Skip to content

Godrej Vihaa

Certificate Signed

Badlapur (M Cl), Thane 421502 |Promoter: K. R. Real Estate Pvt. Ltd.

1 Aug 2017Registered with MahaRERAFirst of 2 registrations
14 Aug 2022Promised completionLatest across registrations
5Buildings2 phases
504Units registered439 booked (87%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
RERA registrations
2
Phases
2
Buildings
5
Unit types
1BHK, 1.5 BHK, 1 BHK504 units in all
Address
16 Pt, 78 Pt, 79 Pt, 710, 72 Pt, 73 Pt, 74PIN 421502
Designated bank account
220
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.14499, 73.24726
Godrej Vihaa is at latitude 19.14499, longitude 73.24726.

Also registered as

Godrej Vihaa Phase 1Godrej Vihaa Phase 2

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 14 Aug 2022

P51700002442

The latest completion date on record passed 4 years and 2 months ago.

Registered
1 Aug 2017
Promised
14 Aug 2022

Completion promised for 30 Jul 2022

P51700002689

The latest completion date on record passed 4 years and 3 months ago.

Registered
2 Aug 2017
Promised
30 Jul 2022

2 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000024421 Aug 201714 Aug 202214 Aug 2022K. R. Real Estate Pvt. Ltd.Project page
P517000026892 Aug 201730 Jul 202230 Jul 2022K. R. Real Estate Pvt. Ltd.Project page

5 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

439 of 504 units booked (87%), as the promoter reported to MahaRERA

1BHK · 224 units1.5 BHK · 138 units1 BHK · 142 units
RERABuildingTypeCarpet areaUnitsBooked
P51700002442BUILDING NO 13 wing A , B and C1BHK31.52 sq m · 339 sq ft168139
P51700002689BUILDING NO 1 wing A and B1.5 BHK37.86 sq m · 408 sq ft1414
P51700002689BUILDING NO 1 wing A and B1.5 BHK38.03 sq m · 409 sq ft77
P51700002689BUILDING NO 1 wing A and B1.5 BHK38.35 sq m · 413 sq ft77
P51700002689BUILDING NO 1 wing A and B1.5 BHK38.49 sq m · 414 sq ft77
P51700002689BUILDING NO 1 wing A and B1 BHK31.21 sq m · 336 sq ft77
P51700002689BUILDING NO 1 wing A and B1 BHK31.37 sq m · 338 sq ft76
P51700002689BUILDING NO 1 wing A and B1 BHK31.82 sq m · 343 sq ft1413
Show all 27 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P51700002689BUILDING NO 1 wing A and B1 BHK32.74 sq m · 352 sq ft1413
P51700002689BUILDING NO 2 wing A and B1.5 BHK37.86 sq m · 408 sq ft1414
P51700002689BUILDING NO 2 wing A and B1.5 BHK38.03 sq m · 409 sq ft77
P51700002689BUILDING NO 2 wing A and B1.5 BHK38.35 sq m · 413 sq ft77
P51700002689BUILDING NO 2 wing A and B1.5 BHK38.49 sq m · 414 sq ft77
P51700002689BUILDING NO 2 wing A and B1 BHK31.21 sq m · 336 sq ft76
P51700002689BUILDING NO 2 wing A and B1 BHK31.37 sq m · 338 sq ft76
P51700002689BUILDING NO 2 wing A and B1 BHK31.82 sq m · 343 sq ft1411
P51700002689BUILDING NO 2 wing A and B1 BHK32.74 sq m · 352 sq ft1412
P51700002442Building No 31 BHK31.21 sq m · 336 sq ft73
P51700002442Building No 31 BHK31.37 sq m · 338 sq ft76
P51700002442Building No 31 BHK31.82 sq m · 343 sq ft149
P51700002442BUILDING NO 4 wing A and B1.5 BHK37.86 sq m · 408 sq ft2626
P51700002442BUILDING NO 4 wing A and B1.5 BHK38.03 sq m · 409 sq ft1413
P51700002442BUILDING NO 4 wing A and B1.5 BHK38.35 sq m · 413 sq ft1413
P51700002442BUILDING NO 4 wing A and B1.5 BHK38.49 sq m · 414 sq ft1414
P51700002442BUILDING NO 4 wing A and B1 BHK32.74 sq m · 352 sq ft2825
P51700002442BUILDING NO 4 wing A and B1 BHK34.26 sq m · 369 sq ft20
P51700002442BUILDING NO 4 wing A and B1BHK31.52 sq m · 339 sq ft5647

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 107 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP51700002689 · 9 Sep 2021ViewSource
  • Registration certificateP51700002442 · 9 Sep 2021ViewSource

