Audumber Flower Valley
Certificate SignedBadlapur (M Cl), Thane 421503 |Promoter: Audumber Superstructures
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 1RK, 1BHK, 2BHK248 units in all
- Address
- S No 5/4/D 5/4/B 5/23/B, Juveli, JuveliPIN 421503
- Designated bank account
- 51
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 1 year
The latest completion date on record passed 4 months ago.
- Registered
- 3 Dec 2021
- Promised
- 30 Jun 2025
- Revised
- 30 Jun 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700032044 | 3 Dec 2021 | 30 Jun 2025 | 30 Jun 2026 | Audumber Superstructures | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
156 of 248 units booked (63%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | 1RK | 22.36 sq m · 241 sq ft | 26 | 11 |
| Wing A | 1RK | 22.89 sq m · 246 sq ft | 26 | 15 |
| Wing A | 1RK | 23.57 sq m · 254 sq ft | 26 | 8 |
| Wing A | 1RK | 24.05 sq m · 259 sq ft | 26 | 16 |
| Wing B | 1BHK | 32.35 sq m · 348 sq ft | 48 | 22 |
| Wing B | 1BHK | 33.04 sq m · 356 sq ft | 12 | 9 |
| Wing B | 1BHK | 33.12 sq m · 357 sq ft | 12 | 12 |
| Wing B | 1BHK | 34.3 sq m · 369 sq ft | 12 | 9 |
Show all 12 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing B | 1BHK | 35.82 sq m · 386 sq ft | 24 | 21 |
| Wing B | 1BHK | 37.21 sq m · 401 sq ft | 12 | 10 |
| Wing B | 2BHK | 46.03 sq m · 495 sq ft | 12 | 11 |
| Wing B | 2BHK | 46.7 sq m · 503 sq ft | 12 | 12 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 145 filings listed on MahaRERA's project page
Finance
Show all 147 documentsShow fewer documents
Legal
- Declaration Form BAffidavit cum Declaration.pdf · uploaded 13 Jun 2025Source
Migrated
- 1 PAN CardPAN.pdf · uploaded 13 Nov 2021Source
- 1 Copy of the legal title reportTittle.pdf · uploaded 13 Nov 2021Source
- 1 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 13 Nov 2021Source
- 2 Copy of Layout Approval (in case of layout)Plan 2.pdf · uploaded 13 Nov 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 13 Nov 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 13 Nov 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentC C.pdf · uploaded 13 Nov 2021Source
- 1 Declaration in FORM BForm B Aniket Gurav Promoter.pdf · uploaded 13 Nov 2021Source
- 1 Proforma of Allotment letterAgreement to Sell.pdf · uploaded 13 Nov 2021Source
- 1 Details of encumbrancesNo Encumbrance Declaration.pdf · uploaded 22 Nov 2021Source
- 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 22 Nov 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate Rev Audumber Flower Valley 13 11 2021.pdf · uploaded 22 Nov 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ravindra Ghormade - Architects Certificate 19_09_2022.pdf · uploaded 1 Oct 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 1 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 27 Mar 2023Source
- 2 Details of encumbrancesself declaration regarding Finance.pdf · uploaded 30 Mar 2023Source
- 2 Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 10 May 2023Source
- 1 Proforma of Agreement for saleAUDUMBER SUPERSTRUCTURES - AGREEMENT DRAFT.pdf · uploaded 11 May 2023Source
- 2 Proforma of Allotment letterALLOTMENT LETTER DRAFT.pdf · uploaded 11 May 2023Source
- 2 PAN CardPAN Card.pdf · uploaded 18 May 2023Source
- 2 Declaration in FORM BForm B Promoter.pdf · uploaded 18 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 18 May 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Audumbar Superstructures - Form 2_compressed.pdf · uploaded 18 May 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate.pdf · uploaded 30 May 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Audumber Superstructures - Form 2.pdf · uploaded 30 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance Certificate.pdf · uploaded 30 May 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold booked inventory_1.pdf · uploaded 1 Jun 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - signed_1.pdf · uploaded 1 Jun 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration abt seperate bank ac.pdf · uploaded 1 Jun 2023Source
- 1 Other – TechnicalSelf Declaration.pdf · uploaded 1 Jun 2023Source
- 2 Other – TechnicalDECLARATION-CUM-UNDERTAKING_compressed.pdf · uploaded 17 Jun 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Signed.pdf · uploaded 26 Jun 2023Source
- 3 Other – TechnicalDeclaration.pdf · uploaded 26 Jun 2023Source
- 4 Other – TechnicalUndertaking.pdf · uploaded 26 Jun 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - 17-11-2023 (1).pdf · uploaded 9 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 9 Jan 2024Source
- 2 Proforma of Agreement for saleAGREEMENT DRAFT - AS PER 13TH FLOORS.pdf · uploaded 29 Jan 2024Source
- 3 Details of encumbrancesSelf Declaration Regarding Encumbrances (1).pdf · uploaded 2 Feb 2024Source
- 1 CERSAI detailsCersal Declaration (1).pdf · uploaded 2 Feb 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of interest in other Real Estate Organisation - Aniket Gurav (1).pdf · uploaded 2 Feb 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of interest in other Real Estate Organisation - Atish Dhule (1).pdf · uploaded 2 Feb 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of interest in other Real Estate Organisation - Nachiket Gurav (2) (1).pdf · uploaded 2 Feb 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of interest in other Real Estate Organisation - Shreedhar Dhule (1).pdf · uploaded 2 Feb 2024Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of interest in other Real Estate Organisation - Shrikant Dhule (1).pdf · uploaded 2 Feb 2024Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of interest in other Real Estate Organisation - Shrinivas Dhule (1).pdf · uploaded 2 Feb 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation Report with Respect to Allotment Letter (3).pdf · uploaded 2 Feb 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report with Respect to model copy of agreement (1).pdf · uploaded 2 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - 17-11-2023 (1).pdf · uploaded 9 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Signed compressed.pdf · uploaded 9 Feb 2024Source
- 3 Copy of Layout Approval (in case of layout)Blue print.pdf · uploaded 22 Feb 2024Source
- 4 Copy of Layout Approval (in case of layout)2023-10-27-17-59-49.pdf · uploaded 22 Feb 2024Source
- 5 Copy of Layout Approval (in case of layout)2023-10-27-17-4-26.pdf · uploaded 22 Feb 2024Source
- 6 Copy of Layout Approval (in case of layout)2023-10-27-17-10-4.pdf · uploaded 22 Feb 2024Source
- 7 Copy of Layout Approval (in case of layout)2023-10-27-17-20-48.pdf · uploaded 22 Feb 2024Source
- 8 Copy of Layout Approval (in case of layout)2023-10-27-17-36-31.pdf · uploaded 22 Feb 2024Source
- 2 Declaration about Commencement CertificateDeclaration of CC Audumber Superstructure.pdf · uploaded 22 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 22 Feb 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 22 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 5 Audumber Superstructure.pdf · uploaded 22 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Audumber Superstructure.pdf · uploaded 22 Feb 2024Source
- 2 Deviation Report with respect to Allotment letterAllotment Letter.pdf · uploaded 22 Feb 2024Source
- 5 Other – TechnicalCC Verification.pdf · uploaded 22 Feb 2024Source
- 6 Other – TechnicalDeclaration of Sold and Unsold Audumber Superstructure.pdf · uploaded 22 Feb 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2024.pdf · uploaded 21 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2024.pdf · uploaded 21 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sept 2024.pdf · uploaded 21 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 2024.pdf · uploaded 21 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sept 2024.pdf · uploaded 21 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2024.pdf · uploaded 21 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure September 2024 (AS).pdf · uploaded 21 Feb 2025Source
- 2 Disclosure of sold/ booked inventoryDisclosure 31st December 2024 (AS).pdf · uploaded 21 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Audumber Superstructure FY 2023-24.pdf · uploaded 21 Feb 2025Source
- DocumentForm 1.pdf · uploaded 29 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 29 Apr 2025Source
- DocumentForm 2.pdf · uploaded 29 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold or Unsold Inventory .pdf · uploaded 29 Apr 2025Source
- 1 Declaration in FORM BAffidavit cum Declaration.pdf · uploaded 13 Jun 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)AUDUMBER SUPERSTRUCTURES - FORM 2A-2023-24.pdf · uploaded 14 Jul 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FOR RERA 30 06 2025.pdf · uploaded 15 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Compressed Signed Form 3 as on 30th June 2025.pdf · uploaded 15 Jul 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE -AUDUMBER SUP.pdf · uploaded 15 Jul 2025Source
- 1 Disclosure of sold/ booked inventoryCompressed Sold - unsold inventory.pdf · uploaded 15 Jul 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)AUDUMBER SUPERSTRUCTURES - FORM 2A-2024-25.pdf · uploaded 15 Jul 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE NEW.pdf · uploaded 19 Jul 2025Source
- Form 1Form 1 sept 2024.pdf · uploaded 31 Dec 2025Source
- Form 2Form 2 Sept 2024.pdf · uploaded 31 Dec 2025Source
- Form 3Form 3 Sept 2024.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory.pdf · uploaded 31 Dec 2025Source
- Form 1Form 1 March 2025.pdf · uploaded 31 Dec 2025Source
- Form 2Form 2 March 2025.pdf · uploaded 31 Dec 2025Source
- Form 3Form 3 March 2025.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory.pdf · uploaded 31 Dec 2025Source
- Form 5 (FY 2024-2025)Form 5 24-25 Audumber Superstructure Signed.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1ARCHITECT CERTIFICATE FOR RERA 30 06 2025.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1Form-01 Sept 25.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2ENGINEER CERTIFICATE -AUDUMBER SUP.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2Form-02 Sept 25.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3Signed Form 3 as on 30th June 2025.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3Form-03_Signed.pdf · uploaded 30 Jan 2026Source
- Form 1Form 1 Dec 2024.pdf · uploaded 2 Feb 2026Source
- Form 2Form 2 Dec 2024.pdf · uploaded 2 Feb 2026Source
- Form 3Form 3 Dec 2024.pdf · uploaded 2 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold or Unsold Inventory as on 31st December 2024 (AS).pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1Form 1 Dec 25.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2Form 2 Dec 25.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3FORM 3 Audumber Superstructure Dec 25.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1Signed Form 1__Flower Valley as on March 2026.pdf · uploaded 23 Apr 2026Source
- Withdrawal Update Form 2Signed Form 2 of Audumber Flower Valley as on March 2026.pdf · uploaded 23 Apr 2026Source
- Withdrawal Update Form 3Signed Form 3__Flower Valley as on March 2026.pdf · uploaded 23 Apr 2026Source
- Withdrawal Update Form 1Signed Form 1__Flower Valley as on June 2026.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Signed Form 2 of Audumber Flower Valley as on June 2026.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Signed Form 3__Flower Valley as on June 2026.pdf · uploaded 20 Jul 2026Source
Technical
- DocumentPlan 1.pdf · uploaded 13 Nov 2021Source
- DocumentPlan 2.pdf · uploaded 13 Nov 2021Source
- DocumentPlan 1.pdf · uploaded 13 Nov 2021Source
- DocumentPlan 2.pdf · uploaded 13 Nov 2021Source
- Other – TechnicalSelf Declaration.pdf · uploaded 1 Jun 2023Source
- Other – TechnicalDECLARATION-CUM-UNDERTAKING_compressed.pdf · uploaded 17 Jun 2023Source
- Other – TechnicalDeclaration.pdf · uploaded 26 Jun 2023Source
- Other – TechnicalUndertaking.pdf · uploaded 26 Jun 2023Source
- DocumentBlue print.pdf · uploaded 22 Feb 2024Source
- Document2023-10-27-17-59-49.pdf · uploaded 22 Feb 2024Source
- Document2023-10-27-17-4-26.pdf · uploaded 22 Feb 2024Source
- Document2023-10-27-17-10-4.pdf · uploaded 22 Feb 2024Source
- Document2023-10-27-17-20-48.pdf · uploaded 22 Feb 2024Source
- Document2023-10-27-17-36-31.pdf · uploaded 22 Feb 2024Source
- Other – TechnicalCC Verification.pdf · uploaded 22 Feb 2024Source
- Other – TechnicalDeclaration of Sold and Unsold Audumber Superstructure.pdf · uploaded 22 Feb 2024Source
Technical (Architect)
- DocumentForm 1 Sept 2024.pdf · uploaded 21 Feb 2025Source
- DocumentForm 1 Dec 2024.pdf · uploaded 21 Feb 2025Source
- DocumentForm 1.pdf · uploaded 29 Apr 2025Source
- DocumentARCHITECT CERTIFICATE FOR RERA 30 06 2025.pdf · uploaded 15 Jul 2025Source
- DocumentSigned Form 1__Flower Valley as on June 2026.pdf · uploaded 20 Jul 2026Source
Technical (Engineer)
- DocumentForm 2 Sept 2024.pdf · uploaded 21 Feb 2025Source
- DocumentForm 2 Dec 2024.pdf · uploaded 21 Feb 2025Source
- DocumentForm 2.pdf · uploaded 29 Apr 2025Source
- DocumentENGINEER'S CERTIFICATE -AUDUMBER SUP.pdf · uploaded 15 Jul 2025Source
- DocumentSigned Form 2 of Audumber Flower Valley as on June 2026.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Badlapur (M Cl), Ambarnath taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- H No 5
- South
- H No 22 9
- East
- H No 5
- West
- 18 M W Dp Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ravindra Ghormode | — |
| Chartered accountant | Ca Mangesh Ghanekar | — |
| Engineer | Atul Kudtarkar & Associates | — |
Source: MahaRERA project page. Contact details are not shown.