Panvelkar Estate - Greenford - E Wing
Certificate SignedBadlapur (M Cl), Thane 421503 |Promoter: Panvelkar Infrastructures Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- —95 units in all
- Address
- Survey No 42 Hissa No 2 and 3, MIDC Road, MankivaliPIN 421503
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Jun 2026
The latest completion date on record passed 4 months ago.
- Registered
- 2 Feb 2022
- Promised
- 30 Jun 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700032902 | 2 Feb 2022 | 30 Jun 2026 | 30 Jun 2026 | Panvelkar Infrastructures Private Limited | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Greenford E Wing | 13 | 95 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
95 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 95 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 142 filings listed on MahaRERA's project page
Finance
- PAN CardPIPL PAN.pdf · uploaded 13 Dec 2021Source
Legal
Migrated
- 1 PAN CardPIPL PAN.pdf · uploaded 13 Dec 2021Source
- 1 Details of encumbrancesEncumbrance certificate-signed.pdf · uploaded 13 Dec 2021Source
- 1 Copy of Layout Approval (in case of layout)Sheet 1_compressed.pdf · uploaded 13 Dec 2021Source
- 2 Copy of Layout Approval (in case of layout)Sheet 2_compressed.pdf · uploaded 13 Dec 2021Source
Show all 143 documentsShow fewer documents
Migrated
- 3 Copy of Layout Approval (in case of layout)Sheet 3_compressed.pdf · uploaded 13 Dec 2021Source
- 4 Copy of Layout Approval (in case of layout)Sheet 4_compressed.pdf · uploaded 13 Dec 2021Source
- 5 Copy of Layout Approval (in case of layout)Sheet 5_compressed.pdf · uploaded 13 Dec 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentSheet 1_compressed.pdf · uploaded 13 Dec 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentSheet 2_compressed.pdf · uploaded 13 Dec 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentSheet 3_compressed.pdf · uploaded 13 Dec 2021Source
- 4 Building Plan Approval / NA Order for plotted developmentSheet 4_compressed.pdf · uploaded 13 Dec 2021Source
- 5 Building Plan Approval / NA Order for plotted developmentSheet 5_compressed.pdf · uploaded 13 Dec 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentRevised CC ( Greenford).pdf · uploaded 13 Dec 2021Source
- 1 Declaration about Commencement CertificateDeclaration about CC ( Greenford revised).pdf · uploaded 13 Dec 2021Source
- 1 Declaration in FORM BForm B Affidavit.pdf · uploaded 13 Dec 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford Architect Certificate E Wing.pdf · uploaded 13 Dec 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Greenfod E Engineer certificate.pdf · uploaded 13 Dec 2021Source
- 1 CERSAI detailsCERSAI_Search_Report_200225812276_For_Asset_Based_Search_13_12_2021_19_21_08_509.pdf · uploaded 13 Dec 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)PIPL Greenford E Wing CA Certificate_compressed.pdf · uploaded 13 Dec 2021Source
- 1 Proforma of Allotment letterallotement letter format.pdf · uploaded 13 Dec 2021Source
- 2 Proforma of Allotment letterFlat Sale agreement draft.pdf · uploaded 13 Dec 2021Source
- 1 Copy of the legal title reportRevised title New.pdf · uploaded 24 Jan 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Greenford E Wing_compressed.pdf · uploaded 15 Oct 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Greenford E Wing_compressed.pdf · uploaded 15 Oct 2022Source
- 1 Disclosure of sold/ booked inventoryGreenford E Sold Unsold.pdf · uploaded 26 Nov 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford E Wing_Oct To Dec 22_compressed.pdf · uploaded 12 Jan 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Greenford Wing E Form 2 (Dec Qtr).pdf · uploaded 12 Jan 2023Source
- 2 Disclosure of sold/ booked inventoryGreenford E Sold Unsold Dec 22.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Greenford Wing E-2021-22.pdf · uploaded 26 Jan 2023Source
- 1 Proforma of Agreement for saleGreenford E Agreement for sale.pdf · uploaded 12 Apr 2023Source
- 1 Deviation Report with respect to Allotment letterNo Deviation letter ( Allotment letter).pdf · uploaded 12 Apr 2023Source
- 1 Deviation Report with respect to model copy of AgreementNo Deviation letter (Agreement for sale).pdf · uploaded 12 Apr 2023Source
- 3 Disclosure of sold/ booked inventorypanvelkar greenford wing E.pdf · uploaded 14 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford Wing E Form 1_compressed.pdf · uploaded 3 May 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Greenford Wing E_Jan To March 23.pdf · uploaded 9 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 Greenford E Wing_March 23.pdf · uploaded 9 May 2023Source
- 4 Disclosure of sold/ booked inventoryGreenford E Wing.pdf · uploaded 18 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Greenford E Form 2A (M22).pdf · uploaded 29 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Greenford E Form 2A (M23).pdf · uploaded 29 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford E Wing Form 1.pdf · uploaded 4 Aug 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Greenford E Form 2 (Apr To June) (2).pdf · uploaded 23 Aug 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford E Wing Form 1_July To Sept 23_compressed.pdf · uploaded 11 Oct 2023Source
- 5 Disclosure of sold/ booked inventoryGreenford E Wing July To Sept 23.pdf · uploaded 17 Oct 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Greenford Wing E Form 2 (July To Sept 23).pdf · uploaded 6 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Greenford Wing E as on Sept 2023.pdf · uploaded 28 Dec 2023Source
- 6 Disclosure of sold/ booked inventoryGreenford E Sold Unsold.pdf · uploaded 12 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford Wing E F1 Dec.pdf · uploaded 17 Jan 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 2 Draft - Greenford Wing E.pdf · uploaded 12 Apr 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford Wing E Form 1 Jan To March 24.pdf · uploaded 12 Apr 2024Source
- 7 Disclosure of sold/ booked inventoryGreenford Wing E Sold Unsold Jan To March 24.pdf · uploaded 15 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Greenford Wing E Form 2 (Jan To March 24).pdf · uploaded 21 May 2024Source
