min.pdf · uploaded 19 Dec 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE 5min.pdf · uploaded 19 Dec 2019Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)ENGINEER'S CERTIFICATE 5min.pdf · uploaded 19 Dec 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM -3 CA CERTIFICATE-1.pdf · uploaded 19 Dec 2019Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM -3 CA CERTIFICATE-2.pdf · uploaded 19 Dec 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)FORM - 5 2017-18.pdf · uploaded 19 Dec 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM - 5 2018-19.pdf · uploaded 19 Dec 2019Source
- 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 19 Dec 2019Source
- 2 Proforma of Allotment letterDRAFT SALE ARGEEMENT .pdf · uploaded 19 Dec 2019Source
- 1 OtherSOCIETY (LAND OWNER) AFFIDAVIT CUM DEC.pdf · uploaded 19 Dec 2019Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHELTER FORM 1.pdf · uploaded 14 Jul 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SHELTER QA.pdf · uploaded 14 Jul 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentBLUE PRINT1_.pdf · uploaded 25 Dec 2021Source
- 4 Building Plan Approval / NA Order for plotted developmentBLUE PRINT2_-compressed_compressed (1).pdf · uploaded 25 Dec 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentBUILDING PERMISSION REVISED.pdf · uploaded 25 Dec 2021Source
- 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate .pdf · uploaded 25 Dec 2021Source
- 2 Declaration about Commencement CertificateDeclaration about Commencement Certificate .pdf · uploaded 25 Dec 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineers Certificate QA Form 2A FY 2020-2021.pdf · uploaded 25 Dec 2021Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventry.pdf · uploaded 28 Dec 2021Source
- 1 Proforma of Agreement for saleProforma of Agreement for sale.pdf · uploaded 22 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Separate Bank Account - SHELTER.pdf · uploaded 7 Dec 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)RERA_11024_1.pdf · uploaded 17 Dec 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200255109801_For_Debtor_Based_Search_17_12_2022_15_49_30_756.pdf · uploaded 17 Dec 2022Source
- 1 Deviation Report with respect to Allotment letterANNEXURE 1 VAIBHAV CHSL.pdf · uploaded 17 Dec 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT CERTIFICATE1.pdf · uploaded 12 Jan 2023Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD BOOKED INVENTRY.pdf · uploaded 12 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report with respect to model copy of Agreement 1.pdf · uploaded 12 Jan 2023Source
- 2 Deviation Report with respect to model copy of AgreementDeviation Report with respect to model copy of Agreement 2.pdf · uploaded 12 Jan 2023Source
- 3 Deviation Report with respect to model copy of AgreementDeviation Report with respect to model copy of Agreement 3.pdf · uploaded 12 Jan 2023Source
- 4 Deviation Report with respect to model copy of AgreementDeviation Report with respect to model copy of Agreement 4.pdf · uploaded 12 Jan 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT CERTIFICATE1.pdf · uploaded 18 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure of Interest in Other Real Estate Organization SHELTER.pdf · uploaded 18 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceDetails of encumbrances concerned to Legal.pdf · uploaded 19 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalDetails of encumbrances concerned to Legal.pdf · uploaded 19 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 (2019-2020).pdf · uploaded 25 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 (2020-2021).pdf · uploaded 25 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 (2021-2022).pdf · uploaded 25 Jan 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 .pdf · uploaded 13 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineers Certificate FORM 2A (2023) NEW.pdf · uploaded 13 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE-1.pdf · uploaded 16 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE-5.pdf · uploaded 16 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE-6.pdf · uploaded 16 Oct 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE-6.pdf · uploaded 16 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 (07-10-2023).pdf · uploaded 23 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 (07-04-2023).pdf · uploaded 23 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (15-11-2019)_compressed.pdf · uploaded 23 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (13-07-2021)_compressed.pdf · uploaded 23 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (24-11-2022).pdf · uploaded 23 Oct 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (07-01-2023)_compressed.pdf · uploaded 23 Oct 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (07-04-2023)_compressed.pdf · uploaded 23 Oct 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (07-07-2023)_compressed.pdf · uploaded 23 Oct 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (7-10-2023).pdf · uploaded 23 Oct 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SHELTER NEW_compressed.pdf · uploaded 8 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 FOR SHELTER NEW.pdf · uploaded 8 Nov 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A JAN.pdf · uploaded 13 Dec 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A APR-S.pdf · uploaded 13 Dec 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A OCT -S.pdf · uploaded 13 Dec 2023Source
- 2 Declaration in FORM BAFFIDAVIT CUM DECLATATION (FORM B)-SHELTER.pdf · uploaded 14 Dec 2023Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTRY.pdf · uploaded 14 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 -SHELTER.pdf · uploaded 18 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 -SHELTER.pdf · uploaded 18 Dec 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 APRIL.pdf · uploaded 18 Jul 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JULY.pdf · uploaded 18 Jul 2024Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD JULY.pdf · uploaded 18 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 APRIL.pdf · uploaded 20 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 JULY.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A APRIL.pdf · uploaded 20 Jul 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A JULY.pdf · uploaded 20 Jul 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A JULY.pdf · uploaded 20 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 APRILLL.pdf · uploaded 20 Jul 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 JULYYY.pdf · uploaded 20 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf · uploaded 13 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect’s Certificate Form 1.pdf · uploaded 15 Oct 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3.pdf · uploaded 15 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer’s Certificate Form 2.pdf · uploaded 15 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 SHELTER APRIL 2024.pdf · uploaded 15 Oct 2024Source
- 1 Disclosure of sold/ booked inventorypdf2.pdf · uploaded 15 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1 SHEL OCT 24.pdf · uploaded 22 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 SHEL JAN 25.pdf · uploaded 22 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)23-12 infra.pdf · uploaded 22 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)2-1 infra_compressed.pdf · uploaded 22 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)23-12 gavdevi vaibhav_compressed.pdf · uploaded 22 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)2-1 gavdevi vaibhav_compressed.pdf · uploaded 22 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 2 SHEL` OCT 24.pdf · uploaded 22 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 2 SHEL JAN 25.pdf · uploaded 22 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)F 2A SHEL OCT 24.pdf · uploaded 22 Feb 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)F 2A SHEL JAN 25.pdf · uploaded 22 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySHELTER SOLD UNSOLD.pdf · uploaded 7 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 S.pdf · uploaded 11 May 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 S.pdf · uploaded 11 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SHELTER.pdf · uploaded 11 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 13 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A.pdf · uploaded 13 May 2025Source
Technical
- DocumentLAYOUT COPY.PDF · uploaded 19 Dec 2019Source
- DocumentAPPROVAL PLAN COPY-1-converted.pdf · uploaded 19 Dec 2019Source
- DocumentAPPROVAL PLAN COPY-2-converted.pdf · uploaded 19 Dec 2019Source
- DocumentBLUE PRINT1_.pdf · uploaded 25 Dec 2021Source
- DocumentBLUE PRINT2_-compressed_compressed (1).pdf · uploaded 25 Dec 2021Source
Technical (Architect)
- DocumentFORM 1 JULY.pdf · uploaded 18 Jul 2024Source
- DocumentArchitect’s Certificate Form 1.pdf · uploaded 15 Oct 2024Source
- DocumentF1 SHEL OCT 24.pdf · uploaded 22 Feb 2025Source
- DocumentF 1 SHEL JAN 25.pdf · uploaded 22 Feb 2025Source
- DocumentFORM 1 S.pdf · uploaded 11 May 2025Source
- DocumentFORM 1 S.pdf · uploaded 11 May 2025Source
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Badlapur (M Cl), Ambarnath taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- S No 49 H No 18
- South
- Plot No 2
- East
- 9 M Road
- West
- S No 49 H No 21
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sachin Vilas Sahane | — |
| Chartered accountant | Pradeep Mehta | — |
| Chartered accountant | Shivani Khaicha & Co | — |
| Chartered accountant | Vineet Dubey & Associates | — |
| Engineer | Darshan Kasture Saad Consultant | — |
| Engineer | Mangesh S Deorukhakar | — |
| Other | Vijay Salve | — |
Source: MahaRERA project page. Contact details are not shown.