Sukhdev Nagar Phase 3

Certificate Signed

Barshi, Solapur 413401 |Promoter: Rsm Nest Developers

Residential / Group HousingRERAP52600020391
9 Apr 2019Registered with MahaRERA
30 Dec 2024Promised completion
10Buildings
500Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
10
Unit types
1 BHK RESIDENTIAL, 1BHK RESIDENTIAL500 units in all
Address
1240/2/4, Tadsaudane Road, BarshiPIN 413401
Designated bank account
82
Developed in phases
Yes

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2024

The latest completion date on record passed 1 year and 10 months ago.

Registered
9 Apr 2019
Promised
30 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P526000203919 Apr 201930 Dec 202430 Dec 2024Rsm Nest DevelopersProject page

10 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A1550
B1550
C1540
D1550
E1550
F1550
G1550
H1550
I1550
J1560

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 500 units booked (0%), as the promoter reported to MahaRERA

1 BHK RESIDENTIAL · 140 units1BHK RESIDENTIAL · 360 units
BuildingTypeCarpet areaUnitsBooked
A11 BHK RESIDENTIAL29.74 sq m · 320 sq ft500
B11 BHK RESIDENTIAL29.74 sq m · 320 sq ft500
C11 BHK RESIDENTIAL29.74 sq m · 320 sq ft400
D11BHK RESIDENTIAL29.74 sq m · 320 sq ft500
E11BHK RESIDENTIAL29.74 sq m · 320 sq ft500
F11BHK RESIDENTIAL29.74 sq m · 320 sq ft500
G11BHK RESIDENTIAL29.74 sq m · 320 sq ft500
H11BHK RESIDENTIAL29.74 sq m · 320 sq ft500
I11BHK RESIDENTIAL29.74 sq m · 320 sq ft500
J11BHK RESIDENTIAL29.74 sq m · 320 sq ft600

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 134 filings listed on MahaRERA's project page

Registration certificate

Legal

  • Declaration Form BB form declaration 3rd phase_compressed.pdf · uploaded 18 Mar 2019Source
  • Legal Title reportSearch report.pdf · uploaded 22 Mar 2019Source

Migrated

  • 1 Declaration in FORM BB form declaration 3rd phase_compressed.pdf · uploaded 18 Mar 2019Source
  • 1 Copy of the legal title reportSearch report.pdf · uploaded 22 Mar 2019Source
  • 1 Details of encumbrancesNo Ecumbraces Phase-3.pdf · uploaded 22 Mar 2019Source
  • 1 Copy of Layout Approval (in case of layout)Layout plan Sukhdeo Nagar_compressed.pdf · uploaded 22 Mar 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentMhada certificate.pdf · uploaded 22 Mar 2019Source
Show all 135 documentsShow fewer documents