- 8 Disclosure of sold/ booked inventoryGreenford Wing E Sold Unsold Apr To June 24.pdf · uploaded 9 Jul 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Greenford E Wing March 24 Qtr.pdf · uploaded 7 Aug 2024Source
- 2 Disclosure of sold/ booked inventoryGreenford Wing E Sold Unsold July To Sept 24.pdf · uploaded 19 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford E Wing Form 1 July To Sept 24.pdf · uploaded 16 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford E Wing Form 1 July To Sept 24.pdf · uploaded 16 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford E Wing Form 1 Oct To Dec 24.pdf · uploaded 21 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryGreenford E Sold Unsold (31 12 24).pdf · uploaded 21 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Greenford E Wing 23-24.pdf · uploaded 28 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Greenford E Wing Form 5 23-24.pdf · uploaded 28 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Greenford Wing E Form 1 Jan To March 25.pdf · uploaded 13 May 2025Source
- Form 5 (FY 2021-2022)Form 5 FY 21-22.pdf · uploaded 28 Dec 2025Source
- Form 5 (FY 2022-2023)Form 5 FY 2022-23.pdf · uploaded 28 Dec 2025Source
- Form 1Form 1 E Wing - Mar22.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 E wing - Mar22.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 March 2022.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked InventoryGreenford E wing - March 22 sold unsold.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 E Wing - June22.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 E Wing - Jun22.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 June 2022.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked InventoryGreenford E wing - June 22 sold unsold.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 Sept 2022.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 sept 2022.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 sept 2022.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 Dec 22.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 Dec 2022.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 dec 2022.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory2 Disclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 March 2023.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 March 2023.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 March 2023.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 June 2023.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 June 2023.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 June 2023.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory4 Disclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 Sept 2023.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 Sept 2023.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 Sept 2023.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory5 Disclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 Dec 2023.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 E wing - Dec23.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 dec 2023.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 Disclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 March 2024.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 March 2024.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 March 2024.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 June 2024.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 E wing - June24.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 June 2024.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 sept 2024.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 E wing - Sept24.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 sept 2024.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 Dec 2024.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 E wing - Dec24.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 Dec 2024.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1 March 2025.pdf · uploaded 29 Dec 2025Source
- Form 2Form 2 E wing - Mar25.pdf · uploaded 29 Dec 2025Source
- Form 3Form 3 March 2025.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 2Form 2 E wing - June25.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 2Form 2 E wing - June25.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 3Form 3 E Wing June 2025.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 3Form 3 Sept 2025.pdf · uploaded 29 Dec 2025Source
- Form 5 (FY 2023-2024)Form 5 FY 2023-24.pdf · uploaded 29 Dec 2025Source
- Form 5 (FY 2024-2025)Form 5 FY 2024-25.pdf · uploaded 29 Dec 2025Source
Technical
- DocumentSheet 1_compressed.pdf · uploaded 13 Dec 2021Source
- DocumentSheet 2_compressed.pdf · uploaded 13 Dec 2021Source
- DocumentSheet 3_compressed.pdf · uploaded 13 Dec 2021Source
- DocumentSheet 4_compressed.pdf · uploaded 13 Dec 2021Source
- DocumentSheet 5_compressed.pdf · uploaded 13 Dec 2021Source
- DocumentSheet 3_compressed.pdf · uploaded 13 Dec 2021Source
- DocumentSheet 1_compressed.pdf · uploaded 13 Dec 2021Source
- DocumentSheet 2_compressed.pdf · uploaded 13 Dec 2021Source
- DocumentSheet 4_compressed.pdf · uploaded 13 Dec 2021Source
- DocumentSheet 5_compressed.pdf · uploaded 13 Dec 2021Source
Technical (Architect)
- DocumentGreenford E Wing Form 1 July To Sept 24.pdf · uploaded 16 Nov 2024Source
- DocumentGreenford E Wing Form 1 July To Sept 24.pdf · uploaded 16 Nov 2024Source
- DocumentGreenford E Wing Form 1 Oct To Dec 24.pdf · uploaded 21 Jan 2025Source
- DocumentGreenford Wing E Form 1 Jan To March 25.pdf · uploaded 13 May 2025Source
- DocumentForm 1.pdf · uploaded 29 Dec 2025Source
Technical (Engineer)
- DocumentForm 2 E wing - June25.pdf · uploaded 29 Dec 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Badlapur (M Cl), Ambarnath taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Survey no 43 and 12mtr wide DP road
- South
- Survey no 41
- East
- Survey no 50
- West
- Survey no 42
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Raj Associates | — |
| Chartered accountant | Mangesh Ghanekar | — |
| Chartered accountant | N T Rahalkar & Co | — |
| Engineer | Atul Kudtarkar and associates | — |
Source: MahaRERA project page. Contact details are not shown.