Sukhdev Nagar Phase 2
Certificate SignedBarshi, Solapur 413401 |Promoter: Rsm Nest Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 8
- Unit types
- Residential405 units in all
- Address
- 1239/2/1/1, Barshi, 2511 Tel Girni ChowkPIN 413401
- Designated bank account
- 82
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 2 years
- Registered
- 5 Mar 2019
- Promised
- 30 Dec 2024
- Revised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52600019858 | 5 Mar 2019 | 30 Dec 2024 | 31 Dec 2026 | Rsm Nest Developers | Project page |
8 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
35 of 405 units booked (9%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| F | Residential | 29.74 sq m · 320 sq ft | 60 | 0 |
| G | Residential | 29.95 sq m · 322 sq ft | 60 | 0 |
| H | Residential | 29.95 sq m · 322 sq ft | 60 | 35 |
| J | Residential | 29.95 sq m · 322 sq ft | 60 | 0 |
| K | Residential | 29.95 sq m · 322 sq ft | 60 | 0 |
| L | Residential | 29.95 sq m · 322 sq ft | 60 | 0 |
| M | Residential | 29.95 sq m · 322 sq ft | 45 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 162 filings listed on MahaRERA's project page
Finance
- PAN CardPAN.pdf · uploaded 16 Jun 2025Source
Legal
Show all 164 documentsShow fewer documents
Migrated
- 1 Building Plan Approval (IOD)Building layout.pdf · uploaded 2 Mar 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentMhada certificate.pdf · uploaded 2 Mar 2019Source
- 1 Certificates of CA (Form 3)12 rsm (1).pdf · uploaded 4 Mar 2019Source
- 1 Declaration in FORM BB Form Phase-2_compressed (1).pdf · uploaded 5 Mar 2019Source
- 1 Proforma of Allotment letterMerged.pdf · uploaded 5 Mar 2019Source
- 2 Certificates of CA (Form 3)Form 3 CA certificate Q1- Signed_11zon.pdf · uploaded 4 Jul 2023Source
- 3 Certificates of CA (Form 3)Form 3 CA certificate Q2-signed_11zon.pdf · uploaded 4 Jul 2023Source
- 4 Certificates of CA (Form 3)form 3 CA certificate Q3- signed_11zon.pdf · uploaded 4 Jul 2023Source
- 5 Certificates of CA (Form 3)Form 3 CA certificate Q4 - signed_11zon.pdf · uploaded 4 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5_FY 19-20.pdf · uploaded 15 Sep 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ArCHITECT CERTIFICATE Q1 form 1.pdf · uploaded 18 Oct 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ArCHITECT CERTIFICATE Q2 form 1.pdf · uploaded 18 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ArCHITECT CERTIFICATE Q3 form 1.pdf · uploaded 18 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ArCHITECT CERTIFICATE Q4 form 1.pdf · uploaded 18 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA Q1- Engineer Certificate_11zon.pdf · uploaded 18 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA Q2- Engineer Certificate_11zon.pdf · uploaded 18 Oct 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA Q3- Engineer Certificate_11zon.pdf · uploaded 18 Oct 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA Q4- Engineer Certificate_11zon.pdf · uploaded 18 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q1 Fy 20-21.pdf · uploaded 22 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q2 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q3 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q4 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineer Certificate Q1 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineer Certificate Q2 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 7 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineer Certificate Q3 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineer Certificate Q1 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineer Certificate Q2 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineer Certificate Q3 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineer Certificate Q4 FY 20-21.pdf · uploaded 22 Oct 2023Source
- 6 Certificates of CA (Form 3)Form 3 Q1- All.pdf · uploaded 22 Oct 2023Source
- 7 Certificates of CA (Form 3)Form 3 Q2 All.pdf · uploaded 22 Oct 2023Source
- 8 Certificates of CA (Form 3)Form 3 Q3 All.pdf · uploaded 22 Oct 2023Source
- 9 Certificates of CA (Form 3)Form 3 Q4 All.pdf · uploaded 22 Oct 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q1.pdf · uploaded 21 Mar 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q2.pdf · uploaded 21 Mar 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q3.pdf · uploaded 21 Mar 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q4.pdf · uploaded 21 Mar 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA ENGG CERTIFICATE Q1.pdf · uploaded 21 Mar 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA ENGG CERTIFICATE Q2.pdf · uploaded 21 Mar 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA ENGG CERTIFICATE Q3.pdf · uploaded 21 Mar 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA ENGG CERTIFICATE Q4.pdf · uploaded 21 Mar 2024Source
- 10 Certificates of CA (Form 3)Form-3 Q1 FY 2021-22_11_DSC.pdf · uploaded 21 Mar 2024Source
- 11 Certificates of CA (Form 3)Form-3 Q2 FY 2021-22_11_dsc.pdf · uploaded 21 Mar 2024Source
- 12 Certificates of CA (Form 3)Form-3 Q3 FY 2021-22_11_DSC.pdf · uploaded 21 Mar 2024Source
- 13 Certificates of CA (Form 3)Form-3 Q4 FY 2021-22_11_DSC.pdf · uploaded 21 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)RSM Nest Developers Form5 Certificate 20-21 (1).pdf · uploaded 23 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form-5 for FY 2021-22_11zon.pdf · uploaded 19 Apr 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate 2022-23 Q1.pdf · uploaded 18 May 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate 2022-23 Q2.pdf · uploaded 18 May 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate 2022-23 Q3.pdf · uploaded 18 May 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate 2022-23 Q4.pdf · uploaded 18 May 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY 22-23 Q-1.pdf · uploaded 18 May 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY 22-23 Q-2.pdf · uploaded 18 May 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY22-23 Q-3.pdf · uploaded 18 May 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY 22-23 Q-4.pdf · uploaded 18 May 2024Source
- 14 Certificates of CA (Form 3)Form 3 for Q1 FY 2022-23.pdf · uploaded 18 May 2024Source
- 15 Certificates of CA (Form 3)Form-3 for Q2 FY 2022-23_11zo.pdf · uploaded 18 May 2024Source
- 16 Certificates of CA (Form 3)Form-3 for Q3 FY 2022-23_11zon DSC.pdf · uploaded 18 May 2024Source
- 17 Certificates of CA (Form 3)Form-3 for Q4 FY 2022-23_11zon DSC.pdf · uploaded 18 May 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate FY_23-24 Q-2_11zon.pdf · uploaded 28 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate FY_23-24 Q-3.pdf · uploaded 28 Dec 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate FY_23-24 Q-4.pdf · uploaded 28 Dec 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate FY_24-25 Q-1.pdf · uploaded 28 Dec 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate FY_24-25 Q-2.pdf · uploaded 28 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate FY_23-24 Q-1.pdf · uploaded 28 Dec 2024Source
- 8 Certificates of CA (Form 3)Scaned doc_11zon signed.pdf · uploaded 28 Dec 2024Source
- 12 Certificates of CA (Form 3)scaned Doc_11zon signed.pdf · uploaded 28 Dec 2024Source
- 11 Certificates of CA (Form 3)Scaned Doc_11zon signed.pdf · uploaded 28 Dec 2024Source
- 10 Certificates of CA (Form 3)Scaned Doc_11zon signed.pdf · uploaded 28 Dec 2024Source
- 9 Certificates of CA (Form 3)Scaned Doc_11zon signed.pdf · uploaded 28 Dec 2024Source
- 7 Certificates of CA (Form 3)Scaned Document_11zon signed.pdf · uploaded 28 Dec 2024Source
- 6 Certificates of CA (Form 3)scaned Doc signed_11zon.pdf · uploaded 28 Dec 2024Source
- 5 Certificates of CA (Form 3)Scaned Doc signed_11zon.pdf · uploaded 28 Dec 2024Source
- 4 Certificates of CA (Form 3)Scaned Doc signed_11zon.pdf · uploaded 28 Dec 2024Source
- 3 Certificates of CA (Form 3)Scaned Doc signed_11zon.pdf · uploaded 28 Dec 2024Source
- 2 Certificates of CA (Form 3)Scaned doc signed_11zon.pdf · uploaded 28 Dec 2024Source
- 1 Certificates of CA (Form 3)Scaned Document signed_11zon.pdf · uploaded 28 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY 23-24 Q-1 (1).pdf · uploaded 28 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY 23-24 Q-2.pdf · uploaded 28 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY 23-24 Q-3.pdf · uploaded 28 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY 23-24 Q-4.pdf · uploaded 28 Dec 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY 24-25 Q-1.pdf · uploaded 28 Dec 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate FY 24-25 Q-2.pdf · uploaded 28 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Phase 2 FY 2022-23.pdf · uploaded 31 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Phase 2 FY 2023-24.pdf · uploaded 31 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 17 Mar 2025Source
- 1 Certificates of CA (Form 3)Form 3_.pdf · uploaded 17 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate.pdf · uploaded 17 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 3 May 2025Source
- 1 Certificates of CA (Form 3)Form 3_Q4_Phase 2_11zon.pdf · uploaded 3 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 3 May 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - April to June - 2024.pdf · uploaded 11 Jun 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - July to Sept - 2024.pdf · uploaded 11 Jun 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Oct to December - 2024.pdf · uploaded 11 Jun 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Jan to March - 2025.pdf · uploaded 11 Jun 2025Source
- 1 Certificates of CA (Form 3)Form - 3 - 31032025.pdf · uploaded 11 Jun 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - April to June - 2024.pdf · uploaded 11 Jun 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - July - Sept - 2024.pdf · uploaded 11 Jun 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Oct to December - 2024.pdf · uploaded 11 Jun 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Jan to March - 2025.pdf · uploaded 11 Jun 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - 2019 - 2020.pdf · uploaded 11 Jun 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - 2020 - 2021.pdf · uploaded 11 Jun 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 - 2021 - 2022.pdf · uploaded 11 Jun 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - 2022 - 2023.pdf · uploaded 11 Jun 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - 2023 - 2024.pdf · uploaded 11 Jun 2025Source
- 1 PAN CardPAN.pdf · uploaded 16 Jun 2025Source
- 1 Details of encumbrancesFinancial Enc.pdf · uploaded 16 Jun 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold 30062024_2_11zon.pdf · uploaded 16 Jun 2025Source
- 2 Disclosure of sold/ booked inventorySold Unsold 31032024_4_11zon.pdf · uploaded 16 Jun 2025Source
- 3 Disclosure of sold/ booked inventorySold Unsold 30092024_3_11zon.pdf · uploaded 16 Jun 2025Source
- 4 Disclosure of sold/ booked inventorySold Unsold 31122024_1_11zon.pdf · uploaded 16 Jun 2025Source
- 5 Disclosure of sold/ booked inventorySold Unsold 31032025_5_11zon.pdf · uploaded 16 Jun 2025Source
- 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 16 Jun 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A.pdf · uploaded 16 Jun 2025Source
- 1 Deviation Report with respect to Allotment letterNo dev Allotment letter.pdf · uploaded 16 Jun 2025Source
- 1 Deviation Report with respect to model copy of AgreementNo dev AFS.pdf · uploaded 16 Jun 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A 21-22.pdf · uploaded 16 Jun 2025Source
- 1 Proforma of Agreement for saleafs.pdf · uploaded 16 Jun 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDoI.pdf · uploaded 16 Jun 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A 22-23.pdf · uploaded 16 Jun 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A 23-24.pdf · uploaded 16 Jun 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsForm 3.pdf · uploaded 17 Jun 2025Source
- 1 a Details of encumbrances concerned to FinanceLegal Enc.pdf · uploaded 18 Jun 2025Source
- 1 CERSAI detailsCERSAI_Search_Report_200358990402_For_Debtor_Based_Search_18_06_2025_16_39_37_934.pdf · uploaded 18 Jun 2025Source
- 1 b Details of encumbrances concerned to LegalLegal Enc.pdf · uploaded 18 Jun 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectSec Unsec Decl.pdf · uploaded 18 Jun 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentFurther CC.pdf · uploaded 21 Jun 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)form 5.pdf · uploaded 21 Jun 2025Source
Technical
Technical (Architect)
- DocumentArchitect Certificate 2022-23 Q4.pdf · uploaded 18 May 2024Source
- DocumentArch Certificate FY_23-24 Q-1.pdf · uploaded 28 Dec 2024Source
- DocumentArch Certificate FY_23-24 Q-2_11zon.pdf · uploaded 28 Dec 2024Source
- DocumentArch Certificate FY_23-24 Q-3.pdf · uploaded 28 Dec 2024Source
- DocumentArch Certificate FY_23-24 Q-4.pdf · uploaded 28 Dec 2024Source
- DocumentArch Certificate FY_24-25 Q-1.pdf · uploaded 28 Dec 2024Source
- DocumentArch Certificate FY_24-25 Q-2.pdf · uploaded 28 Dec 2024Source
- DocumentArchitect Certificate.pdf · uploaded 17 Mar 2025Source
- DocumentArchitect Certificate.pdf · uploaded 3 May 2025Source
- DocumentForm 1 - April to June - 2024.pdf · uploaded 11 Jun 2025Source
- DocumentForm 1 - July to Sept - 2024.pdf · uploaded 11 Jun 2025Source
- DocumentForm 1 - Oct to December - 2024.pdf · uploaded 11 Jun 2025Source
- DocumentForm 1 - Jan to March - 2025.pdf · uploaded 11 Jun 2025Source
Technical (Engineer)
- DocumentEngineer Certificate FY 22-23 Q-4.pdf · uploaded 18 May 2024Source
- DocumentEngineer Certificate FY 23-24 Q-1 (1).pdf · uploaded 28 Dec 2024Source
- DocumentEngineer Certificate FY 23-24 Q-2.pdf · uploaded 28 Dec 2024Source
- DocumentEngineer Certificate FY 23-24 Q-3.pdf · uploaded 28 Dec 2024Source
- DocumentEngineer Certificate FY 23-24 Q-4.pdf · uploaded 28 Dec 2024Source
- DocumentEngineer Certificate FY 24-25 Q-1.pdf · uploaded 28 Dec 2024Source
- DocumentEngineer Certificate FY 24-25 Q-2.pdf · uploaded 28 Dec 2024Source
- DocumentEngineers certificate.pdf · uploaded 17 Mar 2025Source
- DocumentEngineer Certificate.pdf · uploaded 3 May 2025Source
- DocumentForm 2 - April to June - 2024.pdf · uploaded 11 Jun 2025Source
- DocumentForm 2 - July - Sept - 2024.pdf · uploaded 11 Jun 2025Source
- DocumentForm 2 - Oct to December - 2024.pdf · uploaded 11 Jun 2025Source
- DocumentForm 2 - Jan to March - 2025.pdf · uploaded 11 Jun 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Barshi, Barshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Gat No 1239 1
- South
- 12 M Road
- East
- Residential Building 05
- West
- Tadsaundane
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Poonam Mirgane | — |
Source: MahaRERA project page. Contact details are not shown.