Migrated

  • 1 Proforma of Allotment letterMEREGED.pdf · uploaded 22 Mar 2019Source
  • 1 Certificates of CA (Form 3)CA certificate (4).pdf · uploaded 26 Mar 2019Source
  • 1 Building Plan Approval (IOD)Epson711 (2).pdf · uploaded 8 Apr 2019Source
  • 2 Building Plan Approval (IOD)Epson712 (1).pdf · uploaded 8 Apr 2019Source
  • 3 Building Plan Approval (IOD)Epson713.pdf · uploaded 8 Apr 2019Source
  • 4 Building Plan Approval (IOD)Epson712 (1).pdf · uploaded 8 Apr 2019Source
  • 13 Certificates of CA (Form 3)SCANNED COPY Q1_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 14 Certificates of CA (Form 3)SCANNED COPY Q2_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 15 Certificates of CA (Form 3)SCANNED COPY Q3_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 16 Certificates of CA (Form 3)SCANNED COPY Q4_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 17 Certificates of CA (Form 3)SCANNED COPY Q1_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 18 Certificates of CA (Form 3)SCANNED COPY Q2_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 19 Certificates of CA (Form 3)SCANNED COPY Q2_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 20 Certificates of CA (Form 3)SCANNED COPY Q3_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 21 Certificates of CA (Form 3)SCANNED COPY Q4_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 11 Certificates of CA (Form 3)SCANNED COPY Q3_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 12 Certificates of CA (Form 3)SCANNED COPY Q4_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 1 Certificates of CA (Form 3)Q1 Scanned copy_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 2 Certificates of CA (Form 3)Scanned Copy Q2_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 3 Certificates of CA (Form 3)Scanned Copy Q3_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 4 Certificates of CA (Form 3)Scanned Copy Q4_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 5 Certificates of CA (Form 3)SCANNED COPY Q1_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 6 Certificates of CA (Form 3)SCANNED COPY Q2_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 7 Certificates of CA (Form 3)SCANNED COPY Q3_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 8 Certificates of CA (Form 3)SCANNED COPY Q4_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 9 Certificates of CA (Form 3)SCANNED COPY Q1_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 10 Certificates of CA (Form 3)SCANNED COPY Q2_merged_11zon.pdf · uploaded 16 Dec 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 22-23 Q4.pdf · uploaded 17 Dec 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 20-21 Q4.pdf · uploaded 17 Dec 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 22-23 Q3.pdf · uploaded 17 Dec 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 22-23 Q2.pdf · uploaded 17 Dec 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 22-23 Q1.pdf · uploaded 17 Dec 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 21-22 Q4.pdf · uploaded 17 Dec 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 21-22 Q3.pdf · uploaded 17 Dec 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 21-22 Q2.pdf · uploaded 17 Dec 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 21-22 Q1.pdf · uploaded 17 Dec 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 20-21 Q3.pdf · uploaded 17 Dec 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 20-21 Q2.pdf · uploaded 17 Dec 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 20-21 Q1.pdf · uploaded 17 Dec 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 19-20 Q4.pdf · uploaded 17 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 19-20 Q3.pdf · uploaded 17 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 19-20 Q2.pdf · uploaded 17 Dec 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 19-20 Q1.pdf · uploaded 17 Dec 2024Source
  • 22 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC phase 3 Q2 24-25.pdf · uploaded 18 Dec 2024Source
  • 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC Phase 3 Q1 24-25.pdf · uploaded 18 Dec 2024Source
  • 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 23-24 Q4 PHASE-3.pdf · uploaded 18 Dec 2024Source
  • 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 23-24 Q3 PHASE 3.pdf · uploaded 18 Dec 2024Source
  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 23-24 Q2 PHASE 3.pdf · uploaded 18 Dec 2024Source
  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 23-24 Q1 PHASE 3.pdf · uploaded 18 Dec 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q 2 FY 19 20 Q2.pdf · uploaded 20 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q 1 FY 19-20.pdf · uploaded 20 Dec 2024Source
  • 22 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q2 FY 24 25 Ph 3.pdf · uploaded 20 Dec 2024Source
  • 21 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q1 FY 24 25 PH 3_.pdf · uploaded 20 Dec 2024Source
  • 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q4 FY 23 24 PH 3.pdf · uploaded 20 Dec 2024Source
  • 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q3 FY 23 24 PH 3.pdf · uploaded 20 Dec 2024Source
  • 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q2 FY 23 24 PH 3.pdf · uploaded 20 Dec 2024Source
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q1 FY 23 24 PH 3.pdf · uploaded 20 Dec 2024Source
  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q4 FY 22 23 PH 3.pdf · uploaded 20 Dec 2024Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q3 FY 22 23 PH 3.pdf · uploaded 20 Dec 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q2 FY 22 23 PH 3.pdf · uploaded 20 Dec 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q1 FY 22-23 PH 3.pdf · uploaded 20 Dec 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q3 FY 21 22 PH 3.pdf · uploaded 20 Dec 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q2 FY 21 22 PH 3.pdf · uploaded 20 Dec 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q1 FY 21 22 PH 3.pdf · uploaded 20 Dec 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q4 FY 20 21 PH 4.pdf · uploaded 20 Dec 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q3 FY 20 21 PH 3.pdf · uploaded 20 Dec 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q2 FY 20 21 Ph 3.pdf · uploaded 20 Dec 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q1 FY 20 21 PH 3.pdf · uploaded 20 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q4 FY 19 20 PH 3.pdf · uploaded 20 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q3 FY 19 20 PH 3.pdf · uploaded 20 Dec 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC Q4 FY 21 22 PH 3.pdf · uploaded 20 Dec 2024Source
  • 22 Certificates of CA (Form 3)Scaned Copy signed.pdf · uploaded 28 Dec 2024Source
  • 23 Certificates of CA (Form 3)Scaned Copy signed.pdf · uploaded 28 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Phase 3 FY 2019-20.pdf · uploaded 31 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Phase 3 FY 2020-21.pdf · uploaded 31 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Phase 3 FY 2021-22.pdf · uploaded 31 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Phase 3 FY 2022-23.pdf · uploaded 31 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Phase 3 FY 2023-24.pdf · uploaded 31 Dec 2024Source