Finance

  • PAN CardP51700002442 · PAN_KRREPL.pdf · uploaded 27 Jul 2017Source
  • PAN CardP51700002689 · PAN_KRREPL.pdf · uploaded 27 Jul 2017Source

Legal

  • Legal Title reportP51700002442 · Title Certificate- Vihaa.pdf · uploaded 26 Jul 2017Source
  • Declaration Form BP51700002442 · Form B- JVP-Phase 2.pdf · uploaded 26 Jul 2017Source
  • Legal Title reportP51700002689 · Title Certificate- Vihaa.pdf · uploaded 26 Jul 2017Source
  • Declaration Form BP51700002689 · Form B- JVP- Phase 1.pdf · uploaded 31 Jul 2017Source
Show all 109 documentsShow fewer documents

Legal

  • OtherP51700002442 · ALLOTMENT LETTER- Godrej Vihaa Phase 2.pdf · uploaded 2 Feb 2019Source
  • OtherP51700002442 · Application form Godrej vihaa phase 2.pdf · uploaded 2 Feb 2019Source
  • OtherP51700002689 · ALLOTMENT LETTER- Godrej Vihaa Phase 1.pdf · uploaded 2 Feb 2019Source
  • OtherP51700002689 · Application Form- Godrej Vihaa Phase 1.pdf · uploaded 2 Feb 2019Source
  • OtherP51700002442 · Society Registration Certificate - Phase 2.pdf · uploaded 29 Jun 2022Source

Migrated

  • 1 Copy of the legal title reportP51700002442 · Title Certificate- Vihaa.pdf · uploaded 26 Jul 2017Source
  • 1 Details of encumbrancesP51700002442 · Non Encumbrance-Phase 2 Godrej Vihaa 250717.pdf · uploaded 26 Jul 2017Source
  • 1 Declaration in FORM BP51700002442 · Form B- JVP-Phase 2.pdf · uploaded 26 Jul 2017Source
  • 1 Proforma of Allotment letterP51700002442 · Scanned -VIHAA Phase 2- RERA-AGREEMENT FOR SALE - Copy.pdf · uploaded 26 Jul 2017Source
  • 1 Copy of the legal title reportP51700002689 · Title Certificate- Vihaa.pdf · uploaded 26 Jul 2017Source
  • 1 Details of encumbrancesP51700002689 · Non Encumbrance- Phase 1 Godrej Vihaa 250717.pdf · uploaded 26 Jul 2017Source
  • 1 Proforma of Allotment letterP51700002689 · Scanned-VIHAA Phase 1 RERA-AGREEMENT FOR SALE - Copy.pdf · uploaded 26 Jul 2017Source
  • 2 Proforma of Allotment letterP51700002689 · Scanned_VIHAA PHASE I ALLOTMENT LETTER -.pdf · uploaded 26 Jul 2017Source
  • 1 PAN CardP51700002442 · PAN_KRREPL.pdf · uploaded 27 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)P51700002442 · 01.pdf · uploaded 27 Jul 2017Source
  • 1 Building Plan Approval (IOD)P51700002442 · Development Permission.pdf · uploaded 27 Jul 2017Source
  • 2 Building Plan Approval (IOD)P51700002442 · 04.pdf · uploaded 27 Jul 2017Source
  • 3 Building Plan Approval (IOD)P51700002442 · 06.pdf · uploaded 27 Jul 2017Source
  • 4 Building Plan Approval (IOD)P51700002442 · 07.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700002442 · Architect Certificate_Phase 2.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700002442 · Engineer's Certificate PHASE 2.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of CA (Form 3)P51700002442 · RERA_CA CERTIFICATE_PHASE_2.pdf · uploaded 27 Jul 2017Source
  • 2 Proforma of Allotment letterP51700002442 · Scanned-VIHAA PHASE 2 ALLOTMENT LETTER.pdf · uploaded 27 Jul 2017Source
  • 1 PAN CardP51700002689 · PAN_KRREPL.pdf · uploaded 27 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)P51700002689 · 01.pdf · uploaded 27 Jul 2017Source
  • 1 Building Plan Approval (IOD)P51700002689 · Development Permission.pdf · uploaded 27 Jul 2017Source
  • 2 Building Plan Approval (IOD)P51700002689 · 03.pdf · uploaded 27 Jul 2017Source
  • 3 Building Plan Approval (IOD)P51700002689 · 04.pdf · uploaded 27 Jul 2017Source
  • 4 Building Plan Approval (IOD)P51700002689 · 05.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700002689 · Architect_Certificate_Phase_1_27_07_2017.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700002689 · ENGINEER CERTIFICATE Phase_1_22July2017.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of CA (Form 3)P51700002689 · RERA_CA CERTIFICATE_PHASE_1.pdf · uploaded 27 Jul 2017Source
  • 1 Declaration in FORM BP51700002689 · Form B- JVP- Phase 1.pdf · uploaded 31 Jul 2017Source
  • 3 Proforma of Allotment letterP51700002442 · Rera Upload- Part 1- VIHAA - Phase 2- AGREEMENT FOR SALE .pdf · uploaded 31 Oct 2017Source
  • 4 Proforma of Allotment letterP51700002442 · Rera Upload- Part 1- VIHAA - Phase 2- AGREEMENT FOR SALE -31st Oct 17.pdf · uploaded 31 Oct 2017Source
  • 5 Proforma of Allotment letterP51700002442 · Rera Upload- Part 2- VIHAA - Phase 2- AGREEMENT FOR SALE -31st Oct 17.pdf · uploaded 31 Oct 2017Source
  • 6 Proforma of Allotment letterP51700002442 · Rera Upload- Part 3- VIHAA -Phase 2- AGREEMENT FOR SALE -31st Oct 17.pdf · uploaded 31 Oct 2017Source
  • 3 Proforma of Allotment letterP51700002689 · Rera Upload-Part 1-VIHAA Phase 1-AGREEMENT FOR SALE-31st Oct 17.pdf · uploaded 31 Oct 2017Source
  • 4 Proforma of Allotment letterP51700002689 · Rera Upload- Part 2- VIHAA -Phase 1- AGREEMENT FOR SALE-31st Oct 17.pdf · uploaded 31 Oct 2017Source
  • 5 Proforma of Allotment letterP51700002689 · Rera Upload- Part 3- VIHAA - Phase 1-AGREEMENT FOR SALE-31st Oct 17.pdf · uploaded 31 Oct 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700002442 · Phase 1_AC_5_041217.pdf · uploaded 15 Jan 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700002442 · Godrej Vihaa_Phase 2_AC_5_041217.pdf · uploaded 15 Jan 2018Source
  • 2 Certificates of CA (Form 3)P51700002442 · Godrej Vihaa_Phase 2_CA_5_111217.pdf · uploaded 15 Jan 2018Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700002689 · Phase 1_AC_5_041217.pdf · uploaded 15 Jan 2018Source
  • 2 Certificates of CA (Form 3)P51700002689 · Godrej Vihaa_Phase 1_CA_5_111217.pdf · uploaded 15 Jan 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51700002442 · Godrej Vihaa_C C.pdf · uploaded 23 Mar 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51700002689 · Godrej Vihaa_C C.pdf · uploaded 23 Mar 2018Source
  • 1 Certificates of CA (Form 5)P51700002442 · form 5 GV Phase 2.pdf · uploaded 7 Oct 2018Source
  • 1 Certificates of CA (Form 5)P51700002689 · form 5 GV Phase 1.pdf · uploaded 7 Oct 2018Source
  • 7 Proforma of Allotment letterP51700002442 · AFS-1-Godrej-Vihaa-Phase-2--(8-1-2019)-1-22.pdf · uploaded 2 Feb 2019Source
  • 8 Proforma of Allotment letterP51700002442 · AFS-2-Godrej-Vihaa-Phase-2--(8-1-2019)-23-46.pdf · uploaded 2 Feb 2019Source
  • 9 Proforma of Allotment letterP51700002442 · AFS-3-Godrej-Vihaa-Phase-2--(8-1-2019)-47-69.pdf · uploaded 2 Feb 2019Source
  • 1 OtherP51700002442 · ALLOTMENT LETTER- Godrej Vihaa Phase 2.pdf · uploaded 2 Feb 2019Source
  • 2 OtherP51700002442 · Application form Godrej vihaa phase 2.pdf · uploaded 2 Feb 2019Source
  • 6 Proforma of Allotment letterP51700002689 · AFS-1-Godrej-Vihaa-Phase-1--(8-1-2019)-1-22.pdf · uploaded 2 Feb 2019Source
  • 7 Proforma of Allotment letterP51700002689 · AFS-2-Godrej-Vihaa-Phase-1--(8-1-2019)-23-46.pdf · uploaded 2 Feb 2019Source
  • 8 Proforma of Allotment letterP51700002689 · AFS-3-Godrej-Vihaa-Phase-1--(8-1-2019)-47-68.pdf · uploaded 2 Feb 2019Source
  • 1 OtherP51700002689 · ALLOTMENT LETTER- Godrej Vihaa Phase 1.pdf · uploaded 2 Feb 2019Source
  • 2 OtherP51700002689 · Application Form- Godrej Vihaa Phase 1.pdf · uploaded 2 Feb 2019Source
  • 2 Certificates of CA (Form 5)P51700002442 · KRREPL_FORM 5_2018-19_PHASE 2.pdf · uploaded 18 Oct 2019Source
  • 2 Certificates of CA (Form 5)P51700002689 · KRREPL_FORM 5_2018-19_PHASE 1.pdf · uploaded 18 Oct 2019Source
  • 3 Certificates of CA (Form 5)P51700002442 · KRREPL_FORM 5_2019-20_PHASE 2.pdf · uploaded 21 Nov 2020Source
  • 3 Certificates of CA (Form 5)P51700002689 · KRREPL_FORM 5_2019-20_PHASE 1.pdf · uploaded 21 Nov 2020Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700002689 · Occupation Certificate _05112020.pdf · uploaded 26 Jun 2021Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)P51700002689 · Form 4_Architect Completion Certificate.pdf · uploaded 26 Jun 2021Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700002689 · Society Registration Certificate_19032021.pdf · uploaded 26 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51700002442 · KRREPL_FORM 5_2018-19_PHASE 2.pdf · uploaded 3 Nov 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P51700002442 · KRREPL_FORM 5_2019-20_PHASE 2.pdf · uploaded 3 Nov 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51700002689 · KRREPL_FORM 5_2018-19_PHASE 1.pdf · uploaded 3 Nov 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P51700002689 · KRREPL_FORM 5_2019-20_PHASE 1.pdf · uploaded 3 Nov 2021Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700002442 · Form 1GVPhase 205012022.pdf · uploaded 17 Feb 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51700002442 · Form 2A Phase 2.pdf · uploaded 17 Feb 2022Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700002442 · Phase 2.pdf · uploaded 24 Jun 2022Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700002442 · Godrej Vihaa Phase 2_EC_ March'22.pdf · uploaded 24 Jun 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700002442 · Form 2A_GV_Phase 2_April 2021.pdf · uploaded 24 Jun 2022Source
  • 3 Certificates of CA (Form 3)P51700002442 · PHASE-2 RERA CERTIFICATE-2.pdf · uploaded 24 Jun 2022Source
  • 1 Declaration about Commencement CertificateP51700002442 · CC- DECLARATION- PHASE-2.pdf · uploaded 27 Jun 2022Source
  • 3 OtherP51700002442 · Society Registration Certificate - Phase 2.pdf · uploaded 29 Jun 2022Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700002442 · Godrej Vihaa Phase 2_EC_ June'22.pdf · uploaded 16 Jul 2022Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700002442 · Godrej Vihaa Phase 2_EC_ June'22.pdf · uploaded 16 Jul 2022Source
  • 1 CERSAI detailsP51700002442 · CERSAI_Search_Report_200242372497_For_Asset_Based_Search_16_07_2022_21_15_40_119.pdf · uploaded 16 Jul 2022Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700002442 · OC.pdf · uploaded 16 Jul 2022Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)P51700002442 · Godrej Vihaa Phase 2-Completion Certificate.pdf · uploaded 18 Jul 2022Source
  • 1 Disclosure of sold/ booked inventoryP51700002442 · Sold-Unsold GV2.pdf · uploaded 19 Jul 2022Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700002442 · Society Registration Certificate - Phase 2.pdf · uploaded 27 Jul 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51700002442 · P2_MAHARERA FORM 5 For annual report of CA (2) 2020-21.pdf · uploaded 24 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51700002442 · P2_MAHARERA FORM 5 For annual report of CA (2) 2021-22.pdf · uploaded 24 Nov 2022Source

Technical

  • DocumentP51700002442 · Development Permission.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002442 · 06.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002442 · 07.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002442 · 01.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002442 · 04.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002689 · 04.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002689 · 05.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002689 · 03.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002689 · 01.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002689 · Development Permission.pdf · uploaded 27 Jul 2017Source

Technical (Architect)

  • DocumentP51700002689 · Phase 1_AC_5_041217.pdf · uploaded 15 Jan 2018Source
  • DocumentP51700002442 · Phase 2.pdf · uploaded 24 Jun 2022Source

Technical (Engineer)

  • DocumentP51700002689 · ENGINEER CERTIFICATE Phase_1_22July2017.pdf · uploaded 27 Jul 2017Source
  • DocumentP51700002442 · Godrej Vihaa Phase 2_EC_ June'22.pdf · uploaded 16 Jul 2022Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Badlapur (M Cl), Ambarnath taluka

Survey, CTS, gat or plot numbers

1/12 PT1/17C PLOT NO 31/17D PLOT NO 41/6 PT7/107/2 PT7/3 PT7/47/8 PT7/9 PT

Boundaries

North
Phase 3
South
S No 7 And 8
East
S No 9 Hissa No 11
West
Phase1 1

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectMandviwala Qutub and Associates—P51700002689
ArchitectMandviwala Qutub And Associates—P51700002442
EngineerkHASNIS AND ASSOCIATES—P51700002689
EngineerKhasnis And Associates—P51700002442
OtherGodrej Properties Ltd—P51700002442
OtherGodrej Properties Ltd—P51700002689

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology