Audumber Crown

Certificate Signed

Badlapur (M Cl), Thane 421503 |Promoter: Audumber Builders & Developers

23 Jun 2023Registered with MahaRERA
31 Dec 2026Promised completion
30 Apr 2027Revised completionPushed back 4 months
1Building
38Units registered7 booked (18%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 1 BHK Landowner, 2BHK, 2 BHK Landowner, Office space, Restuarant, Restuarant Landowner, Shop Landowner38 units in all
Address
S NO 25, H No3/3, Plot No 1, VILLAGE KATRAP, BADLAPURPIN 421503
Designated bank account
76
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.21833, 72.97809
Audumber Crown is at latitude 19.21833, longitude 72.97809.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
23 Jun 2023
Promised
31 Dec 2026
Revised
30 Apr 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170005153423 Jun 202331 Dec 202630 Apr 2027Audumber Builders & DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Audumber Crown538

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

7 of 38 units booked (18%), as the promoter reported to MahaRERA

1BHK · 3 units1 BHK Landowner · 2 units2BHK · 9 units2 BHK Landowner · 6 unitsOffice space · 14 unitsRestuarant · 1 unitRestuarant Landowner · 1 unitShop Landowner · 2 units
TypeCarpet areaUnitsBooked
1BHK46.98 sq m · 506 sq ft20
1BHK68.07 sq m · 733 sq ft10
1 BHK Landowner46.98 sq m · 506 sq ft20
2BHK54.42 sq m · 586 sq ft22
2BHK57.61 sq m · 620 sq ft20
2BHK58.99 sq m · 635 sq ft20
2BHK77.88 sq m · 838 sq ft10
2BHK78.2 sq m · 842 sq ft11
Show all 30 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK98.22 sq m · 1,057 sq ft11
2 BHK Landowner54.42 sq m · 586 sq ft20
2 BHK Landowner57.61 sq m · 620 sq ft20
2 BHK Landowner58.99 sq m · 635 sq ft20
Office space13.18 sq m · 142 sq ft10
Office space14.56 sq m · 157 sq ft10
Office space15.96 sq m · 172 sq ft11
Office space15.99 sq m · 172 sq ft10
Office space16.83 sq m · 181 sq ft10
Office space17.12 sq m · 184 sq ft10
Office space17.31 sq m · 186 sq ft10
Office space19.25 sq m · 207 sq ft10
Office space19.81 sq m · 213 sq ft10
Office space22.49 sq m · 242 sq ft10
Office space22.8 sq m · 245 sq ft10
Office space23.26 sq m · 250 sq ft11
Office space25.13 sq m · 270 sq ft10
Office space29.94 sq m · 322 sq ft11
Restuarant324.49 sq m · 3,493 sq ft10
Restuarant Landowner195.63 sq m · 2,106 sq ft10
Shop Landowner20.08 sq m · 216 sq ft10
Shop Landowner21.12 sq m · 227 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 140 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardAudumber builders - PAN.pdf · uploaded 24 May 2023Source

Legal

  • Legal Title reportLegal Title Report 1.pdf · uploaded 24 May 2023Source
  • Declaration Form BPromoter Form B.pdf · uploaded 24 May 2023Source

Migrated

  • 1 PAN CardAudumber builders - PAN.pdf · uploaded 24 May 2023Source
  • 1 Copy of the legal title reportLegal Title Report 1.pdf · uploaded 24 May 2023Source
  • 1 a Details of encumbrances concerned to FinanceFinancial and Legal Non Encumbrance.pdf · uploaded 24 May 2023Source
  • 1 b Details of encumbrances concerned to LegalFinancial and Legal Non Encumbrance.pdf · uploaded 24 May 2023Source
Show all 141 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 24 May 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval.pdf · uploaded 24 May 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 24 May 2023Source
  • 1 Declaration about Commencement CertificateDeclaration about CC_1.pdf · uploaded 24 May 2023Source
  • 1 Declaration in FORM BPromoter Form B.pdf · uploaded 24 May 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech's Certificate - Audumber Crown.pdf · uploaded 24 May 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Audumber Crown - Form 2.pdf · uploaded 24 May 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDeclarartion of interest - Aniket.pdf · uploaded 24 May 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest - Megha.pdf · uploaded 24 May 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest - Nachiket.pdf · uploaded 24 May 2023Source
  • 1 Proforma of Allotment letterAllotment of flat.pdf · uploaded 24 May 2023Source
  • 1 Proforma of Agreement for saleRERA AGREEMENT FOR SALE- AUDUMBER CROWN.pdf · uploaded 24 May 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about seperate bank ac.pdf · uploaded 24 May 2023Source
  • 1 Deviation Report with respect to Allotment letterDeclaration about deviation allotement.pdf · uploaded 24 May 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation report in respect to model copy.pdf · uploaded 24 May 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 27 May 2023Source
  • 1 CERSAI detailsCERSAI Declaration.pdf · uploaded 8 Jun 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Audumber Crown Architect Certificate.pdf · uploaded 19 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 19 Feb 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 19 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 19 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 September 2024.pdf · uploaded 19 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 December 2024.pdf · uploaded 19 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2024.pdf · uploaded 19 Feb 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Feb 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2024.pdf · uploaded 19 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 2024.pdf · uploaded 19 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 September 2024.pdf · uploaded 19 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2024.pdf · uploaded 19 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold or Unsold Inventory as on 31st March 2024.pdf · uploaded 19 Feb 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold or Unsold Inventory as on 30th June 2024.pdf · uploaded 19 Feb 2025Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Sold or Unsold Inventory as on 30th September 2024.pdf · uploaded 19 Feb 2025Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of Sold or Unsold Inventory as on 31st December 2024.pdf · uploaded 19 Feb 2025Source
  • 1 Copy of Layout Approval (in case of layout)Blue Print New.pdf · uploaded 4 Apr 2025Source
  • 1 Proforma of Allotment letterCROWN ALLOTMENT LETTER - DRAFT.pdf · uploaded 4 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 4 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 4 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 4 Apr 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE SHREE SAI SHYAM CHSL.pdf · uploaded 4 Apr 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentBlue Print New.pdf · uploaded 4 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold-Unsold Inventory.pdf · uploaded 4 Apr 2025Source
  • 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 4 Apr 2025Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 4 Apr 2025Source
  • 1 Deviation Report with respect to Allotment letterCROWN ALLOTMENT LETTER - DRAFT.pdf · uploaded 4 Apr 2025Source
  • 1 Proforma of Agreement for saleCROWN AGREEMENT - DRAFT.pdf · uploaded 4 Apr 2025Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B.pdf · uploaded 4 Apr 2025Source
  • 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for secured or unsecured finance unavailed.pdf · uploaded 4 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 29 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 29 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 29 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold or Unsold Inventory.pdf · uploaded 29 Apr 2025Source
  • Form 1Form 1 March 2024.pdf · uploaded 4 Nov 2025Source
  • Form 2Form 2 March 2024.pdf · uploaded 4 Nov 2025Source
  • Form 3Form 3 March 2024.pdf · uploaded 4 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory March 2024.pdf · uploaded 4 Nov 2025Source
  • Form 1Form 1 June 2024.pdf · uploaded 4 Nov 2025Source
  • Form 2Form 2 June 2024.pdf · uploaded 4 Nov 2025Source
  • Form 3Form 3 June 2024.pdf · uploaded 4 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory June 2024.pdf · uploaded 4 Nov 2025Source
  • Form 1Form 1 September 2024.pdf · uploaded 4 Nov 2025Source
  • Form 2Form 2 September 2024.pdf · uploaded 4 Nov 2025Source
  • Form 3Form 3 September 2024.pdf · uploaded 4 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory September 2024.pdf · uploaded 4 Nov 2025Source
  • Form 1Form 1 Dec 2024.pdf · uploaded 4 Nov 2025Source
  • Form 2Form 2 Dec 2024.pdf · uploaded 4 Nov 2025Source
  • Form 3Form 3 Dec 2024.pdf · uploaded 4 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 2024.pdf · uploaded 4 Nov 2025Source
  • Form 1Form 1 March 2025.pdf · uploaded 4 Nov 2025Source
  • Form 2Form 2 March 2025.pdf · uploaded 4 Nov 2025Source
  • Form 3Form 3 March 2025.pdf · uploaded 4 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory March 2025.pdf · uploaded 4 Nov 2025Source
  • Form 1Form 1 December 2023.pdf · uploaded 5 Nov 2025Source
  • Form 2Form 2 December 2023.pdf · uploaded 5 Nov 2025Source
  • Form 3Form 3 December 2023.pdf · uploaded 5 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold or Unsold Inventory as on 31st Dec 2023.pdf · uploaded 5 Nov 2025Source
  • Form 1Form1 signed june 23.pdf · uploaded 6 Nov 2025Source
  • Form 2Form 2 June 23 signed.pdf · uploaded 6 Nov 2025Source
  • Form 3Final signed Form 3 June 2023 .pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventorySigned Disclosure of Sold & Unsold Inventory June 23.pdf · uploaded 6 Nov 2025Source
  • Form 1Form1 signed june 23.pdf · uploaded 6 Nov 2025Source
  • Form 2Form 2 June 23 signed.pdf · uploaded 6 Nov 2025Source
  • Form 3Final signed Form 3 June 2023 .pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventorySigned Disclosure of Sold & Unsold Inventory June 23.pdf · uploaded 6 Nov 2025Source
  • Form 1Form 1 sept 23 signed.pdf · uploaded 6 Nov 2025Source
  • Form 2Form 2 sept 23 signed.pdf · uploaded 6 Nov 2025Source
  • Form 3Final Signed Form 3 September 2023.pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventorySigned Disclosure of Sold & Unsold Invetory Sept 23.pdf · uploaded 6 Nov 2025Source
  • Form 1Form 1 sept 23 signed.pdf · uploaded 6 Nov 2025Source
  • Form 2Form 2 sept 23 signed.pdf · uploaded 6 Nov 2025Source
  • Form 3Final Signed Form 3 September 2023.pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventorySigned Disclosure of Sold & Unsold Invetory Sept 23.pdf · uploaded 6 Nov 2025Source
  • Form 1Form 1 sept 23 signed.pdf · uploaded 6 Nov 2025Source
  • Form 2Form 2 sept 23 signed.pdf · uploaded 6 Nov 2025Source
  • Form 3Final Signed Form 3 September 2023.pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventorySigned Disclosure of Sold & Unsold Invetory Sept 23.pdf · uploaded 6 Nov 2025Source
  • Withdrawal Update Form 1Form 1 June 25 signed.pdf · uploaded 18 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Sept 25 signed.pdf · uploaded 18 Nov 2025Source
  • Withdrawal Update Form 2Form2 June 25 signed.pdf · uploaded 18 Nov 2025Source
  • Withdrawal Update Form 2Form 2 sept 25 signed.pdf · uploaded 18 Nov 2025Source
  • Withdrawal Update Form 3Form 3 June 25 signed_compressed.pdf · uploaded 18 Nov 2025Source
  • Withdrawal Update Form 3Form 3 signed sept 25_compressed (1).pdf · uploaded 18 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 5 FY 24-25 Audumber Builders and Developers.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Form 1 Dec 25.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 2Form 2 dec 25.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 ABD.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 1Signed Form 1 as on March 2026__Audumber Crown.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 2Signed Form 2 Audumber Crown as on March 2026.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 3Signed Form 3 of Audumber Crown as on March 2026.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 1Signed Form 1 as on June 2026__Audumber Crown.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Signed Form 2 Audumber Crown as on June 2026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Signed Form 3 of Audumber Crown as on June 2026.pdf · uploaded 20 Jul 2026Source

Technical

  • DocumentLayout Approval.pdf · uploaded 24 May 2023Source
  • DocumentBuilding Plan Approval.pdf · uploaded 24 May 2023Source
  • DocumentBlue Print New.pdf · uploaded 4 Apr 2025Source
  • DocumentBlue Print New.pdf · uploaded 4 Apr 2025Source

Technical (Architect)

  • DocumentForm 1 March 2024.pdf · uploaded 19 Feb 2025Source
  • DocumentForm 1 June 2024.pdf · uploaded 19 Feb 2025Source
  • DocumentForm 1 September 2024.pdf · uploaded 19 Feb 2025Source
  • DocumentForm 1 December 2024.pdf · uploaded 19 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 4 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 29 Apr 2025Source
  • DocumentSigned Form 1 as on June 2026__Audumber Crown.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 March 2024.pdf · uploaded 19 Feb 2025Source
  • DocumentForm 2 June 2024.pdf · uploaded 19 Feb 2025Source
  • DocumentForm 2 September 2024.pdf · uploaded 19 Feb 2025Source
  • DocumentForm 2 Dec 2024.pdf · uploaded 19 Feb 2025Source
  • DocumentForm 2.pdf · uploaded 4 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 29 Apr 2025Source
  • DocumentSigned Form 2 Audumber Crown as on June 2026.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Badlapur (M Cl), Ambarnath taluka

Survey, CTS, gat or plot numbers

H No3/3Plot No 1S NO 25

Boundaries

North
Mayureshwar Chs
South
Chakrapani Chs
East
Swami Siddhant Building
West
30 Mtrwide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRahul Shrikhande &Associates—
Chartered accountantAska & Co—
EngineerAtul Kudtarkar & Associates Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.