Technical

  • DocumentLayout plan Sukhdeo Nagar_compressed.pdf · uploaded 22 Mar 2019Source
  • DocumentEpson711 (2).pdf · uploaded 8 Apr 2019Source
  • DocumentEpson712 (1).pdf · uploaded 8 Apr 2019Source
  • DocumentEpson713.pdf · uploaded 8 Apr 2019Source
  • DocumentEpson712 (1).pdf · uploaded 8 Apr 2019Source

Technical (Architect)

  • DocumentAC Q 1 FY 19-20.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q 2 FY 19 20 Q2.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q3 FY 19 20 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q4 FY 19 20 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q1 FY 20 21 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q2 FY 20 21 Ph 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q3 FY 20 21 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q4 FY 20 21 PH 4.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q1 FY 21 22 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q2 FY 21 22 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q3 FY 21 22 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q4 FY 21 22 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q1 FY 22-23 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q2 FY 22 23 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q3 FY 22 23 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q4 FY 22 23 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q1 FY 23 24 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q2 FY 23 24 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q3 FY 23 24 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q4 FY 23 24 PH 3.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q1 FY 24 25 PH 3_.pdf · uploaded 20 Dec 2024Source
  • DocumentAC Q2 FY 24 25 Ph 3.pdf · uploaded 20 Dec 2024Source

Technical (Engineer)

  • DocumentEC 19-20 Q1.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 19-20 Q2.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 19-20 Q3.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 19-20 Q4.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 20-21 Q1.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 20-21 Q2.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 20-21 Q3.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 20-21 Q4.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 21-22 Q1.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 21-22 Q2.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 21-22 Q3.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 21-22 Q4.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 22-23 Q1.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 22-23 Q2.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 22-23 Q3.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 22-23 Q4.pdf · uploaded 17 Dec 2024Source
  • DocumentEC 23-24 Q1 PHASE 3.pdf · uploaded 18 Dec 2024Source
  • DocumentEC 23-24 Q2 PHASE 3.pdf · uploaded 18 Dec 2024Source
  • DocumentEC 23-24 Q3 PHASE 3.pdf · uploaded 18 Dec 2024Source
  • DocumentEC 23-24 Q4 PHASE-3.pdf · uploaded 18 Dec 2024Source
  • DocumentEC Phase 3 Q1 24-25.pdf · uploaded 18 Dec 2024Source
  • DocumentEC phase 3 Q2 24-25.pdf · uploaded 18 Dec 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Barshi, Barshi taluka

Survey, CTS, gat or plot numbers

1240/2/4

Boundaries

North
Gat No 1240 1
South
Open Space
East
Latur Kurdwadi bypass
West
Lig Ews 3

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPoonam Mirgane—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology